Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was more than two weeks ago

Male, 39 years, born on 27 December 1986

Temirtau, willing to relocate, prepared for business trips

Leading process piping engineer

Specializations:
  • Construction project manager

Employment type: full time, project work/one-time assignment

Work experience 11 years 10 months

August 2023currently
2 years 10 months
Udokan copper

Novaya Chara, udokancopper.ru/

Mining Industry... Show more

Pipeline lead engineer
1. Ensuring timely handover of construction sites to subcontracting organizations, maintaining records of site transfers. 2. Participation in the formation of monthly task plans and construction budget planning. 3. Ensuring daily monitoring of contractors' execution of approved monthly task plans and overall work schedule. 4. Coordinating the work of subcontracting organizations and managing contract support, providing necessary materials and information for project execution. Ensuring and controlling the issuance of required working documentation and initial-permitting documentation. 5. Monitoring timely provision of coordinated organizational and technical documentation on the construction site (method statement, technological maps, testing and commissioning programs), and participating in its approval. 6. Participating in interim and final acceptance of works, intermediate and final acceptance of responsible structures, individual and comprehensive testing. Verifying compliance of executive documentation with the requirements of acts certifying the inspection of works, structures, utilities system, and signing executive documentation as part of other individuals on construction control matters. 7. Verifying the scopes of work specified in the executive documentation, in acts of completed work in the form of КС-2, and in Journals of completed work in the form of KC-6a, for compliance with the scopes of actually completed work. 8. Keeping cumulative records of completed work in accordance with the total scope of work, including paid and additional work. Ensuring control and accounting of additional work arising during construction, conducting an analysis of the reasons for identifying additional work, and ensuring the coordination and payment of additional work. 9. Initiating changes to working documentation as necessary. 10. Ensuring the interaction of departments with design supervision. 11. Organizing the handover of completed construction projects for operation. 12. Initiating the suspension of construction, installation, and commissioning works in case of violations of deadlines and/or quality of their execution.
February 2022December 2022
11 months
Tengizchevroil (TCO) via Bolashak recruiting

Atyrau, www.bolashak.com/

Construction, Real Estate, Architecture... Show more

Mechanical and piping supervisor (process piping and mechanical rotating equipment). Permit Approver/ Area Controller.
Assigned as Permit Approver/ Area Controller with the right to issue and sign permits to work at the 3GP, TCO (Third Generation Plant). Control and coordination of construction and pre commissioning contractor's activities for piping and mechanical discipline. Responsibility of overseeing the following functions from installation to handover of Structural, Field / Shop Piping / Modules and Equipment Responsible for supervising module hook up, Carryover work and other duties as assigned/directed by the Project Team Supervision and coordination the work activities with the Mechanical contractor and all mechanical and piping construction-related Business Partners along with support activities Monitoring construction activities to ensure adherence to safety and quality standards and to achieve work efficiency Ensuring the Contractor performs work in conformance with plans, specifications, schedules, cost control estimates and 120 Day schedule and 4 Week look ahead Monitors 4WLH Scheduled activities and ensures equipment and manpower requirements are met to support the established completion dates Coordinates craft personnel, material, and equipment needed to meet schedules including SIMOPS operations Review of work assignments with craft supervisors and gives instruction relative to the methods and procedures that can be used. Rotating & Static Equipment Construction Experience: Pumps: Centrifugal Pumps, Positive Displacement Pumps, Reciprocating pumps, Rotary Pumps Compressors: reciprocating, Rotary Screw, Rotary Centrifugal Static Equipments: Heat Exchanger,Process Vessel, Storage Tanks, Piping System, valves. Familiarized with SI-105 (TCO) and SI-106(TCO) in particular. Knowledge of oil processing facilities and equipment operations, work practices, and operating procedures.
October 2019November 2021
2 years 2 months
KAZ MINERALS (KPBV)

Kazakhstan, www.kazminerals.com/ru/

Metallurgy, Metalwork... Show more

Piping and mechanical supervisor
Assigned as Permit Approver/ Area Controller with the right to issue and sign permits to work at the Dry process area, Infrastructure areas on Aktogay 2 project. Providing mechanical and piping related support/direction to the Construction Group; Providing of status construction completion based on Construction Completion Management System (CCMS) on stage of hand over to pre-Comissioning department , involvement with System Completion work processes. Jointly conducting of Construction Completion walkdowns, issue of a punch list in cooperate with comissioning department from each sub-systen to full system completion, folowing LOTO procedures after C0 procedures stages Providing of status construction completion based on Construction Completion Management System (CCMS) on stage of hand over to pre-Comissioning department , involvement with System Completion work processes. Jointly conducting of Construction Completion walkdowns, issue of a punch list in cooperate with comissioning department from each sub-systen to full system completion, folowing LOTO procedures after C0 procedures stages Supervising of mechanical & piping construction activities; Inspection, monitoring and ensuring that all mechanical engineering and piping related construction (field) activities are in compliance with construction related Republic of Kazakhstan regulations and to all engineering, construction, HSE (Health, Safety and Environment) and QA/QC requirements. To be aware of all Health and Safety requirements as set out in the Project HSE Policy document and Resume updated 26 October 2021 at 11:27 Operating Manual and all updates and revisions of same allocating 20 - 25% of hrs worked to these tasks and to be aware on a proactive level of all and any HSE issues that occur on a day to day bases actively resolving and reporting such events; Implement and maintain a Zero Harm environment; Perform and review risk assessments and risk evaluations; Evaluate suppliers, vendors and service providers; Assist with compiling scope of work and schedules for tenders and contracts; Source discipline related construction materials, equipment, machinery, etc. required on site; Enforce the KPBV construction schedule for the Aktogay project; Monitor and record Contractors’ progress against project schedule and key milestones; Ensure that all Contractors are fully aware of the planned scope of activity on a daily, weekly and monthly schedule; Act on any non-conforming works or practices; Alert the Construction Manager and/or Area Manager of any delays or potential delays; Ensure that all materials, machinery and equipment conform to the specifications and quality standards; Evaluate construction against mechanical & piping drawings, and record and report any deviation or change to the agreed design; Analyze the Contractors’ workforce in terms of skills, suitability to operation and numbers deployed; Analyze Contractors’ man-hours against budget and report all variations; Liaise with Quality management to ensure that the specifications and quality standards are being achieved and adhered to in line with contract conditions; The completion and timely submission of construction reports, accurately record all works for this purpose; Awareness of all materials brought to approved lay down areas and monitor that storage is managed in line with material types and requirements for construction; Ensure that all day work is properly monitored and supervised in all respects; Awareness of all site traffic - ensure that procedures and traffic management are in place for movement in and around the overall site. All other duties and task as required by the Line manager.
June 2019October 2019
5 months
Bonatti S.p.A Kazakhstan Branch

Atyrau, www.bonatti.it

Construction, Real Estate, Architecture... Show more

Pipeline supervisor \Начальник участка технологических трубопроводов, супервайзер
Responsibilities include: • communicating the construction requirement to all employees and ensuring compliance with the safety plan, quality plan and client requirements • Supervision and guidance of pipeline technicians to ensure site performance and efficiency in line with contract objectives • Monitor and coordinate the activities of the pipeline foreman in designated areas • Provide daily supervisory checks and records, ensuring that management and supervision provide safe working conditions and permitting procedures, protective equipment, experienced / skilled supervision and workforce, with reliable, well maintained equipment to carry out contract work according to schedule and objectives contract • Strong understanding of safety and adherence to safe work practices during the on-site work phase. • Determine the sequencing of the system handover through the system, by area, all scheduled to perform logically scheduled shutdowns for commissioning and startup requirements. • Perform other tasks upon request from the Building Superintendent.
April 2019June 2019
3 months
Sicim

Atyrau

Piping supervisor\Начальник участка механомонтажных и трубомонтажных работ
Bring to the attention of subordinate employees the tasks assigned to them. Work organization. Organize monitoring and control over the compliance with the work schedule, the implementation of specific volumes of work, established work quality standards. To check the provision of employees with material and information resources necessary to fulfill their responsibilities, measures are taken to prevent downtime, accidents, temporary outages The agreement entered into force and is valid at the time of performance of certain works in accordance with revocation No. 25 to Contract No. 1242796 with Ersai Caspian Contractor LLC.
June 2018March 2019
10 months
Ariadna LLP

Atyrau, www.ariadna.kz/

Construction, Real Estate, Architecture... Show more

Mechanical and piping superintendent\Начальник механомонтажного участка
Ensuring the fulfillment of the construction and installation work plan in the operational technical zone (OTZ) at the customer's site TCO Tengizchevroil: KTL, Drilling base, well, Manual and technical control of welding. Provision of working tools, tools, small mechanization, clothing, transport and protective equipment. Site employees management. coordination of work with representatives of the TCO customer, task dispatchers, Bolashak inspectors. Currently, assembly work is being carried out at KTL1 (preparation for Turnover-2019): visual inspection of work packages, measurements, control over the production of tube assemblies and manufacturing in accordance with the work package. The following certifications are available: Medical Ambulance, Safety for Confined Spaces, Safe Earthwork, Work at Height, Health and Safety, Work with Pressure Vessels, (Work in a breathing apparatus), and the right to drive on TCO facilities.
January 2015December 2017
3 years
"Центрэнергомонтаж-Т" LLP

Kazakhstan, www.kps.kz/temirtau/company/tsentrenergomontaj-t_too

Construction, Real Estate, Architecture... Show more

construction mechanical supervisor
Reconstruction, Turnaround. 1 Organization of operational records of the implementation of production tasks, Performance of work: Reconstruction and major repairs of buildings at AMT objects (Arcelor Mittal Temirtau) 2. Ensuring the implementation of the plan of construction and installation work on the site. 3 Provision of workers with devices, tools, small-scale mechanization, working clothes, vehicles and protective equipment. 4 Management of workers of the site.                            Polished work: Object: AMT Installation of stairs, service platforms in the pump booster DP-4 (Blast furnace №4) Disassembly-assembly of roof segments (sinter plant factory) Disassembly-installation of the pipeline of the cooling unit of the converter shop. Disassembly-assembly, reinforcement of the crane girder of converter №3 of the converter shop. Disassembly-installation of bunkers in ZSU # 1, ZSU # 2 (Coal Coal Preparation Warehouse) Disassembly-installation of the gas line system of the scrubber and regenerator of the gas workshop.
March 2014April 2015
1 year 2 months
ООО СеверТрансСтрой

Russia, sevts.ru

Construction, Real Estate, Architecture... Show more

construction mechanical supervisor
Construction of oil and gas facilities Industrial construction Manual and technical control over welding; Groups of technical devices and production facilities: Oil and gas production equipment (paragraphs 1, 3, 4,5,12), building structures (paragraphs 1,2,3) Ensuring the implementation of the plan of construction and installation work on the site in accordance with the working drawings, outage and regulatory documents; control over compliance with the technological sequence of construction works and ensuring their proper quality; organization of acceptance of materials, structures, products, their storage, accounting and reporting; issue of orders, reception of the finished work, paperwork on the accounting of working time, development, downtime.                                Polished work: Object: CJSC Vankorneft (Vankorskoye field) Construction and supply of cable trestle 1800 m. To the gas candle. Construction and installation of lightning arresters at the complex gas treatment (UPKG) Construction and supply of the cable overpass 600 m to the UPKG Bank protection. construction and installation of ice cutters. Arrangement of oil and gas industry: Construction of temporary roads and access roads to objects of the oil and gas industry, installation of a geogrid, backfilling, installation of fences, drain systems.                        Boguchanskoe field. Development of RVS-300M fire extinguisher (tank) Scan RVS-5000 Installation of attachments, process equipment. Testing RVS-5000 Construction of foundations RVS-5000- 4 pcs.
April 2013December 2013
9 months
"Авангард-строй" LLP

Temirtau

Foreman of construction works (piping,mechanical, HVAC)\Мастер СМР
Ensuring the implementation of the plan of construction and installation works on the site Manual and technical control over welding. Providing workers with tools, tools, small-scale mechanization, clothing, transportation and protective equipment.   Management of workers of the site.         Object: Kokshetau ZIF (Gold Factory)                Polished work: construction and installation work on the construction of the 2nd crushing plant. Installation of columns, beams, trusses.

Skills

Skill proficiency levels
Гражданское строительство
Водительское удостоверение категории BC
Управление производством
Управление производственным персоналом
Строительство
Пользователь ПК
Промышленная безопасность
Работа с ТМЦ
Руководство коллективом
Строительный контроль
Компас
Компас-3D
Монтаж оборудования
Контроль качества

Driving experience

Driver's license category B, C

About me

Familiarized with : • Knowledge of oil processing facilities and equipment operations, work practices, and operating procedures. • Technically, Well versed in job functions and the roles and responsibilities of co-workers. • Knowledgeable in all TCO Safety Instructions and the TCO Integrated Incident Response Plan (IIRP). • Knowledgeable in activity planning and scheduling. • Good reading and understanding skills of engineering documents such as P&ID, Plot Plans and Maps. • Safety management – Isolation (Design & Effective Control). Ensuring the fulfillment of the construction and installation work plan in the operational technical zone (OTZ) at the customer's site TCO Tengizchevroil: KTL, Drilling base, well, Manual and technical control of welding. Provision of working tools, tools, small mechanization, clothing, transport and protective equipment. Site employees management. coordination of work with representatives of the TCO customer, task dispatchers, Bolashak inspectors. Currently, assembly work is being carried out at KTL1 (preparation for Turnover-2019): visual inspection of work packages, measurements, control over the production of tube assemblies and manufacturing in accordance with the work package. The following certifications are available: Medical Ambulance, Safety for Confined Spaces, Safe Earthwork, Work at Height, Health and Safety, Work with Pressure Vessels, (Work in a breathing apparatus), and the right to drive on TCO facilities.

Portfolio

Higher education (bachelor)

2013
Higher education (bachelor)

Languages

Russian — Native

English — B1 — Intermediate

Citizenship, travel time to work

Citizenship: Kazakhstan

Desired travel time to work: Doesn't matter