Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was yesterday at 17:10

Male, 30 years, born on 10 October 1995

Kostanay, willing to relocate, prepared for business trips

Team lead / Project manager

Specializations:
  • Other

Employment type: full time, project work/one-time assignment

Work experience 11 years 7 months

January 2025currently
1 year 5 months

www.allurauto.kz

Automotive Business... Show more

ICT Project Manager
o Appointed to SaryarkaAvtoProm plant; o Cooperate with key stakeholders including high management of the plant and group of companies; o Worked with BOM, SPL etc. o Worked with quality team to indicate frequency of inspections; o Sort of machine parts defect for input control; о Researched vehicle lifecycle timings: developed a timeline based on stakeholder collaboration, identified responsible parties for each stage, and obtained management approval for stage durations across Brands and Models. о Researched bonded warehouse (BW) operations: based on data from 1C:ERP, 1C:WMS, and 1C:MES systems, developed a BW dashboard displaying processing times.
January 2023December 2024
2 years
Tengizchevroil

Atyrau, tengizchevroil.com/

Oil and Gas... Show more

System Owner
o Support Execution Team and System Owners to deliver RFSUs and RFOs to Operations; responsible for planning and prioritization of NPWs following RFSU Walkdown. o Field support for SO’s and Discipline teams to provide validation and acceptance of critical PLIs and Exceptions o Provides the feedback loop to Area Teams to continuously improve schedule certainty based one RFSU/RFO delivery performance o Expedite eDossiers as the focal point of negotiations with Operations o Single-point-of-contact with Close Out Group (COG) – this is the punch closure team, in essence o Responsible for CN Approval, PSSR Coordination, and preparation for RFO Readiness
September 2020December 2022
2 years 4 months
GATE Inshaat

Atyrau, www.gatekz.com/

Construction, Real Estate, Architecture... Show more

Completion Engineer
o Working with the SC team of Client (including meetings, discussions etc.) throw following disciplines (Civil, Structural, Piping, E&I); o Site visits for Pre-MC, MC meetings; o Facilitation of System Completion Manager during meetings and building forecasts for Construction execution based on Planning Experience; o Work together with all stakeholders to ensure all aspects and constraints of the Construction and QC; o Working with MC+ system, P&ID, ITH, ISO and etc. types of drawings; o Preparation FF project SC exceptions; o Analyze of Material distribution, Subsystem competition forecasts. Creation and modernization of Excel Model for automatization of these processes; o Reliability report for Construction/QC works; o QVD (Quality Verification Document) Liquidation Report preparation;
March 2019December 2022
3 years 10 months
GATE Inshaat

Atyrau, www.gatekz.com/

Construction, Real Estate, Architecture... Show more

Workface Planning Team Lead (Piping, E&I)
o Piping and E&I, Post-pipeline(RID) IWP (Installation work package) preparation for Construction + related QVD list for further actions of System Completion dep; o Research and preparation of boundaries for interfaces between Field Facilities and Pipeline projects; o Checking drawings to find out mismatches and preparing requests of additional materials or changing material types; o Scoping of Civil, Structural, Piping and Pipeline CWPs into IWPs; o Site visits of my 3WLA (3-week look ahead plan) responsibilities and discussion problems of works execution of IWPs, which I had prepared; o 3WLA Reports Preparation for weekly meetings with Company Representative persons; Constraints identification, tracking and communication. Constraints review sessions enhanced flow of information and issues between the field and management, which allowed for timelier reaction;
October 2018February 2019
5 months
Kentech group

Atyrau, kentplc.com/

E&I QA/QC Engineer
o Input control of all electrical and instrument equipment (Substation modules, cables, F&G instruments etc.); o Testing cables, preparing acceptance documentation, Preparing mark-up drawing (As-built); o Cooperating with Construction team of Kentech, FGP Construction team, Vendor Rep. and FGP QA/QC team and assisting in solving QC-related issues; o Organizing inspections for coating works and installation of Modules. o Coordinating of all directions of QC works for building good cooperation and in order to avoid of interfaces.
March 2016October 2018
2 years 8 months
‘Inzhtechservice’ LLP

Atyrau

E&I Commissioning technician
o Resolving problems using a combination of standard procedures, modification of standard procedures or methods developed in previous assignments; o Performance loop checks and function tests from/to DCS system or PC based control system to the Control Room/RU(F&G, Instruments); o P&ID, WITH, DCB diagram reading.
November 2014March 2016
1 year 5 months
‘Energomontazh’ LLP

Rudny

Electrician
Installation of cables and mounting of junction boxes.

Skills

Skill proficiency levels
Advanced level
Business English
Analytical skills
Leadership Skills
Organization Skills
Project management
Team management
MS Excel
Time management
Ориентация на результат
Driving Licence B
Presentation skills
Английский язык
Quality Management
Medium level
Electrical
Level not specified
Jira
Python
FastAPI
Django Framework
Apache Kafka
SQLAlchemy
MS Project
PMBOK

Driving experience

Own car

Driver's license category B

About me

Goal-oriented and result-driven engineer with a strong background in quality control, quality assurance, planning and project management fields seeking opportunity to pursue his aspirations in tailoring engineering skills. A hard - working, meticulous and persevered engineer. Able to work in team and individually. Able to work under strict deadlines. Is highly adaptable as result of having experiences of taking part in multicultural project FGP.

Portfolio

Higher education (master)

2019
Higher education (master)
Ural Federal University of the First President B.N. Yeltsin (Russia, Ekaterinburg)
Institute of new materials and technologies., Organization and control of knowledge-intensive and innovative technologies.
2017
Higher education (master)
Ural Federal University of the First President B.N. Yeltsin (Russia, Ekaterinburg)
Metallurgy, World market of raw materials and metal
2017
Higher education (master)
"Spetstekhtsentr" LLP
Electrician and automatization, Electrician
2013
Higher education (master)
Gymnasium No. 5
Physics and Mathematics, Physics and Mathematics Class

Languages

Russian — Native

English — C1 — Advanced

Kazakh — A2 — Elementary

Professional development, courses

2022
Coursera
Google, Project Management course
2021
Project management
Laba.com
2020
Primavera P6
Udemy.com
2019
Excel for Managment
Coursera.com
2018
TCO Training Centre
TCO, Electrical safe work Practies
2018
TCO Training Centre
TCO, Swagelok Pipe Fittings
2017
TCO Training Centre
TCO, Confined Space Entry
2017
TCO Training Centre
TCO, Working at Heights

Citizenship, travel time to work

Citizenship: Kazakhstan, Russia

Permission to work: Kazakhstan, Russia

Desired travel time to work: Doesn't matter