Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas less than a week ago
Male, 41 year, born on 17 August 1984
Almaty, willing to relocate, prepared for business trips
Business development /Sales / Project Engineer
2 400 000 ₸ in hand
Specializations:
- Other
Employment type: full time
Work experience 20 years 7 months
January 2017 — currently
9 years 4 months
Equipment and service supplier companies
Almaty
Business development manager
BD/Project /Sales manager /Head in a various service/equipment supplier companies. Number of world brands distributor - GE Oil&Gas, Nuovo Pignone, Bently Nevada, Suzler, MTU (Rolls-Royce), Shell Lubricants. Serve as primary customer contact, resolve specific and commercial issues, ensure customer satisfaction and on-time delivery according to contract. Overall project owner responsible for multidisciplinary teams including Engineering, Logistics, Finance and Services
October 2008 — October 2016
8 years 1 month
BG Group plc
Astana
Lead Reservoir Engineer/Production Technologist
Lead a small team of engineers and Economist and assumed primary responsibility for accuracy and timely delivery of Project presentation materials for Functional and Management Reviews (Decision gates), and any other key meetings
Responsible for delivering technical inputs into Business/Strategy Planning and ensure Projects milestones are properly followed
Reserves: Classification, quarterly update, QA/QC and Submission; SEC and PRMS
Technical studies performed: Gas injection optimization, Sector modelling for water production analysis; identify uncertainty parameters, their ranges and impact on overall recovery
Dynamic reservoir simulation model update and calibration (for a carbonate reservoir with more than 30 years of production history: current well stock of 100+ producers and ~20 active injectors with daily production rate of ~450 kboed)
Integration of Petrel/Eclipse/MEPO: development of workflows for increased efficiency
Occasionally performed as team leader whenever Subsurface Manager is away
Integrated Asset Modeling for production optimisation and monthly medium/long term forecasting
New wells/Projects evaluation, Production optimisation utilising Integrated Network Modelling tools (GAP, Prosper) and Eclipse simulator
Focal point of collaborative, multidisciplinary team (Subsurface, Economics, Commercial) delivering monthly production forecasting to Group
Production Performance Reporting tools implementation, maintenance and upgrade
January 2007 — January 2008
1 year 1 month
Westminster Caspian LLP
Almaty
Production Engineer
* Well performance analysis to identify production enhancement candidates
* Prevention of organic solids deposition in tubing and near-wellbore area
January 2006 — January 2007
1 year 1 month
Aktau, www.maerskoil.com
Chemical Production, Fertilizers... Show more
Well Site/Petroleum Engineer
Responsible for Dunga Field Reservoir/Production data management
Monthly Production forecasting, Member of the field development plan team
Evaluating and selecting optimal pump units (SRP, PCP, ESP) for several wells
Coordination and management of site activities and contractors to ensure standby time is minimized, “assistant Company Man”
Cost control: ensure all the rig activities and/or equipment costs are in line with the contracts and within budget, detailed variance analysis, investigation of cost reduction opportunities
Witness rigsite activities such as drilling, casing, cementing, logging, perforation, completion (open/cased hole), multi-stage fracture stimulation. Ensure the drilling program is properly followed
Negotiations with local authorities on various issues
January 2005 — January 2006
1 year 1 month
Karachaganak Petroleum Operating BV
Aksay (Kazakhstan)
Petroleum Engineer
Petroleum Engineer, Reservoir and Petroleum Engineering Department
* Responsible for daily field production optimisation decisions including well line-up to meet production targets
* Production allocation for input in to reservoir model ;
* Well Test interpretation, Well Flow Regime issues ;
* Repeat Formation Tester (MDT, RCI) data QC and analysis. PDMS control
* Familiarised with field gathering system (Treatment centres, remote manifolds)
May 2005 — November 2005
7 months
HALLIBURTON International Inc
Engineer trainee
Production Enhancement and Zonal Isolation Department
* Cement job design, planning and execution. Service job for cementing equipment
July 2003 — July 2003
1 month
Turgai Petroleum
Kyzylorda
Summer intern
Turgai is developing the Kumkol oilfield in Southern Kazakhstan
* Summer Intern, Assistant of Field Engineer, Department of Production and Technologies
Skills
Skill proficiency levels
Driving experience
Driver's license category B
About me
Reservoir Engineer of the giant pre-salt Karachaganak field. Broad range of reservoir management experience encompassing field production optimisation, reserves booking, development planning field operations. Experience representing BG at industry level, influencing external and internal stakeholders and working in complex JV environments.
Demonstrated ability in reservoir management and project management with an aptitude for delivering on time, within budget and with a strong safety focus. Consistent application of technical acumen to deliver and protect business value. Multidisciplinary background leveraged in an ability to communicate effectively with a broad range of professionals in subsurface, surface and management.
Higher education (master)
2005
Higher education (master)
Ecole Nationale Supérieure de Géologie de Nancy (France)
Reservoir engineering and hydrodynamics, Reservoir engineering
2005
Higher education (master)
Нефти и газа, Разработка и эксплуатация нефтяных и газовых месторождений
Languages
Citizenship, travel time to work
Citizenship: Kazakhstan
Permission to work: Kazakhstan, Russia
Desired travel time to work: Doesn't matter