Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was less than a week ago

Male, 35 years, born on 15 May 1990

Atyrau, willing to relocate, prepared for business trips

Piping-mechanical engineer/Superintendent

2 200 000  in hand

Specializations:
  • Other

Employment type: full time, project work/one-time assignment

Work experience 13 years 8 months

February 2023currently
3 years 3 months
LLC ”Novus-Bolashak”

Кульсары

Oil and Gas... Show more

pre-commissioning/commissioning/ RFSU engineer
Working on commissioning/ RFSU of subsystems in 3GP-Power Booster Facilities /Wet Sour Gas. Preparing Markup drawings of subsystems for LUN and PTW, Work method statement, execution plan, procurement requests, managing supervisors and technicians (32 employees). Coordinate commissioning activities at relevant areas (PBF/WSG).
February 2021January 2023
2 years
KazTurboRemont (KTR)

Aktau, ktr.com.kz/

Construction, Real Estate, Architecture... Show more

Piping Mechanical /civil Superintendent
Overall coordinate piping & mechanical, SS, Civil construction site activities on CGF. Responsible for site construction execution and goals achieving in time. Creating Weekly work plan based on Base schedule(milestones) and materials availability. Preparing HydroTest schedule. Ordering materials. Working on constrains. Closing punches, check lists, QVDs etc. Preparation MST and Risk assessment for PTW. Attending on construction weekly and daily coordination meetings. Managing 85 employees at site
February 2019February 2021
2 years 1 month
FLUOR (KPJV)

fluor.com

Piping /Mechanical Superintendent
Overall coordinate contractors piping & mechanical construction site activities on 3GP ME&I project. Responsible for SWHU/SFHU between PARs and Modules, Pipe erection on the pipe racks. Daily reports to CM, Reviewing and Closing IWPs
September 2018February 2019
6 months
PSN Kazstroy

Aktau, www.woodgroup.com

Piping Engineer
Support / advise for maintenance team with technical queries . Performing investigations, surveys, feasibility studies, calculations and production of drawings, engineering reports and scope of work. Investigation of piping engineering issues (engineering changes and additions to piping systems) Material specification and material searches in warehouse system. Creation of isometric sketches for lines requiring modification. Mark-up of P&IDs. Support the Units in solving occurred problems to maintain and enhance production
September 2016August 2018
2 years
Isker consortcium

Atyrau, isker.kz

Oil and Gas... Show more

Field piping mechanical engineer-supervisor
Working on project Eskene West Rail Way Overall coordinator of all HVAC and process piping construction activities, conduct weekly meeting with subcontractors. Managed Piping Supervisors and Foremans, distribute daily workload, collect daily progress. Report to Construction Manager thru weekly meeting, to update progress, look ahead plans, and constrains. Coordinate to Client’s site representative the technical issue arises and propose solution at minimal cost. Coordinate construction logistics like crane, material transport, and scaffolding. Expedite HVAC and process equipment’s and piping bulk material from Client and coordinate missing or damage. Conduct random safety toolbox talk with workers to keep connection and maintain responsibility of all personnel to execute the jobs in a safe manner. Coordinate to QC department on a regular basis for construction procedures and methodology, to maintain highest quality of workmanship and according to client’s standard. Coordinate hydro test, pneumatic test, air blowing, Flushing and flange management reinstatement .Supplying with equipment’s (compressors, pumps, generators) and tools for testing. Also working on pre-commissioning and commissioning activities on Process Systems lines: Sulphur liquid System, Heating medium System, Water cooling medium System. Preparing permits for work after preliminary discussion of the work plan with the client. And giving daily report to direct manager work progress. Organizing all thinks for working on non-stop regime for pipefitters and commissioning team. Conduct training to key personnel in handling and installing delicate HVAC and process equipment and instrument.
September 2015August 2016
1 year
Weld solution

Atyrau

Piping engineer
Responsible for the preparation of piping layout based on P&ID. Checking equipment layout and installation levels, nozzle orientation and elevation, pipe support type material take off. Coordinate to other partition and to other discipline for interfacing. Generate extracted Isometric’s. Perform self-checking and back check of Isometric drawings as per P&ID and line list. Perform hydraulic calculations of pipelines. Perform calculations of piping sizing, pipe wall thickness. Checking / review vendor data and drawings. Prepare As-Built drawings.
July 2015September 2015
3 months
“Sicim”LLC,
Piping engineer
Worked on project TA-2015 Responsible for the preparation of piping layout and detailed design based on P&ID, design of equipment and piping arrangement, site plan design, piping Isometrics. Checking equipment layout and installation levels, nozzle orientation and elevation, pipe support type material take off. Coordinate to other partition and to other discipline for interfacing. Generate extracted Isometric’s. Perform self-checking and back check of Isometric drawings as per P&ID and line list. Perform hydraulic calculations of pipelines. Perform calculations of piping sizing, pipe wall thickness. Checking / review vendor data and drawings. Prepare piping 3D model and extracting. Piping plot plan and isometric drawings by 3D PDS software. Prepare As-Built drawings.
August 2012May 2015
2 years 10 months
“Poligram”LLP, Atyrau city Position

Atyrau, Poligram.com

Construction, Real Estate, Architecture... Show more

Piping designer engineer
Responsible for the preparation of piping layout and detailed design based on P&ID, design of equipment and piping arrangement, site plan design, piping Isometrics. Checking equipment layout and installation levels, nozzle orientation and elevation, pipe support type material take off. Coordinate to other partition and to other discipline for interfacing. Generate extracted Isometric’s. Perform self-checking and back check of Isometric drawings as per P&ID and line list. Perform hydraulic calculations of pipelines. Perform calculations of piping sizing, pipe wall thickness. Checking / review vendor data and drawings. Prepare piping 3D model and extracting. Piping plot plan and isometric drawings by 3D PDS software. Prepare As-Built drawings.

Skills

Skill proficiency levels
Исполнительность
Project management
Организаторские навыки
Управление производством
Технический контроль производства
Leadership Skills
Монтаж оборудования
Умение планировать
Промышленная безопасность
Строительство
Деловая переписка
Обучение и развитие
Английский язык

About me

Computers, reading, sport (3 times Kazakhstan Judo Championship prize winner, 2 times Champion of Kazakhstan, repeated International tournaments competitor and prize winner) Initiative, Goal-aimed, Creative  Disciplined, Punctual, Practical  Appreciate Communicability and Tact  Strive to Implement my Knowledge and Opportunities  Strive to Improve my Skills

Higher education

2012
Higher education
Kazakh National Technical University n.a. K.I.Satpayev (Almaty, Kazakhstan)
Petroleum engineering, Petroleum Engineer

Languages

Kazakh — Native

English — B2 — Upper Intermediate

Citizenship, travel time to work

Citizenship: Kazakhstan

Permission to work: Armenia, Belarus, Kazakhstan, Kyrgyzstan, Russia, Uzbekistan

Desired travel time to work: Doesn't matter