Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяБыла более двух недель назад
Женщина, 62 года, родилась 27 ноября 1963
США, хочу переехать (Алматы, Великобритания, Грузия, Италия, Казахстан, Москва, Санкт-Петербург), готова к командировкам
Senior technical architect, Project Manager, Project architect
Специализации:
- Руководитель проектов
Тип занятости: полная занятость
Опыт работы 19 лет 6 месяцев
Март 2013 — Июль 2015
2 года 5 месяцев
Four Seasons Hotel and Resort
Москва
Строительство, недвижимость, эксплуатация, проектирование... Показать еще
FF&E installation project manager
Follow up and expedite orders, supervise and direct third party Logistics and Installation Company and ensure that the Four Seasons Standards are maintained throughout the process.
Act as a liaison between the Logistics, Warehouse and Installation Company, Home Office, Hotel Operations and Ownership.
-Update delivery status report
- Risk report
- Develop detailed installation scheduled
- Coordinate all Third party installers
- Report deficiencies, damages or concerns to Four Seasons for immediate action. Facilitation and coordination with vendors.
- Review and Critique the quality of workmanship of Installation Labor including supervisors.
- Complete an inspection of deficiencies on Personal Property and arrange the rectification of all deficiencies
Январь 2011 — Январь 2013
2 года 1 месяц
ZAO Tristar
Санкт-Петербург
Строительство, недвижимость, эксплуатация, проектирование... Показать еще
Project architect
construction administration duties, including document reviews; technical research, review of on-site conditions, coordination with heritage architects, engineers, construction administrators, sub-contractors, and other design consultants such as lighting designers, spa consultants and landscape designers, preparation of conformed documentation to on-site conditions. Requires extensive knowledge of all areas of interior architecture; construction document production, building systems and construction techniques.
Июль 2009 — Декабрь 2010
1 год 6 месяцев
Cheryl Rowly Design, Beverly Hills, California
Строительство, недвижимость, эксплуатация, проектирование... Показать еще
Senior Project Manager
• Four Season Hotel, St. Petersburg, Russia: As acting site project manager, converted a 1820 Neo-Classic style Palace with the heritage elements being designed in collaboration with a local Saint Petersburg Heritage Architect on behalf of Cheryl Rowley Design,
construction administration duties, including document reviews; technical research, review of on-site conditions, coordination with project architects, heritage architects, engineers, construction administrators, sub-contractors, and other design consultants such as lighting designers, spa consultants and landscape designers, communication with home office and liaison during site visits by Beverly Hills team and preparation of conformed documentation to on-site conditions.
Апрель 1999 — Январь 2009
9 лет 10 месяцев
NBBJ - architecture, design
Строительство, недвижимость, эксплуатация, проектирование... Показать еще
architect, Associate
Lectures/Presentations:
“The Third Conference Successful Triad: Client – Architect – Manufacturer; New Construction Technologies, Equipment and Materials”, ARX magazine, March 2006
Fire safety concept with application to the “Moscow City Business Center” – Technical conference, June, 2005
XI International Exhibition of Architecture and Design – ARX Moscow, June, 2006 – Presentation/master class seminar
“Capitalgrad by the “Capital Group” Interview/presentation for publication in Project Russia magazine , 2006
Major projects:
Moscow-City, Moscow, Russia 2005-2007
Project Architect
Capital City is a multifunctional complex, part of the Moscow International Business Center (MIBC) development, one of the largest investment and construction projects in Europe. With an area of about 3,000,000 SM. The City of Capitals consists of two towers - the 73-floor “Moscow Tower” and the 62-floor “St. Petersburg Tower”, reaching heights of 294 and 254 m, respectively. Floors 17 and 18 of both towers are offices. The entire complex sits on a main lobby consisting of 6 underground floors and 4 aboveground floors of public space.
Responsibilities of Project Representative:
CONTRACTUAL REQUIREMENT:
(1) Speak Russian,
(2) Be able to work on documents in Russian,
(3) Have a good command of design and construction norms and rules in Moscow and Russia.
The purpose of having representative in Moscow is
(1) Coordination of the proper delivery of the design services,
(2) Reporting back to Architectural firm in the United States, and
(3) Improvement of coordination between Architects in the US and client.
ROLES AND RESPONSIBILITIES
-Listen and report. I understand any concerns or problems the client may have and did my best to relay that information back to the team.
-Explain the design. Whenever there was a question or a misunderstanding in regard to the design or the team’s design intent, I did my best to explain it and represent it in a positive manner.
-Research and get answers. If the design team had a question, they would ask
me to research it and get answers. These may be questions for client team or others, including contractors, government agencies, or suppliers.
-Expedite approvals. Client was responsible for obtaining all government approvals. Architectural firm in US was responsible for providing information, documents and support to client to enable them to obtain the approvals. Approvals include coordination of our design with the Moscow City development authorities – i.e. the interface between our building and the surrounding structures.
-Develop good personal working relationships and open paths of communication, build trust between client and the design team.
SPECIFIC ISSUES
Different set of tasks or challenges based on the state of the design of the project at that time
Fire and Life Safety plan, “technical condition” coordination between local code requirements, IBC and project design.
Russian Building Code Research
PROEKT coordination, scheduling
MEP coordination – Mosproekt 4, Mosenergo,
Interior package – Lafesafety, local market research for finish materials including vendor’s contact information, technical data collection and Russian certification availability.
Door schedule: door specification (see attached sample) – working with local door/ hardware installer.
Prior Experience
HEALTH CARE FACILITIES
Helford Clinical Research Hospital, City of Hope National Medical
Center, Hospital Replacement
Duarte, California - 1999-2005
Senior Technical Architect
144-bed replacement hospital on a major medical research campus including pathology-, surgery-, bone marrow transplant, and radiology facilities. Two phases: Phase 1, 203,000 SF; Phase 1B, 127,000 SF.
RESPONCIBILIY
Coordinate with and represent the firm to obtain approvals from clients and agencies having jurisdiction over projects, including researching code and regulatory compliance for projects under the California Department of Health Services (DHS), Office of Statewide Health Planning and Development (OSHPD), California Building Code, International Building Code, Americans with Disabilities Act (ADA), NIH, and CDC Guidelines; coordinate with mechanical, electrical, plumbing, fire protection (MEP/FP), equipment, EMI, vibration, effluent/wind, sustainability, and structural consultants to incorporate engineering systems in the preparation of construction documents; apply architectural principles to review all related shop drawings and submittals, samples, and mock-ups; evaluate general contractor bids and project budgets; coordinate with contractors to respond to requests for information (RFI’s), review and respond to contractor change orders, and perform necessary modifications of drawings and specifications as construction projects progress and changes in dimensions, materials, and other aspects of design arise; conduct site visits to observe construction progress and prepare field observation reports, final inspections, punch lists, certificates of substantial completion, and post occupancy evaluation.
Август 1995 — Апрель 1999
3 года 9 месяцев
Mandeville Berge Box Architects/ Engineers/Planners, Seattle Washington
Строительство, недвижимость, эксплуатация, проектирование... Показать еще
architect
Project architect: programming, plan layouts, techincal support, coordination with mechanical and elecatrial, code compliance and agency approval, permitting. Leading 2-3 people team.
MC Chord Air Force Base
Avionics Building
Tacoma, Washington
Architect
Addition and remodel of training facility
Обо мне
IT skills:
- Microstation
- AutoCAD ADT
- MS Office Suite (Outlook, Word, Power point)
- MS Excel
- MS Project
Высшее образование (Бакалавр)
1987
Высшее образование (Бакалавр)
St. Petersburg State University of Architecture and Civil Engineering, St. Petersburg, Russia
Art/Architecture/Urban Studies, Bachelor of Architecture
Знание языков
Гражданство, время в пути до работы
Гражданство: США
Разрешение на работу: США
Желательное время в пути до работы: Не имеет значения


