Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas more than two weeks ago
Male, 33 years, born on 11 November 1992
Taraz, willing to relocate (Aksay (Kazakhstan), Aktau, Almaty, Atyrau, Shymkent), prepared for business trips
Mechanical / Piping Engineer
Specializations:
- Other
Employment type: full time, project work/one-time assignment
Work experience 6 years 7 months
February 2024 — June 2024
5 months
Neftestroiservice
Mechanical engineer
- Gained familiarity with the project scope of work, specifications, schedule, and all inter-discipline requirements, including identifying concerns as early as practicable - Prepared marked up drawings for mechanical and electrical isolation on construction site
- Visited construction site regularly to identify and address engineering issues
- Prepared technical queries when requested by construction team
- Prepared redlines and As-built for piping isometric drawings
- Provided engineering support as required
- Prioritized and organized own work to meet deadlines
June 2021 — March 2023
1 year 10 months
VELESSTROY
Atyrau
Construction, Real Estate, Architecture... Show more
Piping/Mechanical Construction Engineer
Project: 3GI ME&I (Third Generation Sour Gas Injection Unit)
Client: «TengizChevroil»
Construction Department:
• Managed and oversaw valve testing, calibration, and installation, ensuring compliance with agreed MC timelines. Identified and resolved engineering challenges during the installation process, ensuring timely completion of project
• Coordinated technical certification for Vessels, Tanks, and Filters, overseeing final box-up inspections to maintain adherence to schedules
• Collaborated closely with construction supervisors to effectively plan and monitor daily site activities, ensuring efficient crew management and task execution
• Organized and conducted quality inspections with the construction team, gathering and submitting necessary documents and reports for timely NFI (Notification for Inspection) submissions.
• Successfully addressed and closed Punch list items following sub-system and SID walkdowns, maintaining project quality standards
• Provided comprehensive technical support to the Construction department and MC team, ensuring the timely delivery of sub-systems and adherence to project specifications
October 2019 — May 2021
1 year 8 months
VELESSTROY
Atyrau
Construction, Real Estate, Architecture... Show more
Project Production Control Engineer
Project: 3GI ME&I (Third Generation Sour Gas Injection Unit)
Client: «TengizChevroil»
Project Production Control Department:
• Conducted daily site visits to assess work progress and gather relevant information
• Developed and implemented daily Production Plans, ensuring optimal resource allocation
• Monitored and updated the current Production Plan, identifying and addressing causes for any deviations
• Facilitated Daily and Weekly Production Planning sessions to streamline project execution
• Developed and disseminated a detailed 4 Week Look Ahead Production Schedule, outlining tasks at a granular level to enhance project management
• Established strong collaborative ties with Workface Planning, Project Controls, PLMM, Construction, and Engineering departments, along with Client and Sub-Contractors, to ensure cohesive project management
May 2018 — October 2019
1 year 6 months
ERSAI Caspian Contractor
Aktau
Construction, Real Estate, Architecture... Show more
Mechanical / Piping Field Engineer
Project: FGP/WPMP Pre-Assembled Pipe Rack Modules Fabrication & Erection
Client: «TengizChevroil»
Fabrication Department:
• Conducted meticulous Line checks against Piping Isometric drawings, enabling the release of lines for pre-hydro walkdowns
• Managed Reinstatement activities and closure of pre-hydro walkdown Punch lists after hydro testing, handing over test packs to the Mechanical completion team
• Proactively coordinated with Sub-contractors for Closure Weld cutting, beveling activities, remachining damaged flange faces, and borescope inspections, ensuring timely rectification of any defects
• Promptly reviewed and closed Punch lists raised by the Client during SID Walkdowns, maintaining adherence to project quality standards
• Acted as an interface between Piping, Structural, E&I Construction groups on site, and the Engineering, MC, and QC departments
February 2017 — May 2018
1 year 4 months
Sicim S.p.A Kazakhstan
Atyrau
Construction, Real Estate, Architecture... Show more
Junior Piping/Mechanical Engineer
Project: KTL Seasonal Gap Reduction (SGR), Second Generation Plant Enhancement (SGE)
Client: «TengizChevroil»
Technical Department:
• Conducted regular plant visits to identify and address engineering issues, preparing Site Engineering Queries as needed
• Performed thorough site checking of piping isometrics and structural drawings to ensure the accuracy of As-Built documentation
• Expertly prepared and managed Material Requisition requests to ensure timely procurement of necessary materials
• Provided technical support to the Construction department
Skills
Skill proficiency levels
Driving experience
Driver's license category B
Higher education (bachelor)
2016
Higher education (bachelor)
Kazakh National Research Technical University named after K. Satbayev
Petroleum Engineering, Design, construction and operation of oil & gas pipelines and storages
2012
Higher education (bachelor)
Kazakh-Turkish College of economics
Economics, Marketing
Languages
Citizenship, travel time to work
Citizenship: Kazakhstan
Permission to work: Kazakhstan
Desired travel time to work: Doesn't matter