Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Был меньше недели назад

Мужчина, 42 года, родился 9 апреля 1984

Атырау, готов к переезду, готов к командировкам

Инженер по контролю качества

1 000 000  на руки

Специализации:
  • Технолог

Тип занятости: полная занятость

Опыт работы 18 лет 8 месяцев

Апрель 2023по настоящее время
3 года 1 месяц
NCOC

Нефть и газ... Показать еще

QA/QC Engineer
Managed the full project lifecycle, from the tender phase through engineering and final project completion. Raised and managed Non-Conformance Reports (NCRs) and Technical Queries (TQs) to ensure adherence to quality standards and regulatory compliance. Led a team conducting daily site inspections, ensuring that all activities were executed according to the required quality standards. Organized and conducted project review meetings, discussing progress, addressing quality concerns, and implementing corrective actions. Monitored and assessed the performance of engineering and construction contractors, evaluating their effectiveness through Key Performance Indicators (KPIs). Facilitated and led Lessons Learned sessions to identify areas for improvement and drive continuous enhancement of project delivery. Performed internal and external audits to evaluate project compliance with established standards and assess overall performance. Created and maintained project dashboards, providing stakeholders with clear and up-to-date insights into project progress and potential issues.
Февраль 2019Апрель 2023
4 года 3 месяца
TCO (via Fircroft)

Казахстан

FGP Operations Control & Power QA/QC Lead
Responsibilities: Lead and work with Project teams (P&C Systems Completion, Quality Control, Operations and Maintenance, Regularity Affairs etc.) and TCO Base Business Facility Engineering organization to implement agreed Quality Deliverables validation work processes and procedures; consult with all involved responsible stakeholders if needed. Provide leadership and guidance for the validation of delivery work processes and make suggestions to improve as needed, specifically related to Quality / Handover documentation. Responsible to review and check the Quality deliverables’ completeness status during the fabrication, construction and commissioning, start-up stages by component / sub-system / system. Lead to track and verify that Quality documents status obtained after construction and commissioning, validated and electronic files are received for Handover to TCO Base Business. Ensure quality records have been provided at Operations Acceptance for a Start-up of the Facility and handed over before Stable Production. Support and provide inputs for the activities assigned to Power & Control Handover scope related to Quality Documentation. Monitor the readiness status of sub-systems / systems and check the receipt of completion data / documents. Identify and address any gaps associated with the Quality records completion verification for Operations Acceptance. Assist to the relevant Project teams in defining and allocating the Quality Verifying deliverables needed for Power & Control.
Август 2018Февраль 2019
7 месяцев

Казахстан

Строительство, недвижимость, эксплуатация, проектирование... Показать еще

Head of QA/QC Department
Doosan Heavy Industries & Construction - EPCM Contractor (South Korean company) The Karabatan Power Plant Project comprises of 4 Gas Turbine Generators, 4 Heat Recovery Steam Generators and 2 Steam Turbine Generators. The plant will have agross capacity of 310MW. A fully Combined-Cycle Power Plant with an installed capacity of 310MW at 110kV and generating and distributing High Pressure steam for Special Economic Zone “National Industrial Petrochemical Technopark” Responsibilities ● Control and the distribution company’s overall documentation. ● Monitor all quality related activities on the project. ● Perform all external and internal audits on behalf of the company’s management. ● Verify contractor quality requirements are specified to contractor documentation submittals. ● Attend client quality management meetings ● Review quality inspection personal qualifications and training requirements. ● Monitor the disposition of all issued surveillance and non-conformance reports ● Coordinate all QA/QC activities ● Monitor statistical method reporting
Июль 2016Июль 2018
2 года 1 месяц
Orion Group

Казахстан, Tengiz.OrkenProject

Senior E&I QC Inspector
• Leading a project QA/QC electrical inspectors • Development and implementation of project specific Quality Management Plans that include requirements to be implemented during all phases by TCO, contractors and suppliers. • Focus on prevention and early detection of quality related issues, reduction of rework and cost improvement throughout project execution. • Development of project specific Quality Policy that clearly establishes responsibility and accountabil-ity with regard to management’s intention for Quality. • Implementation of Quality section of Project Execution Plans. • Generate internal surveillance punch list and inspection reports. Coordinate with contractors on daily progress checklist and punch list clearing. • Review plans and specification and other project documents. • Monitoring compliance of the design documentation standards, construction and installation contracto guidelines, regulations, requirements of government agencies. Registration of issued acts • Full control over the performance of work and tasks to eliminate comments (punch lists); • Provide surveillance report as per project specification. • Reviewed material certificates, calibration certificates, and other documentation associated with mate-rials and equipment delivered to the site. • Reported nonconformity to requirements and monitored the corrections and corrective actions.
Май 2015Декабрь 2016
1 год 8 месяцев

Казахстан

E&I QA/QC Inspector
• Carrying out of visual inspection on places of electrical & instrument installation works. Prepar-ing of official reports by results of inspection; • Full control over the performance of work and tasks to eliminate comments (punch lists); • Material receiving inspections at the customer's warehouse (transformers, cable trays, cable drums, glands, etc.) as per packing lists, purchase orders and datasheets; • Сontrol over the work of installation of cable ladders/trays, laying of all types of cables in trenches and trays as as per the project specification and relevant drawings; • Inspection of installation electrical/instrument equipment’s at site; • Inspect all Construction Activities and Testing in Compliance to Project ...Specification with wit-ness by client Representatives. • Witnessed cable testing and loop checking. • Prepare Documentation Report regarding Testing and Inspection submit to Client. • Supervised for the Installation of Instruments (Pressure / Temperature Indicator Transmitters from, level indicator Transmitters and Level Switches from) for the replacement of existing in-struments. • Verification granted documentations and its consequent completion. • Issuance of acts in case of its unavailability to Project Requirements. • Provide surveillance report as per project specification. • Installation inspection of power equipment and control and power cables laying. • Preparation and issuance of acceptance documentations for all listed works. • Development, preparation and technical documents selection (protocols and acts for laying, in-stallation and inspection of cables and completed equipment) for further commissioning • Produce an examination of hidden work acts according to SN RK 1.00.03-2011 and VSN 123-90.
Апрель 2015Апрель 2016
1 год 1 месяц

Казахстан

E&I QA/QC Inspector
Provided electrical and instruments quality inspection for CTC (Caspian Pipeline Consortium). Responsible for assisting the QA/QC Supervisor in quality control related activities. Review plans and specification and other project documents. Carry out inspection in accordance with the approved Pro-ject Inspection and Test Plan. Responsible for the implementation of the Quality Control related to elec-trical and instrumentation works in accordance with project specifications and engineering standards. Conduct inspection with contractors inspectors and supervisors for both electrical, instrumentation and telecom installation and erection activities. Provided support for the receipt inspection of materials when requested, to carry out stage inspection and final inspection of E&I work, progressively review inspection and test records prepared by Execution Contractors. Reviewed material certificates, calibra-tion certificates, and other documentation associated with materials and equipment delivered to the site. Reported nonconformity to requirements and monitored the corrections and corrective actions. Wit-nessed of HV/ LV cable testing to include continuity, megger, hi potential test, and instrument calibra-tion. Generate internal surveillance punch list and inspection reports. Coordinate with contractors on daily progress checklist and punch list clearing. Coordinate and execute walk down and punch list ac-tivities for both electrical, instrumentation and telecom. Performed in commissioning activities on Elec-trical Heat Tracing.
Сентябрь 2011Март 2015
3 года 7 месяцев
Caspian Business Support LLP

Казахстан

Electrical Engineer
• Making Acts, protocols and Electrical Logs in the basis of checklists and reports • Generating of matrix circuit for all work types • Issuing a dossier and submitting to the Client • Checking equipments passports, certifications, quality control documents compliance RoK standards. • Act preparation by VSN forms for electrical, automation (Instrumentation) discipline • Issuing acts of hidden works, protocols • General log preparation for Electric Installation, Instrumentation • Dossier packaging and transfer to AGIP KCO • General log preparation for Electric Installation, Instrumentation • Analysis of subsystems on RoK Dossier condition • Monitoring compliance of the design documentation standards, construction and installation contrac-tor guidelines, regulations, requirements of government agencies. Registration of issued acts • Implementation of the intermediate stages of acceptance of work performed.
Сентябрь 2007Август 2011
4 года
Sicim

Казахстан

Electrical &Cathodic Protection QA/QC Engineer
• Carrying out of visual inspection on places of electrical & cathodic protection works. Preparing of official reports by results of inspection; • Full control over the performance of work and tasks to eliminate comments (punch lists); • Inspect all Construction Activities and Testing in Compliance to Project ...Specification with wit-ness by client Representatives. • Development, preparation and technical documents selection (protocols and acts for laying, in-stallation and inspection of cables and completed equipment)for further commissioning • Provide surveillance report as per on project specification. • Checking of incoming materials and preservation

Навыки

Уровни владения навыками
Продвинутый уровень
Teamplayer
Контроль качества
Управление качеством

Опыт вождения

Имеется собственный автомобиль

Права категории B

Обо мне

A highly adaptable and competent Quality Control Engineer with 17 years of experience in quality control with KPD Onshore & Offshore project, CPC, expansion of Pump station project & TCO, New Camp-Orken Village project & Karabatan Powr Plant project. Computer literacy and good trilingual communications skills (English – Russian - Kazakh). Maturity, a good attitude, high potential, responsibility, ability to analyse and work on own initiative and closely with other staff. Looking for an opportunity to improve and deepen my knowledge and skills, and also to realize my professional skills to reach the big successes in perspective company.

Высшее образование

2017
Высшее образование
2006
Высшее образование
Механический, ЭНЕРГЕТИКА, ЭНЕРГЕТИЧЕСКОЕ МАШИНОСТРОЕНИЕ И ЭЛЕКТРОТЕХНИКА

Знание языков

Казахский — Родной

Английский — B2 — Средне-продвинутый

Гражданство, время в пути до работы

Гражданство: Казахстан

Разрешение на работу: Казахстан, Россия

Желательное время в пути до работы: Не имеет значения