Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was less than a week ago

Male, 41 year, born on 17 August 1984

Almaty, willing to relocate, prepared for business trips

Business development /Sales / Project Engineer

2 400 000  in hand

Specializations:
  • Other

Employment type: full time

Work experience 20 years 7 months

January 2017currently
9 years 4 months
Equipment and service supplier companies

Almaty

Business development manager
BD/Project /Sales manager /Head in a various service/equipment supplier companies. Number of world brands distributor - GE Oil&Gas, Nuovo Pignone, Bently Nevada, Suzler, MTU (Rolls-Royce), Shell Lubricants. Serve as primary customer contact, resolve specific and commercial issues, ensure customer satisfaction and on-time delivery according to contract. Overall project owner responsible for multidisciplinary teams including Engineering, Logistics, Finance and Services
October 2008October 2016
8 years 1 month
BG Group plc

Astana

Lead Reservoir Engineer/Production Technologist
 Lead a small team of engineers and Economist and assumed primary responsibility for accuracy and timely delivery of Project presentation materials for Functional and Management Reviews (Decision gates), and any other key meetings  Responsible for delivering technical inputs into Business/Strategy Planning and ensure Projects milestones are properly followed  Reserves: Classification, quarterly update, QA/QC and Submission; SEC and PRMS  Technical studies performed: Gas injection optimization, Sector modelling for water production analysis; identify uncertainty parameters, their ranges and impact on overall recovery  Dynamic reservoir simulation model update and calibration (for a carbonate reservoir with more than 30 years of production history: current well stock of 100+ producers and ~20 active injectors with daily production rate of ~450 kboed)  Integration of Petrel/Eclipse/MEPO: development of workflows for increased efficiency  Occasionally performed as team leader whenever Subsurface Manager is away  Integrated Asset Modeling for production optimisation and monthly medium/long term forecasting  New wells/Projects evaluation, Production optimisation utilising Integrated Network Modelling tools (GAP, Prosper) and Eclipse simulator  Focal point of collaborative, multidisciplinary team (Subsurface, Economics, Commercial) delivering monthly production forecasting to Group  Production Performance Reporting tools implementation, maintenance and upgrade
January 2007January 2008
1 year 1 month
Westminster Caspian LLP

Almaty

Production Engineer
* Well performance analysis to identify production enhancement candidates * Prevention of organic solids deposition in tubing and near-wellbore area
January 2006January 2007
1 year 1 month

Aktau, www.maerskoil.com

Chemical Production, Fertilizers... Show more

Well Site/Petroleum Engineer
 Responsible for Dunga Field Reservoir/Production data management  Monthly Production forecasting, Member of the field development plan team  Evaluating and selecting optimal pump units (SRP, PCP, ESP) for several wells  Coordination and management of site activities and contractors to ensure standby time is minimized, “assistant Company Man”  Cost control: ensure all the rig activities and/or equipment costs are in line with the contracts and within budget, detailed variance analysis, investigation of cost reduction opportunities  Witness rigsite activities such as drilling, casing, cementing, logging, perforation, completion (open/cased hole), multi-stage fracture stimulation. Ensure the drilling program is properly followed  Negotiations with local authorities on various issues
January 2005January 2006
1 year 1 month
Karachaganak Petroleum Operating BV

Aksay (Kazakhstan)

Petroleum Engineer
Petroleum Engineer, Reservoir and Petroleum Engineering Department * Responsible for daily field production optimisation decisions including well line-up to meet production targets * Production allocation for input in to reservoir model ; * Well Test interpretation, Well Flow Regime issues ; * Repeat Formation Tester (MDT, RCI) data QC and analysis. PDMS control * Familiarised with field gathering system (Treatment centres, remote manifolds)
May 2005November 2005
7 months
HALLIBURTON International Inc
Engineer trainee
Production Enhancement and Zonal Isolation Department * Cement job design, planning and execution. Service job for cementing equipment
July 2003July 2003
1 month
Turgai Petroleum

Kyzylorda

Summer intern
Turgai is developing the Kumkol oilfield in Southern Kazakhstan * Summer Intern, Assistant of Field Engineer, Department of Production and Technologies

Skills

Skill proficiency levels
Нефтегаз
Нефтегазовое оборудование
Моделирование
Учет запасов
Прогнозирование
Бурение скважин
Цементирование скважин
Технология разработки месторождений
Добросовестность
Коммуникабельность
Eclipse
Well Engineering
Drilling
Business Planning
MS Excel
Simulation Modeling
Petrel RE
Reserves
Cost Control
MS PowerPoint
Budgeting
Performance Reviews
Analytical skills
Data Analysis
International Logistics
Distribution
Customer Service
Customs Regulations
Грамотность
Project management

Driving experience

Driver's license category B

About me

Reservoir Engineer of the giant pre-salt Karachaganak field. Broad range of reservoir management experience encompassing field production optimisation, reserves booking, development planning field operations. Experience representing BG at industry level, influencing external and internal stakeholders and working in complex JV environments. Demonstrated ability in reservoir management and project management with an aptitude for delivering on time, within budget and with a strong safety focus. Consistent application of technical acumen to deliver and protect business value. Multidisciplinary background leveraged in an ability to communicate effectively with a broad range of professionals in subsurface, surface and management.

Higher education (master)

2005
Higher education (master)
Ecole Nationale Supérieure de Géologie de Nancy (France)
Reservoir engineering and hydrodynamics, Reservoir engineering
2005
Higher education (master)
Нефти и газа, Разработка и эксплуатация нефтяных и газовых месторождений

Languages

Russian — Native

English — C2 — Proficiency

French — C2 — Proficiency

Italian — A1 — Basic

Kazakh — C2 — Proficiency

Citizenship, travel time to work

Citizenship: Kazakhstan

Permission to work: Kazakhstan, Russia

Desired travel time to work: Doesn't matter