Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Был меньше недели назад

Мужчина, 37 лет, родился 6 сентября 1988

Кульсары, готов к переезду (Атырау), не готов к командировкам

Turnover, QAQC, Systems Completion, Construction

800 000  на руки

Специализации:
  • Инженер по качеству
  • Инженер-энергетик, инженер-электрик

Тип занятости: полная занятость

Опыт работы 15 лет 7 месяцев

Май 2022Сентябрь 2024
2 года 5 месяцев
Tengizchevroil via Bolashak Atyrau
3GP Systems Completion Instrument Validation Engineer
• Implementation of the systemization in the Systems Completion Database, in line with processes and work instructions. Verify and systemize tags to the correct subsystem, as per technical and systemized drawings. • As an I&C SME validate and provide guidance on the I&C systemization and corresponding Inspection records and checksheets assignment in the database, in line with ITP and project procedures and specifications. Maintain Tag Type Matrix and coordinate any changes required • Support the MCPlus Systems Completion Database workflows, management of change of the database and support the certification process. • Assessed and incorporated Design Change Notices (DCNs) into the Systems Completion Database, promptly making all necessary updates and adjustments to ensure comprehensive and precise documentation. • Communicate with site personnel and other affected teams to ensure Database changes are understood and implemented as agreed. Implement systemized drawings changes, including issuing work scope boundary mark ups when needed. • Assumed responsibility for meticulously documenting all I&C certification materials throughout each stage of the project lifecycle, encompassing Construction, Pre-Commissioning, Commissioning, Ready for Start-Up, and Ready for Operations. These efforts enabled Operations and Maintenance teams to easily track and access the necessary inspection records and certificates. • Ensure I&C database content supports the certification phases of the project. • Ensure any overlapping with other disciplines is validated and correctly systemized in the database. • Review COW activities from Yard Sail away when impacting site database and completions processes. Ensure Vendor and field data are allocated correctly • Interface with engineering and Information Management to resolve data issues. To ensure integrity of data, check engineering data on a periodic basis and perform updates as required. • Raising Technical Queries for any completions issue.
Декабрь 2019Май 2022
2 года 6 месяцев
Tengizchevroil via Bolashak Atyrau
Systems Delivery Engineer
• Cross checking between Engineering Deliverables and systemized Drawings. Engaging FB Systemization and define Priorities for them. • Reviewing full Subsystem Drawings and Engineering deliverables in conjunction with MC plus. • Ensuring the DOC Console worked properly based on the revised deliverables. Ensuring necessary weekly updates. Reviewing Contractor queries for Tagging. • Leading the QVD Allocation and assisting Contractor. • Leading the Optimization Strategy and conducting regular trainings-workshops to the Contractors • Solving the issues between Contractors and QAC-RA teams. Finding the root cause of all problems and solve it with all team conclusions. • Always looking for optimal way to perform to job and change the strategies when necessary. • Facilitating Red Zone Meetings and collecting the necessary Data for it. • Based on the Commissioning Strategies developing the Skylines. Visiting all the Systemization Drawings and defining the priorities. • Engaging with the FGP Planning Team and ensuring alignment between Skyline and P6 Schedule. • Assisting Planning Team to associate Subsystems with the Subsystems. • Developing the Constraint Logs for each subsystem for commissioning works. Conducting regular meetings and define accountability of each System • Owners with specific dates. Ensuring the alignment between Turnover team and the Contractors
Март 2017Декабрь 2019
2 года 10 месяцев
GATE

gatein.gatekz.com/gatein/

Услуги для бизнеса... Показать еще

Deputy Turnover Completion Manager
• Reviewing all Scope Drawings: Process Flow Diagrams, P&IDs, Single Lines, Block Diagrams, Fire and Gas Drawings and Systems into QVDs matrix and maintaining them accurately to reflect changes, including updating component system designations according to scope drawing updates. • Managing component equipment types and associated Quality Verification Document (QVD) (Checklist and ACT) requirements per GATE Quality Department and issued Inspection and Test Plans (ITPs) requirements as well as GATE Regulatory Affairs and Technical and Design Supervision requirements for RoK ACTs. • Responsible for collection of turnover data and compilation of turnover data for project handover to client. • Reviewing Job Packs or SOW to generate the QVDs matrix of inspection and test records (Checklists and ACTs) associated with that Job Pack and configuring the information. Providing the QVDs matrix to the Job Pack author such that it can be included in the Rev 0 of the Job Pack.
Январь 2016Февраль 2017
1 год 2 месяца
Compas Service

Атырау

Строительство, недвижимость, эксплуатация, проектирование... Показать еще

QA/QC Manager
Quality Control and Field reviews of work practices, inspections and documentation to ensure Contractors and Subcontractors execution according to approved procedures, codes, specifications and regulations
Сентябрь 2015Декабрь 2015
4 месяца

Атырау, www.cbs-atyrau.kz/o-kompanii/

Строительство, недвижимость, эксплуатация, проектирование... Показать еще

As-Built Documentation Engineer
Work up and embedding detailed matrixes of as-built documentation according to RoK Norms and Requirements (GOST, SNiP of RoK ,VSN and IEC Standards /
Сентябрь 2013Июнь 2015
1 год 10 месяцев
Promstroy-energo

Атырау, www.psenergo.kz/sections/contacts

Строительство, недвижимость, эксплуатация, проектирование... Показать еще

QA/QC Inspector
Quality Control and Field reviews of work practices, inspections and documentation to ensure General Contractor and Subcontractors execution according to approved procedures, codes, specifications and regulations, Quality control plans, inspection and test plans on all types of performed works (earth, concrete works, installation, assembly and testing of electric and control cables, installation and testing of electric equipment
Сентябрь 2012Июль 2013
11 месяцев
LLP KMSC “Kaz Munai Sevices & Construction”

Атырау, www.kazmunaiservices.com/index.php?lang=ru

Строительство, недвижимость, эксплуатация, проектирование... Показать еще

QA/QC Engineer
Quality Control and Field reviews of work practices, inspections and documentation to ensure Contractors and Subcontractors execution according to approved procedures, codes, specifications and regulations
Июль 2009Июль 2012
3 года 1 месяц
“Bonatti S.p.A”

Атырау, www.bonatti.it

Строительство, недвижимость, эксплуатация, проектирование... Показать еще

QA/QC Inspector
Quality Control and Field reviews of work practices, inspections and documentation to ensure General Contractor and Subcontractors execution according to approved procedures, codes, specifications and regulations, Quality control plans, inspection and test plans on all types of performed works (installation, assembly and testing of electric and control cables, installation and testing of electric equipment)
Ноябрь 2008Июль 2009
9 месяцев
“Renco KAT”

Атырау, www.hotelriverpalace.com

Electrical Technician Assistant
Perform Electrical works of Lighting and Small Power Systems; Earthling and Lightning Protection Systems; F&G Detection and Fire Alarm Systems; Emergency Shutdown System (ESD), Programmable Logic Controller

Навыки

Уровни владения навыками
MS Access

Обо мне

Смотреть футбол, Читать

Высшее образование

2011
Высшее образование
Энергетика, Автоматизация технологических процессов и производств (по отраслям)

Знание языков

Казахский — Родной

Английский — B1 — Средний

Русский — B2 — Средне-продвинутый

Гражданство, время в пути до работы

Гражданство: Казахстан

Разрешение на работу: Казахстан

Желательное время в пути до работы: Не имеет значения