Manager, Construction and Operation Superintendent (structure/mechanical/pipelines/civil/ TSF)

Specializations:
  • Other

Employment type: full time, project work/one-time assignment

Work experience 13 years 6 months

July 2025currently
11 months
Hi-Tech Group LLP
Chief Operating Officer (COO)
Oversaw full-cycle construction project operations from planning to commissioning. Managed budgets, schedules, contractors, and on-site teams. Optimized workflows, ensured compliance with safety and quality standards, and led cross-functional teams to deliver projects on time and within budget.
March 2023currently
3 years 3 months

Kazakhstan, www.kazminerals.com/ru

Mining Industry... Show more

TSF Construction and Operation Superintendent
-Ensuring that safety regulations are being followed by all personnel. -Ensure the start of the shift in a timely manner for all contractors involved in the TSF. Responsible to conduct effective safety toolbox talks daily. -Direct and coordinate all TSF construction and operations activities in all its stages in accordance with the Issued For Construction Drawings (IFCD) and the Operations and Maintenance Manual (OMM) issued by the Engineer of Record (EoR). -Ensure that the contractor executes all construction activities in accordance with the technical specifications issued by the EoR. -Responsible for maintaining strict supervision of the QC/QA third party supervisions to ensure the quality of construction materials. -Ensure that the TSF is being operated and monitored correctly in accordance with the operating procedures and design parameters specified in the Operations and Maintenance Manual (OMM). -Responsible for developing and monitoring the work plan for the TSF Construction and Operations Foreman and the TSF Operators to ensure the correct execution of the construction and operations activities for the TSF. -Participate in the planning meetings for the TSF design, construction, and operations stages. Responsible for the review and acceptance of the designs from the IFT to the IFCD stages. -Ensure a correct short-, medium- and long-term planning for all stages of the TSF in accordance with the life of mine plan (LoM) including preparation for activities during the winter period. -Maintain effective communication between the different departments involved in the TSF project. Ensure compliance with the Global Industry Standard on Tailings Management (GISTM) and best practices during the design, construction, and operations stages of the TSF. -Review and approval of estimates of work volumes executed by the earthwork’s contractor. -Attend daily progress meetings with the general contractor ensuring that activities are carried out safely, on time and under budget. Responsible to organize and coordinate the presence of TSF representatives in the daily operations meeting with the process plant superintendents on a daily basis. -Maintain proper control of all the project documentation required by the state supervision agencies, local designers, EoR, permit applications, works acceptance, etc. etc., all in accordance with the RoK regulations. Participate in the development of the scope of work or technical specifications for the contracting and procurement processes of the TSF project including: EoR, Technical Supervision, Design Supervising, CQA, Survey control, QC, etc., etc. -Participate in the recruitment processes ensuring that the best candidates are selected in a timely manner. Implement task and instructions of the head, within the framework of the position, qualifications and competence of the employee (labor function).
June 2021February 2023
1 year 9 months

Kazakhstan, www.kazminerals.com/ru

Mining Industry... Show more

TSF Construction Engineer / Construction Superintendent
1. Review, approval and acceptance of design and estimate documentation for construction work, ensuring compliance with the approved design and estimate documentation, working drawings, building codes, standards, industrial safety requirements; 2. Performing technical supervision and providing guarantees for all construction works (quality control and acceptance of completed works) in accordance with the construction norms and rules of the Republic of Kazakhstan, and the approved project; 3. Control over the approval of design and estimate documentation required by state supervision bodies and state experts; 4. Providing engineering and construction support to the executive group. Coordinating and participating in the definition and implementation of all changes to an existing project; 5. Responsibility for all aspects of the development of the implementation program, including technical tasks, performing design checks, monitoring the contractor's employees on the site, monitoring the production of work on the site and performing the function of a master on all projects in this area. 6. Technical support in the development of queries. Quality control to ensure that the project is built in accordance with the project and the company's standards. 7. Control and coordination of schedules for the implementation and commissioning of construction works. 8. Management and maintenance of operational readiness of works related to construction works; 9. Providing assistance or preparation, and submitting appropriate applications for obtaining a permit for design and construction work 10. Documentation of any deviations and their improvement, if necessary, risk assessment and implementation of corrective plans and measures. 11. Assistance in holding meetings between representatives of the customer, members of the project team and contractors regarding construction works; 12. Control over the daily work of the contractor performing earthworks in the construction of the tailings storage facility and auxiliary works so that the work is carried out in accordance with the work schedule and the vehicle and compliance with the above-mentioned requirements; 13. Review of maintenance tasks and procedures including ADB and PSA 14. Implementation of the volume plan for the tailings storage facility within the capital budget 15. Compliance with all standards and procedures of OT, TB and OOS set out in the water instruction and training, state regulatory and legal act and agreement 16. Performing the function of a Project Manager on behalf of the Project Manager for the construction of a tailings storage facility 17. Perform other tasks assigned by the direct supervisor, within the framework of their professional competence.
September 2019July 2021
1 year 11 months
Bureau Veritas Kazakhstan (ТОО Бюро Веритас Казахстан Индастриал Сервисез)

Shymkent, www.bureauveritas.kz

Construction, Real Estate, Architecture... Show more

SMP Engineer (structure / mechanical / piping)
SOUTH KAZAKHSTAN REGION OF SHAYAN VILLAGE Implementation on behalf of the Customer of technical supervision over the implementation of construction and installation works and acceptance of completed objects from contractors in accordance with the requirements of the regulatory documents of the Republic of Kazakhstan (SN RK, SNiP RK, RDS RK, SP RK, TC). Control and implementation of construction in accordance with the work schedule, compliance with the volume, timing and quality of construction and installation work, as well as the quality of the materials, products, structures used in the approved design and estimate documentation, working drawings, building codes and regulations, standards, technical conditions, security standards labor and safety, fire safety requirements. Technical acceptance of completed construction and installation works and facilities, preparation of the necessary documents. Participation in the working commissions for the acceptance of construction objects and their commissioning ... Quality control of the elimination of deficiencies and defects by construction organizations in a timely manner. Keeping records of completed construction and installation works and preparing the necessary data for reporting on the implementation of construction plans.
July 2020December 2020
6 months
Zhambyl Branch of JSC Alel Agro

Taraz, alelagro.kz

Food Products... Show more

Head of the PTD Department
Ensuring daily control of planning and operational actual accounting of the completed volume of work Development of production activities, daily-monthly, calendar schedules for construction, their adjustment and implementation of planning standards. Organization of control of the construction process, providing production with technical documentation (both in the office and on the construction site) with the necessary materials and equipment. Competent distribution of functions and tasks for employees of the production department. Coordination of the work of the specialists of your department, ensuring effective interaction between other departments of the enterprise and subcontractors. Constant interaction with the engineering staff of the organization, reports on the control of the order of work performed. Tracking and settling mutual claims of the company's divisions, analyzing their work to optimize the production process. Systematization of the production process, control of the prudent use of resources, building materials and time. Improving the efficiency of operational planning of events, regular accounting of production. Monitoring of the market of modern materials and technologies. Control of technical regulations and compliance with established norms, requirements and rules during the construction and delivery of objects. Preparation and execution of contracts with related parties and customers. Determination of planned construction costs. Development of enterprise development plans, analysis of its activities. Control over the execution of the assigned production tasks and personal orders. Work with applications for the supply of energy carriers and building materials. Monitoring the activities of subcontractors at all stages of construction work.
October 2018September 2019
1 year
JSC Montazhspetsstroy Company

Atyrau, mcc.kz

Construction, Real Estate, Architecture... Show more

Lead SMP Engineer (structure/mechanical/piping)
Determine the location of equipment, pipelines, etc., based on P&ID Develop a preliminary sketch in place, on an isometric sheet Measurements and determination of the geometry of lines and inset points in place. Development of drawings for pipelines Preparation of drawings in detail, every connection, welding, specification, etc. work on isometrics and on 2D Verification and preparation of executive drawings and their documentation for the project Acting chief of base in preparation for the production Preparation and commissioning of engineering support systems at the facilities, such as work on earthworks (civil works), work with pipelines (piping works, main lines, engineering networks). The work includes: conducting input control of documentation; developing the necessary instructions, methods; working out the technology of assembly, installation, testing; training of personnel. Development of schemes, preparation of MOS. Identification and purchase of necessary tools and materials.
February 2018October 2018
9 months
JSC Montazhspetsstroy Company

Atyrau, www.mcc.kz

Construction, Real Estate, Architecture... Show more

SMP Engineer (structure/mechanical/piping)
Participation in the development of plans, construction management; participation in the development of MOS; Control the unconditional fulfillment of the requirements of normative documents of Kazakhstan and the Customer for the construction of its activities; Organization of works in the collection of the results of the staff, according to the results of work performed, making the procedure documented; Development of a pre-project solution for the reconstruction and modernization of the runway. Control over the execution of works on approved projects. Approval of materials used in construction. Development of schemes for intersections with existing lines (cables, pipelines) Control of the correct filling of production logs, verification of the accuracy of the records made; Together with subcontractors, ensuring the timely execution of executive documentation; Participation in the development of Procedures for pipe works and general construction works; Participation in conducting hydraulic tests. Providing documentary quality control of materials, products and structures (passports, certificates). Planning of work fronts
April 2013February 2018
4 years 11 months
JSC KazStroyServıce

Almaty, kazstroyservice.com

Construction, Real Estate, Architecture... Show more

Production Technical Engineer (Civil, mechanical works)
• Object "NPS-8". Atasu-Alashonkou, Karaganda region with. Akadyr Preparation of as-built documentation for the delivery of the construction stage. Participation in the selection and approval of the location of the construction object, in the preparation of a design assignment or a document replacing it, and, if necessary, in the organization of engineering surveys. Quality control of construction and other works during construction. Drawing up drawings, executive schemes in AutoCAD Preparation of a technical solution for a change in the project. Drawing up a weekly and monthly work schedule. Control and provision of the construction site with technical and project documentation. Making changes (As-Built) • Object "Caspian Bitumen", construction of a plant, the city of Aktau Technical supervision of construction and installation works at the site. Control and provision of the construction site with technical and design documentation. Implementation of constant control over the performance of work for their compliance with working documentation, current building codes; Issuance of prescriptions for non-conformities or violations. Control over the execution of prescriptions and elimination of inconsistencies; Checking the maintenance of the necessary documentation and logs by contractors. Control of materials and equipment used, their compliance with design and estimate documentation; Preparation of documents for delivery. Participation in resolving issues on making changes to design and estimate documentation, coordination of deviations from the project; Survey of hidden works, confirmation of volumes; Control and accounting of the completed scope of work, participation in the acceptance of completed stages of construction; ID check and approval; Isometrics for pipelines, preparation of documentation for hydrotesting and welding • Object "PS Atyrau CPC-K", expansion of the existing PS, the city of Atyrau Organization of incoming control of design documentation for capital construction objects; Operational planning, coordination of construction control during the construction process; Acceptance of completed types and individual stages of construction work; Preparation and approval of the necessary technical and executive documentation; Quality control and technological sequence of all work performed; Compliance control of the supplied materials and the provided regulatory documentation; Acceptance of completed works. Drawing up drawings, executive schemes in AutoCAD Reporting, experience in procurement requests for the project Preparation of as-built documentation for the delivery of the construction stage, drawing up acts for hidden work. • Object "PS-4", Construction of PS, Atyrau region, with. Ganyushkino Preparation of documentation for the delivery of the object (design and estimate documentation) Development of a work schedule for the VET department, control of the QA / QC department for incoming control Control of work performance at the construction site (subcontractors) Drawing up a report on the scope of work performed to the head office of the company. Maintaining daily, weekly reports and notifications about upcoming works. Experience in participating in infrastructure projects; • Object "PS-3A", Construction of PS, Atyrau region, with. Akkystau Manage project documents and ensure they are in line with project procedures. Coordination of documentation in accordance with the requirements established by law and the terms of the agreement (contract) with the customer for the implementation of design and survey work and the provision of engineering and consulting services, as well as in cases of justified deviations from the current norms, rules and standards, in terms of these deviations with state bodies supervision and interested organizations that approved them; • Object "SKS-3", Increasing the capacity of the main gas pipeline Kazakhstan-China, the city of Taraz, s. Aisha-Bibi Participation in the development of long-term and current plans for the commissioning of capital construction facilities; Participation in the preparation of orders for materials and equipment, monitor the flow of materials and equipment to facilities; Participation in the development of long-term and current plans for the commissioning of capital construction facilities; Participation in the preparation of orders for materials and equipment, monitor the flow of materials and equipment to facilities; Implementation of technical
September 2012December 2012
4 months

Kazakhstan, www.kaspibank.kz

Financial Sector... Show more

Assistant to the Customer Service Manager
Working with clients of the Bank. Advice on products

Skills

Skill proficiency levels
AutoCAD
MS Office
Строительство
Наружные инженерные сети
Выполнение технического надзора
Контроль качества
Авторский надзор
Сметы
Составление сметно-проектной документации
Нефтегазопровод
Организаторские навыки
Обучение персонала
MS Outlook
Работа в команде
Деловая переписка
Подбор персонала
Грамотная речь
Формы КС-2, КС-3, М-29
Oil And Gas
Mechanical
APM Civil Engineering
Drawing
Piping
Welding
Construction
Engineering
Rst
Windows Mobile
TSF

Driving experience

Own car

Driver's license category B, C

About me

Responsiveness Politeness Ability to easily find contact with people Self confidence Ability to easily maintain business and professional contacts Ability to set priorities Optimism Active life position Ability to achieve goals Ability to effectively plan your time Creative thinking Systematic thinking Attention to detail Willingness to make decisions independently Ability to work in a team Desire for professional development Initiative

Higher education

2017
Higher education
South Kazakhstan State University named after M. O. Auezov, Shymkent
Construction and Technology (Distance and correspondence department), Industrial and civil engineering
2012
Higher education
Taraz State University named after M. H. Dulati, Taraz
Oil and gas business and mechanical engineering, Bachelor's Degree

Languages

Kazakh — Native

English — B2 — Upper Intermediate

Russian — C2 — Proficiency

Professional development, courses

2021
"TENGIZCHEVROIL" LLP Atyrau
TENGIZCHEVROIL LLP, Course: "Safe excavation work"
2021
"TENGIZCHEVROIL" LLP Atyrau
TENGIZCHEVROIL LLP, Course: "Safety when working in a confined space"
2021
"TENGIZCHEVROIL" LLP Atyrau
TENGIZCHEVROIL LLP, Course: "Working at height"
2021
"TENGIZCHEVROIL" LLP Atyrau
TENGIZCHEVROIL LLP, Course: "Assessment Of Dangerous Factors"
2021
"TENGIZCHEVROIL" LLP Atyrau
TENGIZCHEVROIL LLP, Course: "Lifting operations"
2020
VIDIS Certification Center LLP.KZ " Astana
JSC " Company Montazhspetsstroy", Construction. Qualification status: Engineering and technical worker for " Load-bearing and enclosing structures"
2020
ISEM Center LLP Atyrau
JSC " Company Montazhspetsstroy", Course: "Occupational safety and health"

Citizenship, travel time to work

Citizenship: Kazakhstan

Permission to work: Kazakhstan

Desired travel time to work: Doesn't matter