Piping-mechanical engineer/Superintendent
2 200 000 ₸ in hand
Specializations:
- Other
Employment type: full time, project work/one-time assignment
Work experience 13 years 8 months
February 2023 — currently
3 years 3 months
LLC ”Novus-Bolashak”
Кульсары
Oil and Gas... Show more
pre-commissioning/commissioning/ RFSU engineer
Working on commissioning/ RFSU of subsystems in 3GP-Power Booster Facilities /Wet Sour Gas. Preparing Markup drawings of subsystems for LUN and PTW, Work method statement, execution plan, procurement requests, managing supervisors and technicians (32 employees). Coordinate commissioning activities at relevant areas (PBF/WSG).
February 2021 — January 2023
2 years
KazTurboRemont (KTR)
Aktau, ktr.com.kz/
Construction, Real Estate, Architecture... Show more
Piping Mechanical /civil Superintendent
Overall coordinate piping & mechanical, SS, Civil construction site activities on CGF.
Responsible for site construction execution and goals achieving in time. Creating
Weekly work plan based on Base schedule(milestones) and materials availability.
Preparing HydroTest schedule. Ordering materials. Working on constrains. Closing
punches, check lists, QVDs etc. Preparation MST and Risk assessment for PTW.
Attending on construction weekly and daily coordination meetings. Managing 85
employees at site
February 2019 — February 2021
2 years 1 month
FLUOR (KPJV)
Piping /Mechanical Superintendent
Overall coordinate contractors piping & mechanical construction site activities on
3GP ME&I project. Responsible for SWHU/SFHU between PARs and Modules, Pipe
erection on the pipe racks. Daily reports to CM, Reviewing and Closing IWPs
September 2018 — February 2019
6 months
PSN Kazstroy
Aktau, www.woodgroup.com
Piping Engineer
Support / advise for maintenance team with technical queries . Performing investigations, surveys, feasibility studies, calculations and production of drawings, engineering reports and scope of work. Investigation of piping engineering issues (engineering changes and additions to piping systems) Material specification and material searches in warehouse system. Creation of isometric sketches for lines requiring modification. Mark-up of P&IDs. Support the Units in solving occurred problems to maintain and enhance production
September 2016 — August 2018
2 years
Isker consortcium
Atyrau, isker.kz
Oil and Gas... Show more
Field piping mechanical engineer-supervisor
Working on project Eskene West Rail Way
Overall coordinator of all HVAC and process piping construction activities, conduct weekly meeting with subcontractors.
Managed Piping Supervisors and Foremans, distribute daily workload, collect daily progress.
Report to Construction Manager thru weekly meeting, to update progress, look ahead plans, and constrains.
Coordinate to Client’s site representative the technical issue arises and propose solution at minimal cost.
Coordinate construction logistics like crane, material transport, and scaffolding.
Expedite HVAC and process equipment’s and piping bulk material from Client and coordinate missing or damage.
Conduct random safety toolbox talk with workers to keep connection and maintain responsibility of all personnel to execute the jobs in a safe manner.
Coordinate to QC department on a regular basis for construction procedures and methodology, to maintain highest quality of workmanship and according to client’s standard.
Coordinate hydro test, pneumatic test, air blowing, Flushing and flange management reinstatement .Supplying with equipment’s (compressors, pumps, generators) and tools for testing.
Also working on pre-commissioning and commissioning activities on Process Systems lines: Sulphur liquid System, Heating medium System, Water cooling medium System. Preparing permits for work after preliminary discussion of the work plan with the client. And giving daily report to direct manager work progress. Organizing all thinks for working on non-stop regime for pipefitters and commissioning team.
Conduct training to key personnel in handling and installing delicate HVAC and process equipment and instrument.
September 2015 — August 2016
1 year
Weld solution
Atyrau
Piping engineer
Responsible for the preparation of piping layout based on P&ID. Checking equipment layout and installation levels, nozzle orientation and elevation, pipe support type material take off. Coordinate to other partition and to other discipline for interfacing. Generate extracted Isometric’s. Perform self-checking and back check of Isometric drawings as per P&ID and line list. Perform hydraulic calculations of pipelines.
Perform calculations of piping sizing, pipe wall thickness. Checking / review vendor data and drawings. Prepare As-Built drawings.
July 2015 — September 2015
3 months
“Sicim”LLC,
Piping engineer
Worked on project TA-2015 Responsible for the preparation of piping layout and detailed design based on P&ID, design of equipment and piping arrangement, site plan design, piping Isometrics. Checking equipment layout and installation levels, nozzle orientation and elevation, pipe support type material take off. Coordinate to other partition and to other discipline for interfacing. Generate extracted Isometric’s. Perform self-checking and back check of Isometric drawings as per P&ID and line list. Perform hydraulic calculations of pipelines.
Perform calculations of piping sizing, pipe wall thickness. Checking / review vendor data and drawings. Prepare piping 3D model and extracting. Piping plot plan and isometric drawings by 3D PDS software. Prepare As-Built drawings.
August 2012 — May 2015
2 years 10 months
“Poligram”LLP, Atyrau city Position
Atyrau, Poligram.com
Construction, Real Estate, Architecture... Show more
Piping designer engineer
Responsible for the preparation of piping layout and detailed design based on P&ID, design of equipment and piping arrangement, site plan design, piping Isometrics. Checking equipment layout and installation levels, nozzle orientation and elevation, pipe support type material take off. Coordinate to other partition and to other discipline for interfacing. Generate extracted Isometric’s. Perform self-checking and back check of Isometric drawings as per P&ID and line list. Perform hydraulic calculations of pipelines.
Perform calculations of piping sizing, pipe wall thickness. Checking / review vendor data and drawings. Prepare piping 3D model and extracting. Piping plot plan and isometric drawings by 3D PDS software. Prepare As-Built drawings.
Skills
Skill proficiency levels
About me
Computers, reading, sport (3 times Kazakhstan Judo Championship prize winner, 2 times Champion of Kazakhstan, repeated International tournaments competitor and prize winner) Initiative, Goal-aimed, Creative
Disciplined, Punctual, Practical
Appreciate Communicability and Tact
Strive to Implement my Knowledge and Opportunities
Strive to Improve my Skills
Higher education
2012
Higher education
Kazakh National Technical University n.a. K.I.Satpayev (Almaty, Kazakhstan)
Petroleum engineering, Petroleum Engineer
Languages
Citizenship, travel time to work
Citizenship: Kazakhstan
Permission to work: Armenia, Belarus, Kazakhstan, Kyrgyzstan, Russia, Uzbekistan
Desired travel time to work: Doesn't matter