Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was more than a week ago

Male, 37 years, born on 10 August 1988

Atyrau, willing to relocate, prepared for business trips

Electrical Supervisor, Construction Engineer,QC inspector

1 200 000  in hand

Specializations:
  • Other

Employment type: full time

Work experience 17 years 8 months

March 2025August 2025
6 months
Flux
Field Electrical Engineer
· 10 kV cable replacement project involves replacing aging or faulty 10 kV underground power cables with new ones, often due to age, damage, or the need to upgrade to a higher voltage. This process ensures the reliability and safety of the power grid, especially in urban areas where 10 kV cables are commonly used for power distribution. · Responsible for overseeing the electrical aspects of the project, ensuring the work is completed safely, efficiently, and according to specifications. This includes tasks such as reviewing designs, managing installations, conducting tests, and troubleshooting issues.
November 2023November 2024
1 year 1 month
Tengizchevroil / Bolashak Atyrau

www.bolashak.com

Electrical & Instrumentation Construction Supervisor
• Responsible for supervision of electrical & instrument (E&I) discipline and multinational workforce and staff personnel within designated area to ensure implementation of construction activities performed in a safe manner, within schedule, job packs, comply with specification and acceptance criteria including supportive documentation. • Supervise and control business partner’s workforce, participating Daily site inspection, coordination, preparing daily/weekly reports, participating construction meetings, mechanical completion walkdowns, closing punch list items. • Daily duties includes: managing PTW as an Area controller, attending daily TBT, interacting with other discipline supervisors to remove barriers and constraints, jointly working with BP to close priority punch items, QVDs, DCNs, RFIs. Planning the job and control BP’s field E&I discipline team, provide practical solutions and ensure their implementation, influence BP to work in a right sequence and right method statements. • Influence on business partners in case of any type of non-conformity identified during construction execution, actively participating in a rectification action to make sure contractor met quality aspect. • Coordinate effective SIMOPS with other contractors and TCO at site, resolving any clashes/conflicts. • Liaise with the contractor, with other project teams, engineering/pre-commissioning team, about any issues and concerns and follow up on their rectification and improvement accordingly. • Provide kind mentoring and lean coaching to both TCO/BP employees when it is necessary.
January 2022November 2023
1 year 11 months
Tengizchevroil / Bolashak
Deputy Construction Manager
• Responsible for overseeing and managing the construction, installation and handover of power generation facility consisting of 5 GE Frame 9 Gas Turbine Generators (127 MW Capacity each), 110 kV Main Substations with Standby Diesel Generator Infrastructure. A total budget of 2,400,000 MHRs • Playing a key role in managing the construction as per L3 execution plan to attain schedule milestones and cost through the efficient use of all construction resources including manpower, materials, tools, and equipment. • Managing the cross-functional team both expat & nationals responsible to the site construction execution activities to meet the hand over sequence required on a system by system and area by area basis, to deliver clean Mechanical Completion of all facilities safely and progressively within the Power Generation, Pressure Boost and Reception Areas to support the PBF First Oil to enable Commissioning and Start-Up activities in the right sequence. • Coordinating and influencing Business Partner to ensure the scope of work is aligned with the Contract & Cost requirements and correctly interpret enabling safe achievement of construction requirements, delivery of high-quality work in accordance with TCO Specifications and RoK regulations. • Active participation in a regular meeting and reporting to a Leadership team, approving required project documentation and payment application, involving to a strategic planning, risk assessment and management of changes, decision making.
July 2019January 2022
2 years 7 months
Tengizchevroil / Bolashak Atyrau

Kazakhstan, www.bolashak.com

Business Services... Show more

Electrical & Instrumentation Construction Supervisor
• Represent owners’ Construction team (TCO) with ME&I Contractor executing construction and pre-commissioning works on FGP power generation. Scope includes 5x GE Frame 9 gas turbine generators (127 MW each), 5x Caterpillar Diesel Generators (5 KVA each), 110KV Main and 10KV Standby substations, Power Control Room, Power Generation Maintenance Building. Total budget 2,400,000 MHRs, total headcount on the area more than 2,000 directs. • Supervise and coordinate the activities of construction contractors within assigned areas. Coordinate with Operations team on Lock-out Tag-out (LOTO), de-energization and re-energization process. Provide daily supervisory surveillance checks and records, ensuring that contractors’ management and supervision are providing safe working conditions and permit procedures. Routinely study, check, review and validate the discipline scope of work against the appropriate Contract Requisition to ensure the Contractors correctly interpret and comply with the latest revision AFC drawings, quantities, and specifications. Monitors 4WLH Scheduled activities and ensures equipment and manpower requirements are met to support the established completion dates. Strong safety awareness and adherence to safe working practices during site execution phase. Identify the hand over sequence on a system by system, area by area basis, all scheduled to produce logically planned work completions for commissioning and start-up requirements. Perform other tasks upon request from the Construction Superintendent.
September 2017June 2019
1 year 10 months
Doosan
Chief Electrical Engineer
Atyrau / Karabatan Doosan Heavy Industries & Construction - EPCM Contractor (South Korean company) • The Karabatan Power Plant Project comprises of 4 Gas Turbine Generators (SIEMENS SGT-800), 4 Heat Recovery Steam Generators (GE) and 2 Steam Turbine Generators. The plant will have across capacity of 310MW. A fully Combined-Cycle Power Plant with an installed capacity of 310MW at 110kV and generating and distributing High Pressure steam for Special Economic Zone “National Industrial Petrochemical Technopark”. • Responsible for electrical and instrumentation installation works: 110kV Substation (LS Korea), Power transformers (115/11kV Step-Up Transformers; 110/10.5kV Step-Down Transformers, 10/0.72kV LV TR, 10/0.42kV LV TR, Auxiliary distribution system (10KV MV SWITCHGEAR ; 690V LV Switchgear; 400V LV switchgear; 400V MCC; 230V Distribution Board), 110V DC & 230V AC UPS system; BATTERY (CEG Italy), protection relay system, pulling and termination of power, instrument, telecom and electrical control cables, installation of cable raceways, electrical duct banks, cable trays, hot dip galvanized steel conduits, PVC conduits, flexible conduits. Installation of lighting and small power system, grounding and lightning protection system, motors and telecommunication system. • Monitor Day to Day construction activities & surveillance; including schedule; quality report. Conduct Weekly, Monthly Quality meeting & discuss, resolve quality issues with Client & Sub-contractors, review & approve subcontractors ITP, material approval requests etc. • Responsible by physical inspection of all electrical / instrument installations, ensuring that all Contractor personnel and workmanship is completed in accordance with approved designs, international codes, standards and project procedures.
July 2017August 2017
2 months
Tengizchevroil & Bolashak Atyrau
Electrical & Instrumentation QA/QC Ex Inspector
Atyrau / Tengiz KTL Plant Turnaround 2017 • Review plans and specification and other project documents. Responsible for the implementation of the Quality Control related to electrical and instrumentation works in accordance with project specifications and engineering standards. • Conduct inspection with contractor’s inspectors and supervisors for both electrical, instrumentation and telecom installation and erection activities. Witnessed of cable testing to including continuity, megger test and instrument installation. Generate internal surveillance punch list and inspection reports. Coordinate with contractors on daily progress checklist and punch list clearing. • Coordinate and execute walk down and punch list activities for both electrical, instrumentation and telecommunication.
April 2015June 2017
2 years 3 months
Isker Group
Electrical & Instrumentation QA/QC Ex Inspector
Atyrau / Karabatan • The EWRP Project consists of 15 buildings designed for the production and the storage of Sulphur and which will export oil and Sulphur. • Responsible for inspection of cable installation including cable trays, cable glands, termination, Hipot, insulation resistance, continuity testing etc. Inspection of power transformer, switchboard, UPS, lighting, earthing and heat tracing system. Daily monitoring/inspections of electrical and instrumentation, fire and gas, telecom system during construction. • Performing inspection for all E&I equipment’s installations, are following the technical requirement according to the project specification. Controlling contractor procedures, inspection and test plans and other technical and quality documents, to ensure effective controls. Inspection of Fiber optic cable installation, daily and weekly reports (nonconformities reports). Weekly monitoring equipment preservation, Pre-inspection for project completion team, pre-walk down, Red Line Mark Up on drawings for E&I and Telecom Disciplines, closing check list and punch list. Ensure all the Electrical, Instrumentation, Telecommunications, Fire and Gas & HVAC Equipment’s installed comply with the ATEX 95/137 DIRECTIVES, IEC 60079-14 & IEC.60079-17 and Client Standards for compliance with all applicable Codes, Specification, Quality Assurance and Quality Control Standards. • Performing the Grade of Inspection Visual, Closed and Detailed and complete the Ex-Inspection Test Reports (Ex QVD) with no outstanding punch list items for prior to Energization for all the potentially explosive equipment’s.
September 2013April 2015
1 year 8 months
Alfa Crystal LLP
Electrical & Instrumentation Construction Supervisor
Atyrau • Supervision of a team of contractor electrical craft personnel to include line managers, superintendents and foremen. Responsible for ensuring all safety standards and compliance codes are adhered to and validated. Work requiring the consistent exercise of discretion and independent judgment with respect to engineering directives, project specifications and applicable codes and industry standards. Schedule and train personnel to ensure the maintenance of specialized installation and testing equipment. Working with and maintaining project construction schedules by directing contractor work fronts to sequence the tasks so that they align with the schedule and logical installation activities. Plan and direct the work activities for assigned the electrical construction craft in alignment with available engineering deliverables, tools, construction equipment, and materials.
May 2012August 2013
1 year 4 months
Kentech Group
Electrical & Instrumentation QA/QC Inspector
Atyrau / Tengiz The Sulfur Expansion Project (SEP) is increase TCO’s sulfur-granulation capacity • The main elements consist of the following: additional sulfur degassing facilities, additional sulfur forming (granulation) facilities, incremental pumping and interconnecting pipework supporting the additional facilities. • Responsible for preparation of technical documentation, Inspection of cable installation including cable trays, cable glands, termination, continuity testing etc. Inspection of power transformer, switchboard, UPS, lighting, earthing and heat tracing system. Daily monitoring/inspections of electrical and instrumentation, fire and gas, telecom system during construction. Performing inspection for all E&I equipment’s installations, are following the technical requirement according to the project specification, calibration works inspection, alteration of project drawings (as built preparation), work with CMS system of TCO company, work with ESD, F&G, FSC systems, drawing up of an Acts according to SNIP, GOST and others RoK normative-legal documents, forming and submitting of Completed Work Packs to the Client, carry on business correspondence in Russian and English languages.
January 2010May 2012
2 years 5 months
Kentech Group
Electrical & Instrumentation QA/QC Inspector
Atyrau / Kashagan Offshore “D”Island KASHAGAN Development Experimental Program • Performed surveillance activities during installation of all Electrical, Instrument, Fire and Gas, HVAC and Telecommunications Equipment’s and recorded punch list, report any anomalies and abnormalities discovered between the equipment’s as per project requirement and client’s specification. Coordinate with Site E & I Supervisors, Engineers, and Vendors as well for the possible techniques and for corrective actions in resolving the related problems and for the documents and drawings that are not available on site and in the documentation, material receiving inspection, handling storage and preservation inspections and ensured contractor is complying to Company requirements. • Work with Site quality coordinator and keep him informed of work status, Quality and ATEX issues, challenges and corrective actions needed to meet project objectives. Inspection of power transformer, switchboard, UPS, lighting, earthing and heat tracing system. Inspection of instrumentation, HVAC devices, Fire and Gas detection, TELECOM and warning systems, signal, grounding, feeding instrumentation cables, junction box and instrumentation panels in substations. Manifolds pressure testing. Red Line Mark Up on drawings for E&I and Telecom Disciplines.
September 2009December 2009
4 months
Kentech Group
Electrical Technician
Atyrau / Tengiz Gas utilization project (GUP) • Electrical equipment installation: junction boxes, panels, transformers, lighting systems. Heat tracing system installation, cable tray installation, pulling of grounding & power cables, cable glanding & termination.
August 2008September 2009
1 year 2 months
Kentech Group
Electrical Technician
Atyrau / Karabatan • Electrical equipment installation junction boxes, panels, transformers 10kv, 35kv.Installation of cable tray
October 2007July 2008
10 months
Atyrau-Zharyk

Atyrau

Electrician
● Daily monitoring Electrical system in city, installation Electrical equipment.

Skills

Skill proficiency levels
MS Outlook
MS Office
Adobe Photoshop
MS PowerPoint
MS Internet Explorer
Internet

About me

Highly organized, motivated individual with 17 years solid experience in construction Electrical & Instrumentation discipline in various Oil & Gas projects such as Karabatan - EWRP Project, Kashagan - Offshore “D” Island Oil Field Project, Tengiz (KTL) - Turnaround, Tengiz (KTL) - Gas utilization project (GUP), Tengiz (KTL) - Sulfur Expansion Project (SEP), Karabatan - CCPP Project, Tengiz - WPMP-FGP-3GP project. I am strong on subjects associated with installation of Electrical equipment’s (preparation of cable trench, UG and AG cable puling & termination, installation of power transformer, MV & LV switchgears, MCC panels, Distribution Boards, Grounding and Lightning protection system, Lighting and Small power system, motors, Heat tracing system). Installation of Instrumentation equipment’s (shut-off valves, electrically driven valves, flow meters, level gauge, temperature sensors, pressure sensors, fire appliances and gas, flame detectors, combustible gas detectors, sensors, hydrogen sulfide). Installation of Telecommunication equipment’s (PAGA system, patch panel, CCTV camera, beacon and speaker). Well familiar and experienced in working with different technical documentation as P&ID, ISOs, layout, installation drawings, single line diagrams, procedures, method statements, specifications, IWP, CWP, ITP, QVDs, good knowledge of Karabatan & Tengiz fields, TCO & NCOC Systems, policies. My strength is carefulness, supervision, taskforce, ability to generate competent practical solutions under circumstances, stress resistance and ability to work under pressure and different environment, easy to interact with different type of multinational staff/workforce personnel. My principles are careful planning, promote safe work execution & encourage safe work practices with respect to deadlines and milestones, assure quality control, constant improvement on progress and productivity, increase level of commitment reliability, meet high standard professional and personal behavioral expectations, comply with zero tolerance. In my career I directly supervise crew size more than 100 electrical & instrumentation technicians on it, also I was in charge to manage and coordinate 300 employees indirect. Ready to work both in the office and field, as a team player or work on individual tasks. I am looking new opportunities to join construction or quality team where my skills & experience required to make the team successful.

Secondary special education

2021
Secondary special education
Kazakhstan University of Innovative and Telecommunication systems
Electrical power engineering, Electrical Engineer
2008
Secondary special education
Atyrau Politehnical College
Electricity and Gas mining and Oil and Gas processing, Electrical Technician

Languages

Kazakh — Native

English — C1 — Advanced

Russian — C2 — Proficiency

Citizenship, travel time to work

Citizenship: Kazakhstan

Permission to work: Kazakhstan

Desired travel time to work: Doesn't matter