Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas today at 15:21
Male, 41 year, born on 5 February 1985
Atyrau, willing to relocate, prepared for business trips
Lead Piping Engineer
Specializations:
- Other
Employment type: full time
Work experience 19 years 11 months
May 2025 — currently
1 year
Lead Piping Engineer - 부장
Ensured compliance with international piping standards and project specifications, contributing to safe and efficient plant design.
Collaborated with multidisciplinary teams to optimize piping layouts, reducing material costs and improving constructability.
Provided technical guidance on high-pressure piping systems, ensuring integrity and reliability under challenging operating conditions.
Reviewed and validated design deliverables to maintain quality and minimize rework during construction phase.
Supported integration of piping systems with instrumentation and equipment, enhancing overall plant performance.
Key Skills:
Piping Design, P&ID Review, 3D Modeling (NAVIS), Isometric Drawings, Material Take-Off (MTO), Interface Management, Coordination with Construction and Fabrication, Compliance with Codes & Standards.
Project: Lake Charles Methanol II – Modular Fabrication & Delivery_/ Louisiana, USA
Client: Zachry
Description: Participated in the FEED stage of a modular Engineering, Procurement, and Fabrication (EPF) project for a methanol plant in Lake Charles, Louisiana. Responsibilities included piping design development, P&ID review, interface management, and contribution to the Module Fabrication Plan.
Project: – Kstova Gas & Oil Processing Plant Modernization Project / Nizhny Novgorod, Russia
Client: LUKOIL
Description: Contributed to the modernization and revamp of a gas and oil processing plant, supporting piping engineering activities to improve product quality through system upgrades, layout optimization, and integration of modern process units and equipment.
Project: Amur Gas Chemical Complex (AGCC) / Amur Region, Russia
Client: SIBUR
Description: Involved in piping design for a large gas chemical complex: P&ID review, 3D modeling, isometrics, and construction support per international and Russian standards.
January 2025 — July 2025
7 months
Kazakhstan
Business Services... Show more
Principal Piping Engineer
- Engineering of projects as per standards: ANSI & ASME:
- Preparation turnaround Mechanical & Piping Job Packs:
- Preparation all drawings Using AutoCad & Microstation programs:
- Preparation Piping General Arrangement and Isometric drawings:
- Preparation Material Requests for Pipe, fittings, valves & piping supports details:
- Preparation & Review of Data Sheets for piping parts:
- Includes the close work with Electrical, Instrumentation, Mechanical & Civil Departments. Also with a construction company while demolition & installation at the plant:
November 2023 — December 2024
1 year 2 months
Construction, Real Estate, Architecture... Show more
Lead Piping Engineer
- Participation in NCOC projects:
- Development of project documentation and drawings according to NCOC procedures;
- Provide discipline support to the business & participated in meetings and discussions with clients and contractors regarding issues;
- Responsible for developing preliminary estimates and scope to support project/process development;
- Preparation of the CTR;
- Preparation of the reports (site survey / weekly / monthly / 3D model review) ;
- Participation in and leading presentations at Design Reviews (30%60%,90%);
- Preparation and checking of the Job Pack, Line list, Tie-in schedule, Valve List, Piping MTO and piping isometric drawings;
- Preparation & Review of Data Sheets for piping parts;
- Preparation all drawings Using AutoCad;
- Review quotations from the Vendor.
January 2023 — November 2023
11 months
Kazakhstan
Business Services... Show more
Lead Piping Engineer
- Engineering of projects as per standards: ANSI & ASME:
- Preparation turnaround Mechanical & Piping Job Packs:
- Preparation all drawings Using AutoCad & Microstation programs:
- Preparation Piping General Arrangement and Isometric drawings:
- Preparation Material Requests for Pipe, fittings, valves & piping supports details:
- Preparation & Review of Data Sheets for piping parts:
- Includes the close work with Electrical, Instrumentation, Mechanical & Civil Departments. Also with a construction company while demolition & installation at the plant:
December 2020 — December 2022
2 years 1 month
Atyrau
Oil and Gas... Show more
Lead Piping Engineer
- Responsible for all piping work for Total projects (Dunga field):
- Solves issues related to all kind of piping engineering and design;
- Provide discipline support to the business & participated in meetings and discussions with clients and contractors regarding issues;
- Responsible for developing preliminary estimates and scope to support project/process development;
- Preparation of the CTR / CTR Basis.
- Review and approval MDR Schedule.
- Development of drawings (plans, sections, piping profiles) in AutoCad Plant 3D, CADWORX.
- Preparation of the Job Packs.
- Preparation of the 3D Model Procedure.
- Preparation of the reports (site survey / weekly / monthly / 3D model review).
- Participation in and leading presentations at Design Reviews (30%60%,90%).
- Development of piping isometric drawings, shut-down scope, material take-offs.
- Designing of drawings according to RoK construction norms and rules (GOST, SNIP).
- Designing of drawings according to TOTAL Standards, ANSI and ASME.
- Checking and final approval of the stress report.
October 2019 — November 2020
1 year 2 months
Aksay (Kazakhstan)
Lead Piping Engineer
- Responsible for all piping work for projects;
- Solves issues related to all kind of piping engineering and design;
- Provide discipline support to the business & participated in meetings and discussions with clients and contractors regarding issues;
- Responsible for developing preliminary estimates and scope to support project/process development;
- Assist in the preparation and development of project specific procedures;
- Ensure adherence to industry codes and standards as well as department work instructions, specifications, and standards for assigned project;
- Develop effort hour estimates and scope documents to support project definition;
- Administer performance evaluations;
- Review & Approve work (Work Packs, Data sheets, MTO & Drawings).
- Design of drawings in accordance with the rules and regulations of the Republic of Kazakhstan;
- Design of drawings according to KPO standards;
- Factory visit and on-site inspection according to projects;
- Design of piping, piping layouts;
- Detailed design;
- Preparation consumption of materials;
- Preparation explanatory note to the working project regarding the piping design;
- Participation in the collection of initial data for the project documentation development;
- Working documentation development for the piping and pipelines design in accordance with standards, specifications, building codes and regulations, safety regulations, industrial sanitation, fire protection and other regulatory design documents.
March 2017 — October 2019
2 years 8 months
BI-Group, ТМ
Atyrau, www.bi-group.kz
Construction, Real Estate, Architecture... Show more
Mechanical and Piping Package Engineer
Project: Construction of «Cargo Transportation Route for facilities in northeastern part of the Caspian Sea. COF/CSF Buildings, Mechanical, Electrical and Instrumentation.
Further this object will be used for the project FGP - (Future Growth Project).
Position: Piping Project Engineer
Location: Atyrau, Kazakhstan
The project includes:
- The construction of the Port to receive large and small cargo ships.
- Port warehouse for unloading materials.
- The second warehouse for temporary storage
- Residential complexes for service personnel
Responsibilities:
- Preparation Scope of Work for Subcontractor.
- Review and comment engineering package (Sewer, firewater, portable, Hot water supply, gas and diesel systems, etc.) P&ID, General arrangement, sections, Isometric, profile, Material take off, Data sheet, Purchase requisition, in accordance RoK normative and GOST specification ensure constructability value of drawings and documents.
- Response to Technical Query from Vendors and Subcontractor.
- Review of drawings from vendors.
- Checking of purchased materials sub-contractor from the manufactures (according to the Material Requisition & Data Sheets).
- Checking/Inspection in welding shop during the manufacture of the pipe spools (as per drawings).
- Check/Inspection at site during erection/installation of pipe lines (as per drawings).
- Site construction support, paticipate in construction meetings to solve query.
- Procurement assistance discussion with supplier detail of equipment, piping and fittings. Provide additional information as per GOST spec.
- Work with ITP (Instruction to proceed) from TCO
- Preparation Redline Mark-up drawings.
- Participation pre-start/start-up works.
October 2012 — March 2017
4 years 6 months
Worley
Senior Piping Engineer
- Participation in large projects from Tengizchevroil(Chevron), or from Karachaganak(ENI).
- Consultation & taking joint decision concerning future large projects from Tengizchevroil(Chevron) or from Karachaganak(ENI) also working directly with contractor on site:
- Site visits to Plant prior to commencement and within the Project:
- Participation and assistance during turnaround & construction on the KTL/SGP/SGI - plants:
- Engineering of projects as per standards: ASTM, ANSI, ASME & HDPE:
- Duties include supervision, mentoring and training of Piping engineering staff:
- Substitute Lead Engineer in his absence:
- Participation in tender evaluations:
- Preparation Reports (site visit and project progress)
- Site Survey
- Working with P&ID from Process Group:
- Draw piping SKETCH drawings on site:
- Preparation all drawings Using AutoCAD & Microstation programs:
- Preparation Piping Job Packs:
- Preparation Piping General Arrangement and Isometric drawings:
- Preparation & Checking Material Requests for Pipe, fittings, valves, paintings, insulations & piping supports details:
- Preparation & Review of Data Sheets for piping parts:
- Review and endorsement of documents and drawings from manufacturer:
- Also includes the close work with Electrical, Instrumentation, Mechanical & Civil Departments. Also with a construction company while demolition & installation at the plant:
- Participate in PSSR on site and after completion the work on the Plant:
- Authorship Supervision:
- Preparation as-built drawings on site after completion of the construction work:
- Interview for admission to employment:
November 2010 — October 2012
2 years
TENGIZCHEVROIL
Atyrau, tengizchevroil.com
Piping & Mechanical Engineer
- Engineering of projects as per standards: ASTM, ANSI & ASME.
- Prepared Mechanical (Equipment) & Piping Job Packs, (ITC-during Turnaround for upgrade jobs on site)
- Working with P&ID from Process Group:
- Preparation all drawings Using AutoCad & Microstation programs:
- Preparation Piping General Arrangement and Isometric drawings:
- Preparation Material Requests for Pipe, fittings, valves & piping supports details:
- Preparation & Review of Data Sheets for piping parts:
- Includes the close work with Electrical, Instrumentation, Mechanical & Civil Departments. Also with a construction company while demolition & installation at the plant:
- Review the Long description of materials, Price & Delivery date from Manufacturer(Supplier).
- Weekly conference with manufactures:
- Participate in PSSR on site and after completion the work.
February 2007 — November 2010
3 years 10 months
TengizChevroil
Atyrau, tengizchevroil.com
Piping & Mechanical Designer
- Design Piping drawings according standard: B31.3, ANSI:
- Site Survey according the Engineering Work Request
- Working with P&ID’s from Process Group:
- Preparation all drawings Using AutoCad & Microstation programs:
- Draw piping SKETCH drawings on site
- Preparation Piping General Arrangement and Isometric drawings:
- Participate in PSSR on site and after completion the work.
- Preparation as-built drawings on site after completion the construction work:
June 2006 — February 2007
9 months
Government Construction Department
Atyrau
Construction Engineer
- Developer of the project documentations of metalwork and electric light system.
- Site survey and visual inspection on site
- Сompare equipment with drawings from clients
- Completed detailed engineering required to assemble Job Packs for the execution of work scope items
- Kept track of actual expenditures and provided forecast to cost control
- Prepared the necessary documentation to comply with regulatory requirements and Company procedures
- Procurement of materials by preparing engineered equipment specifications for bidding, detailed item specifications per Gost standards, analyzed vendor quotations, responded to vendor inquiries
- Reviewed and approved equipment, fabrication drawings and piping design drawings. Monitored fabrication status and resolved technical issues within the assigned time frame.
- Participate in PSSR on site and after completion the work.
- Preparation as-built drawings on site after completion the construction work:
- Authorship Supervision:
Skills
Skill proficiency levels
Driving experience
Own car
Driver's license category BAbout me
SUMMARY:
• Over 17 years of experience producing feed & detail design of process pipe lines in the oil & gas industry.
• Participation during the construction & destruction of the pipe lines, equipment & vessels on the plant.
Higher education
2006
Higher education
Mechanical Engineer
Languages
Citizenship, travel time to work
Citizenship: Kazakhstan
Permission to work: Kazakhstan
Desired travel time to work: Doesn't matter