Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas less than a week ago
Male, 31 year, born on 14 February 1995
Aksay (Kazakhstan), willing to relocate (Aktau), prepared for business trips
Engineer on Piping, Pipeline and Pre-Commissioning & Commissioning
Specializations:
- Chief project engineer
- Commissioning engineer
- Production engineer, quantity surveyor
- Field engineer
- Design engineer
Employment type: full time
Work experience 10 years 7 months
July 2025 — currently
11 months
Chemical Production, Fertilizers... Show more
Главный специалист по трубопроводу
.
July 2024 — currently
1 year 11 months
KCOI (Karabatan) EPC
Mechanical and piping commissioning engineer
Slug catcher LTSC project
December 2022 — July 2024
1 year 8 months
LLP KKS-SICIM KEP1 project (EPC)
Pre-Commissioning Field Engineer
Field Engineer - Hydrotest and Pre-Commissioning department.
Preparation of test pack for the hydrotest/Leak test for pipelines.
Development of drawings of pipeline lines at P&ID and ISO
Preparation of all certificates and documentation for the hydrotest
Walkdown of pipeline with inspection HSE & DIS.
Pre-Commissioning: ITR-A/B, Punch list.
Preparing:
- Technical documentation
- Reports
- Correspondence
- Procedures
- Specifications
- Method statements
- Technical site support calculations for pipeline
- Flowline activities
Drying & Preservation with N2.
June 2022 — November 2022
6 months
Консорциум Isker "Karachaganak"
Hydrotest Engineer
Preparation of documentation for Hydrotest. Test pack.
Preparing:
- Technical documentation
- Reports
- Correspondence
- Procedures
- Specifications
- Method statements
- Technical site support calculations for pipeline
- Flowline activities
April 2021 — November 2022
1 year 8 months
LLP SICIM Kazakhstan FGP-Project Tengiz (end of the project transfered to Karachaganak KEP1project)
Pre-Commissioning Field Engineer
Field Engineer - Hydrotest and Pre-Commissioning department.
Preparation of test pack for the hydrotest/Leak test for pipelines.
Development of drawings of pipeline lines at P&ID and ISO
Preparation of all certificates and documentation for the hydrotest
Walkdown of pipeline with inspection HSE & DIS.
Pre-Commissioning: ITR-A/B, Punch list.
Preparing:
- Technical documentation
- Reports
- Correspondence
- Procedures
- Specifications
- Method statements
- Technical site support calculations for pipeline
- Flowline activities
Drying & Preservation with N2.
July 2021 — July 2021
1 month
RT Alliance "Karachaganak" Turnaround
Mechanical piping foreman
Reinstatement on 4th Injection Compressor Karachaganak petroleum operating.
June 2019 — March 2021
1 year 10 months
LLP KKS-SICIM "Karachaganak-KGDBN" (end of the project transfered to Tengiz for FGP project)
Pre-Commissioning Field Engineer
Pre-commissioning Engineer - Hydrotest and Pre-Commissioning department.
Preparation of test pack for the hydrotest/Leak test for oil pipelines.
Development of drawings of pipeline lines at P&ID and ISO
Preparation of all certificates and documentation for the hydrotest
Pre-Commissioning: ITR-A/B, Punch list.
Preparing:
- Technical documentation
- Reports
- Correspondence
- Procedures
- Specifications
- Method statements
- Technical site support calculations for pipeline
- Flowline activities
Manage coordination responsibilities for field engineering and construction works.
Manage efficient operation of the site Technical Query system and provision of correct interpretation of design to Contractor
Performed Projects did with Selection and analysis of as-built technical documentation, 3D modeling, Preparation of Isometric drawings of Piping / Pipeline and equipment connections. Analyze the location, Pipings / Pipelines, Equipment on 3D scanned files.
Participation in Shut Down 2019. Working with Field Engineering Department. (KPO B.V.)
Execution of work on project. Resolution of technical issues inside discipline adherence to project procedures and design requirements. Development of studies perform activities (DETAIL Project phases) and provide technical assistance. Interface with other project discipline.
Preparation of technical documentation: Workpack, Document Index, Tie-in List, Material take off List, Piping Scope of work, Plot Plans, General piping layout plans, Piping arrangements, Special supports and fittings, Site Survey Reports, Piping and Instrumentation Diagrams. Dimension calculation and material selection according to ASME, ANSI standards (TCO/KPO Piping material class specification) Design in the system AutoCAD and AutoCAD Plant 3D. Elaborate of design documentation: project drawings (isomet- ric drawings, 3-measurable drawings). Preparation of working drawings, construction drawings and pip- ing and instrumentation diagrams (P&ID). Development of technical and working drafts to composite constructions. Drawing up of detailing, working plans and special units on the basis of basic diagrams and outline sketches.
October 2017 — June 2019
1 year 9 months
"BatysLogistics" LLP
Driver
Aksay, Industrial zone
Function:
* Vehicle condition control (technical maintenance etc.)
* Minor repairs and driving of vehicles (both domestic and foreign manufactured)
* Corporate customers service: ride around town and region, transfers to/from airports (greet-meets).
March 2017 — June 2017
4 months
LLP Karachaganak support services "Turnaround"
Mechanical Technician
Function:
* Cleaning of pipes and wells at the overhaul of the Karachaganak field
* Hydro-testing, chemical cleaning of pipes, testing for leakage under high pressure using nitrogen and gels were performed.
* Repair and assembly of individual components and mechanisms of simple oil field equipment and valves.
August 2015 — November 2016
1 year 4 months
“Avtodom” LLP
Aksay (Kazakhstan)
Transportation, Logistics, Warehousing, International Logistics... Show more
Storekeeper
Aksay, Industrial zone
Admitted to work after youth practice.
``Avtodom'' LLP Storekeeper
Aksay, Industrial zone
Function:
* Receipt, storage and issue of inventory items at vehicle spare parts warehouse.
* To keep the proper registration and submission of all the in/out documentation.
* Making out the monthly report according to established procedures.
* Warehouse inventory.
* Requisitions and purchase orders from suppliers.
March 2014 — May 2014
3 months
LLP Construction services "Turnaround"
Technical engineer
Function:
* Cleaning and repair of pipes and wells at the Overhaul of the Karachaganak field
* Repair and assembly of individual components and mechanisms of simple oil field equipment and valves.
* Cleaning the tubing in the well of paraffin and tar with mechanical and automatic scrapers and using reagents, solvents, hot oil and steam.
* Steam treatment of high pressure underground and surface equipment wells and discharge lines. . Submission of information to the work manager and the operator about any problems observed in the operation of wells and other oilfield equipment.
Skills
Skill proficiency levels
Driving experience
Own car
Driver's license category B, CAbout me
Interpersonal Skills, Multi-tasking, Quality Control, To get work in the company that will require the skills, Microsoft Access, Microsoft Excel, Microsoft Office, Microsoft PowerPoint, Microsoft Windows, Microsoft Word
Higher education
2022
Higher education
"Apec PetroTechnic" Atyrau
Engineering, Hydrotest engineer
2019
Higher education
"West Kazakhstan University of Engineering & Technologies" Uralsk
Engineering humanitarian. Technique and technology., Transport, transport equipment and technologies. Technician Mechanical
2017
Higher education
English Courses, “Destination” Language Center.
level – Elementary
2015
Higher education
College of Oil & Gas and Sectoral Technologies, Uralsk
Professional supervising of industrial trainings, Mechanical technique (3rd level)
Languages
Professional development, courses
2022
Ingineer of Hydrotest
ApecPetroTechnic
Citizenship, travel time to work
Citizenship: Kazakhstan
Permission to work: Kazakhstan, Other
Desired travel time to work: Doesn't matter
