Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was more than a week ago

Male, 34 years, born on 17 September 1991

Almaty, not willing to relocate, prepared for business trips

Electric power industry

Specializations:
  • Power engineer, electrical engineer

Employment type: full time

Work experience 12 years 8 months

February 2022currently
4 years 3 months
RMK Systems, LLP

Almaty, www.rmk.kz

Construction, Real Estate, Architecture... Show more

Sales Engineer/Project manager
Main responsibilities. 1) Search for procurement proposals on Internet portals, search for potential buyers (cold calls), organization of meetings, presentation of offered goods and services. 2) Work with large customers such as Beineu-Shymkent Gas Pipeline LLP, Asian Gas Pipeline LLP, Intergas Central Asia JSC, Crystal Management JSC. 3) Processing the received delivery request: - Request a price from the manufacturer; -After receiving a commercial offer, make a calculation taking into account all possible costs (including transport, duty, brokerage services, customs clearance, travel allowances, daily allowances, bank commissions, VAT) + profit. - Preparation of a commercial offer. Additional responsibilities. 1) -preparation of tender documentation for participation in the tender. - preparation of tender documentation - submission of documentation 2) Procurement procedures: placing an order, purchasing the supplied equipment 3) Lead the project, from preparing documentation, placing an order, coordinating the project, handing over the project. 4) Support for the project "Construction of the TIP-04" and "Construction of the AGRS TEC-3" in the Almaty region
September 2020January 2022
1 year 5 months

Almaty

Utilities... Show more

Service Engineer
Maintenance of fire automatics. Pass signal test on the operator's console, functional test of the early smoke detection system and maintenance of the early smoke detectors - Hart XL - Firelink 100 - Firelink 400 - Vesda VLF Replacing a Hart XL system with a Stratos 400: -Dismantling of the Hart XL early fire detection system. -Installation of early fire detection system Stratos 400 - Functional check of the system. Checking the gas fire extinguishing system and servicing the gas fire extinguishing system - Sinorix - LPG
September 2018July 2020
1 year 11 months

Atyrau, www.woodplc.com

Oil and Gas... Show more

Senior Electrical designer
LLP "Tengizchevroil" Tengiz, www.tengizchevroil.com Project "Upgrade SLD Drawings" in SmartPlant Electrical. Introduction of existing electrical equipment in SPEL Generation of single-line diagrams in SPEL (KTL PLANT) Creation of technical data sheets, cable schedules in SPEL
July 2017September 2018
1 year 3 months

Atyrau, www.woodplc.com

Oil and Gas... Show more

Electrical designer
LLP "Tengizchevroil" Tengiz, www.tengizchevroil.com Project "Upgrade SLD Drawings" in SmartPlant Electrical. Introduction of existing electrical equipment in SPEL Generation of single-line diagrams in SPEL (KTL PLANT) Creation of technical data sheets, cable schedules in SPEL
November 2016June 2017
8 months

Kazakhstan, www.bolashak.com

Business Services... Show more

Electrical Designer
LLP "Tengizchevroil" Tengiz, www.tengizchevroil.com Project "Upgrade SLD Drawings" in SmartPlant Electrical. Introduction of existing electrical equipment in SPEL Generation of single-line diagrams in SPEL (KTL PLANT) Creation of technical data sheets, cable schedules in SPEL
December 2013October 2016
2 years 11 months

Almaty, www.rmg.kz

Oil and Gas... Show more

Engineer
Responsibilities: -Responsibility for document management project -Selection gas equipment’s -Execution of as-build-drawing (drawings on Autocad) -Preparation of mechanical catalogues -Filling, coordination and delivery of executive project documentation Construction of gas metering stations "Akbulak" (LLP "Beineu-Shymkent-Bozoi") - Preparation of technical documentation (design and coordination of drawings "as built" mechanical catalogue) - Preparation and submission of executive "as built" documentation Field camps Karaozek, Shornak ("KONTI" LLP) - Preparation of technical documentation (design, coordination, translation and preparation of mechanical catalogues) for camps - Preparation of technical documentation (design, translation and preparation of mechanical catalogues) for Automated gas distribution stations Construction of a compressor station ("Kazstroyserviсе" JSC) - Preparation of technical documentation (translation and drafting of mechanical catalogues)
August 2013December 2013
5 months
Elektromehanicheski zavod Zharyk, LLP

Almaty

Utilities... Show more

Wireman
- Dismantling and installation of high-voltage disconnectors at switchyard - Dismantling of high oil switches and installation of gas-insulated circuit breakers at switchyard - Cable management at 10kV - Installation of lighting to illuminate at switchyard

Skills

Skill proficiency levels
AutoCAD
Mathcad
SmartPlant Electrical
MS Outlook
Adobe Photoshop
MS Office
standards and technical documentation
Project Documentation

Driving experience

Driver's license category B

About me

Experienced PC user Possession of office equipment: fax, modem, scanner, copiers, printer. Personal qualities: an independent, swift, responsive, quickly learn new material, prone to higher education, able to work equally efficiently both in a group and individually.

Higher education

2013
Higher education
Almaty University of Power Engineering and Telecommunications
Electric Power, Electric generating stations

Languages

Kazakh — Native

English — B1 — Intermediate

Russian — C2 — Proficiency

Citizenship, travel time to work

Citizenship: Kazakhstan

Permission to work: Kazakhstan

Desired travel time to work: Doesn't matter