Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was today at 18:41

Male, 45 years, born on 20 June 1980

Taraz, willing to relocate, prepared for business trips

Engineer or Supervisor Electrical and Instrumental

1 000 000  in hand

Specializations:
  • Other

Employment type: full time, part time, project work/one-time assignment

Work experience 23 years 3 months

April 2024November 2024
8 months
TCO (Bolashak-Atyrau)

Atyrau

Instrumentation Maintenance Engineer
Power supply checks and visual inspection of equipment for damage, corrosion and other defects; marking and identification on checks on devices. Elimination of revealed defects and conducting a follow-up visual inspection as required. Completing check sheets, conducting office reviews of the check sheets in Tengizchevroil Future Growth Project (FGP) – Wellhead Pressure Management Project (WPMP) Completion Management System (CMS). Developing I/E failure scenario Work Packs.
October 2022April 2024
1 year 7 months
TCO (Bolashak-Atyrau)

Atyrau

I/E Maintenance Planner
Processed I/E maintenance work orders. Planned steps for requested task in the work orders for the disciplines, estimated manhours and manpower. As an I/E Maintenance Specialist of our department I took part in online meetings with maintenance and operations personnel on a daily and weekly basis and liaised with other departments’ personnel to ensure a productive work schedule using ORACLE JD Edwards. Selected materials in TCO JDE E1 Web Procurement Reporting Support software; in case of unavailability of any material it was purchased by Material Coordinators via a direct order. After finding alternatives of the missing material in the project warehouses for direct purchase, I verified the acceptability of the proposed material for direct purchase from the manufacturer.
November 2019October 2022
3 years

Atyrau

Preservation Lead Instrumentation Engineer
Supervised SK contractor’s instrumentation preservation works. Supervised the quality and terms of preservation of instrumentation equipment, as well as the provision of appropriate storage conditions and at the entrusted area. Supervised and guided the daily activities of instrumentation equipment preservation. Ensured the implementation of an effective storage and preservation program for instrumentation equipment to prevent damage, rework and associated costs, and to avoid problems with guaranteed liabilities and costs associated with improper storage practices. Took actions for primary and continuous preservation in accordance with the manufacturer's requirements, providing the team with all the resources and materials necessary to perform the work. In case of absence of the manufacturer's requirement when receiving instrumentation equipment, carried out primary and continuous preservation according to the "Instrumentation Equipment Preservation Instructions". Conducted scheduled audits on the quality of instrumentation equipment storage at the Third Generation Plant (3GP). Participated in the preparation of the scopes of work and supervised the execution process.
January 2019November 2019
11 months
Infra Del Projects Kazakhstan ( IDP )

Atyrau

Preservation Supervisor
Supervised equipment and materials preservation works at all TCO warehouses, IBMOA area throughout the entire phase of being in the warehouse. Carried out permanent preservation of inventory items. Supervised and guided the daily activities of materials and equipment preservation. Ensured the implementation of an effective storage and preservation program for instrumentation equipment to prevent damage, rework and associated costs, and to avoid problems with guaranteed liabilities and costs associated with improper storage practices. Guided by the manufacturers' requirements for preservation to clearly define and fulfill the requirements.
June 2018December 2018
7 months
Fircroft / GATE

Atyrau

Equipment Preservation and Storage Superintendent
Planned, evaluated, organized and supervised the quality and terms of the materials preservation, as well as ensured appropriate storage conditions at the “Off-Plot Facilities (Gathering)". Supervised the process of materials and equipment preservation before the equipment was handed over to the commissioning team. Carried out permanent preservation of inventory items. Supervised and guided the daily activities of materials and equipment preservation. Took actions for primary and continuous preservation in accordance with the manufacturer's requirements, providing the team with all the resources and materials necessary to perform the work. In case of absence of the manufacturer's requirement when receiving instrumentation equipment, carried out primary and continuous preservation according to the "Equipment Preservation Instructions". Conducted scheduled audits on the quality of equipment storage at the entrusted area. Participated in the preparation of the scopes of work process and supervised the execution process.
April 2017June 2018
1 year 3 months
Holding «Bi-group». LLP “Kazpako”. Field “Prorva”.

Atyrau

Electrical supervisor
Supervision of contractors’ electrical works, according to project documentation and project drawings. Reviewed the design and work documentation. Participated in the third parties walkdowns, compiled the final punch lists, signed acts of works completed. Checked work permits. Executed the as-built documentation according to the procedures. Compliance and fulfillment of the company’s HSE requirements. Staff development through the provision of information. Took actions in case of violations of rules or procedures by other persons. Compliance with working hours, participation in meetings required in the project.
April 2017May 2017
2 months
Granite Services International Inc. (General Electric) .KPO (Karachaganak Petroleum Operating)

Aksay (Kazakhstan)

Instrumentation Specialist
Turnaround (shutdown). Actively participated in KPO facility turnaround at GP-2 area. Conducted I&C (pressure transmitters, temperature transmitters, flow meters, etc.) functional testing. Instrument replacement and troubleshooting.
May 2016March 2017
11 months
''Sicim S.P.A-Kazakhstan''

Atyrau

E&I Foreman
Supervised a team of 10-15 electricians and technical staff. Supervised installation of electrical equipment, pulling and laying of power and instrument cables into the cable trenches and trays. Installation of fire and gas detection systems, control boards, etc. in Tengiz RV (Rotational Village), Water Treatment Facilities. In October 2016, I was transferred to Prorva Project (Port for the delivery of cargos by sea for FGP project).
July 2015March 2016
9 months
“Zapchast” JSC Plant

Taraz

Plant Chief Power Engineer
Providing the enterprise with energy resources (gas, water, electricity). Scheduled repairs of power equipment. Conclusion of contracts on the wholesale electricity market (KEGOC, T.I. Batyrov ZhGRES JSC). Submission of daily requests for electricity in the BRE system. Carrying out scheduled maintenance of power energy equipment (GPP 110/6, 6kV switchgear, Furnace transformers up to 8000kVA, TM 1000/6). Delivery of stat reports. Ordering of materials. Write-off of commodity and material values. Start-up and management of a new compressor section. Organisation of boiler room operation.
April 2012June 2015
3 years 3 months
LLP Temir Zhol Kurylys Atyrau (TKA)

Atyrau

HVAC I&C technician
Maintenance of instrumentation on HVAC (Heating, ventilation and air conditioning) units. Worked as an HVAC operator at Karabatan refinery. Start-up of HVAC system once it was handed over to operation.
April 2015May 2015
2 months
Granite Services International Inc. (General Electric). KPO (Karachaganak Petroleum Operating)

Aksay (Kazakhstan)

Instrumentation Specialist
Turnaround (shutdown). Actively participated in KPO facility turnaround at GP-2 area. Conducted I&C (pressure, temperature transmitters, flow meters, etc.) functional testing. Instrument replacement and troubleshooting.
May 2010October 2011
1 year 6 months
Sapsan

Atyrau

HVAC I&C technician
HVAC (Heating, Ventilation and Air Conditioning) system instrumentation maintenance. I have experience working with temperature controllers (SIEMENS RLU-232.236). Measurements of ventilation unit efficiency, pressure measurement of supply and exhaust flows. I performed ventilation unit efficiency measurement using TESTO instrument. I developed passports for ventilation units according to industrial sanitation norms.
January 2008April 2010
2 years 4 months
"Tesla-Tan" Company

Atyrau

Electrician Technician
Agip KCO-North Caspian Operating Company’s contractor. Kashagan-Karabatan Ground Facilities Project. Installation of cable routes, unrolling of power cables, connection of power equipment. Laying of cable routes, unwinding of power cables, connection of power equipment. Installation of cable trays, installation and connection of power cabinets. Connection of lighting boxes and sockets, installation of lighting devices. Reading of schemes.
May 2006October 2007
1 year 6 months
“TEST” (Total Engineering System Technology Tim Ink) Company.

Atyrau

Instrumentation Technician (Grade 5)
The project of the second generation SGP (Second Generation Project). I was involved in commissioning of fire and gas detection system. Experienced in HART COMMUNICATOR. Calibrated gas detection sensors such as NGT (Dragger, Politron), NGC (Methane Detection Draggers), etc.
March 2005April 2006
1 year 2 months
LLP “Dalaro LTD Overseas”

Atyrau

Electrical engineer
Contractor company "Tengizchevroil". Pre-commissioning works on the project SGP (Second Generation Plant) and SGI (Second Gas Injection). Adjustment and verification of protection settings on multifunctional digital protection relays of ‘ALSTOM’, ‘Schneider Electric’, ‘ABB’, ‘Merlin Gerin’, ‘Multiline’, ‘Sepam’, ‘Micom’ brands. High-voltage testing and measurement of 10/35 kV substation equipment. Testing of power electrical equipment, including power transformers, two-winding and three-winding transformers, oil circuit breakers, arc suppression coils, voltage transformers, current transformers, switchgear cables of various types and modifications, measurement of parameters of low-voltage circuits, insulation resistance (IR) testing, measurement of ground loop resistance. Work with technical documentation, schemes and drawings, filling in test reports.
January 2001February 2005
4 years 2 months
LLP “Kazphosphate” , “Taraz Mineral Fertilizers Plant”
Electrician on repair of relay protection and automation (5 level).
After graduating from college, I was employed to the position of "High-Voltage Equipment Repair Electrician" in the above-mentioned enterprise, literally six months later I was transferred to the ETL (Electrical Technical Laboratory) to the position of "Relay Protection Repair Electrician». I was engaged in the identification and troubleshooting of relay protection, adjusting relay protection setpoints, measurement circuits tests, taking VAC (volt-ampere characteristics) to check the operability of current transformers. Checks and functional measurements of the operating parameters of high-voltage power transformers. High voltage testing of main and auxiliary PPE.

Skills

Skill proficiency levels
Advanced level
Исполнительность
Проектная документация
КИПиА
Монтаж оборудования
Умение работать в коллективе
Пуско-наладочные работы
Электрические системы и слаботочные системы
Чтение проектной документации
Промышленная безопасность
5 группа по электробезопасности
Medium level
Английский язык
Ввод в эксплуатацию
Эксплуатация
Обучение и развитие

Driving experience

Own car

Driver's license category B, C

About me

Extensive experience in electrical and instrumentation

Higher education

2005
Higher education
KAZIITU (Kazakhstan Institute of Informatics and Technology Management)
Multichannel telecommunication systems, Engineer - Electrocommunications
2005
Higher education
Казахстанский институт информатики и технологии управления
Многоканальные телекоммуникационные системы, Инженер электросвязи

Languages

Kazakh — Native

English — B1 — Intermediate

Russian — C2 — Proficiency

Citizenship, travel time to work

Citizenship: Kazakhstan

Permission to work: Kazakhstan

Desired travel time to work: Doesn't matter