Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas more than two weeks ago
Male, 46 years, born on 28 July 1979
Astana, willing to relocate, prepared for business trips
Piping Engineer
Specializations:
- Other
Employment type: full time
Work experience 23 years 5 months
August 2016 — currently
9 years 9 months
Woodgroup - PSN
Senior Piping Designer
Main Fuel Diesel Storage Expansion – Detail Design
GA’s, Isos, Plot Plans, Tie-in schedules, MTO, MRs.
September 2014 — February 2016
1 year 6 months
WorleyParsons Dubai – as PMC for Lukoil Overseas
Lead Piping Engineer
Projects: Booster Pump Station (Pre-FEED), Water, Gas, LPG Pipelines (FEED and EPC ITB), Tuba – Fao Pipeline (FEED ITB)
Engineering support during contract preparation: participation in ITB/SOW development, providing required data for Piping discipline, technical evaluation of bidders offers during tender stage.
Managing of Scope, completeness and correctness of Pre-FEED and FEED piping documentation, more specifically: Checking and Approving of Piping Project Documentation such as: Material Specification, Valves Data Sheets, Wall Thickness Calculations, Material Take-Off, Piping support Specification, Tie-in Schedule etc.; and drawings such as: Plot Plans, Piping General Arrangements for areas: Pig Launcher/Receiver, Valve Stations, Drain Vessel; tie-in isometrics and so on.
October 2012 — September 2014
2 years
GazPromNeft Badra B.V.
Chief Piping Engineer
Infield pipelines, Oil pipeline
Managing of integrity of piping documentation provided by contractor, schedule control.
CPF Phase 1 (oil treatment, stabilization, storage) & CPF Phase 2 (Gas treatment, LPG storage, Gas compression, SRU)
Checking of piping documentation, including specifications and drawings; leading 3D model review (client side), IDC.
Water Treatment Plant FEED stage – Plot Plan, Piping Layout Study, Preliminary MTO.
July 2009 — October 2012
3 years 4 months
Senior Piping Engineer
PSN -Tengiz (rotation 4/4 ww), Kazakhstan
Senior Piping Engineer
Site Survey support for head office
Tie-in locations, tie-in sketches, proposal routings, minimizing quantity of field welds and new supports, sketches for stress review. Ga’s, isos, plot plans, tie-in schedules, MTO, MRs.
Support of TengizChevrOil TA(turn around) design group
Replacement of existing lines, modifications, vessel replacement, installation of new lines etc – engineering and design (Job Packs, Isometrics, Tie-in Schedules, MRs).
February 2009 — July 2009
6 months
Senior Piping Engineer
D304 KTL1.2 Vessel Replacement GTS-144 Fuel Gas Letdown Station
Activities: detailed piping design, supports, site survey etc; provide technical guidance to designers.
January 2008 — September 2008
9 months
WorleyParsons Kazakhstan, Almaty branch
Principal Piping Engineer / Specialist Engineer
KPC (KPO) Secondary Closed Drain System Project – 07.2007 – present.
Activities:
Control and demonstrate progress.
Activities matched with appropriate resources within a given budget.
Represent Piping Engineering in meetings with suppliers, subcontractors, licensors, clients, and other Company disciplines.
Stand in for Chief Piping Engineer.
Other activities (vide infra).
January 2007 — January 2008
1 year 1 month
WorleyParsons Kazakhstan, Almaty branch
Senior Piping Engineer
KPC (KPO-Karachaganak Petroleum Operating) Secondary Closed Drain System Project – 07.2007 – present.
Collection of HC condensate drains from existing equipment to new collection drums by gravity.
Activities:
Developing Project Piping Engineering CTR;
Site Surveys (more than 300 Tie-ins);
Supervision of Piping Design Works;
Client liaison;
Deliverables:
Piping General Arrangement;
Piping Tie-in Isometrics/Isometrics;
Piping Material Take Off;
Piping Tie-in Schedule;
Piping Tie-in plans;
Job Pack;
PKOP Shymkent FCC Cat cracker – 06.2007
Project to determine the integrity of Plant and equipment that forms part of the existing refinery FCCU Complex. Site inspection - possibility of usage of old installed piping (never used before).
Ferrexpo Poltava Expansion Project (Kremenchug). Reconstruction of office Building.
HVAC Scope of Work – 05.2007
Waste Water Solids Removal Project (TCO-TengizChevrOil) phase 4 (detailed design) – 01.2007 – 05.2007
Responsible to issue GA’s, isos, P&ID’s for Review project specifications, administrative and technical practices, design instructions, plot plan, flow diagrams, and supplier information.
Communicate and interface with other project design and engineering disciplines.
Check, back check, and correct manual/computer drawings.
Produce material counts (MTO, MR)
Reviews and approves Area/Unit Piping Engineering design drawings.
May 2006 — December 2006
8 months
Enereco Caspio E&C LLP
Mechanical/Piping Engineer
Detailed design in PDMS Design module (piping&equipment) of EMG
(Egypt Mediterranean Gas) project – gas compressor station. 3D modeling of Piping and Equipment. Creating piping specs (by catview, accordingly to client specification) and components in PDMS Paragon, works in Admin required for creating of new project.
November 2005 — May 2006
7 months
KBR (Kellogg Brown and Root) limited
Piping Designer
Design of U/G pipelines, detailed design of wellheads and manifolds (KPO), piping design of TCO projects – plot plans, GA’s, P&ID’s (accordingly to process sketches), Isos, MTO.
January 2005 — November 2005
11 months
PFD (Parsons Fluor Daniel) International
Technical Supervisor
Supervise of redrafting all SGP&SGI vendor’s p&ids according to
TCO/PFD standards (2000 hours saved, productivity 1.2), drafting of
SGP hydro tests (600 hours saved, 1.3)
Main Accountabilities: man-hour control, liaison with the site on dwg
queries, schedule and productivity monitoring, technical training of
design personnel, ensuring technical integrity of dwgs, client liaison
April 2003 — January 2005
1 year 10 months
PFD (Parsons Fluor Daniel) International
Piping Designer
Responsible for detailed design of LPG bullets (equipment&piping), issuance of isometric drawings (including check, back check). Vendor’s equipment layout and placement in PDS. Issuance of plot plans and GA’s drawings. Issuance of intelligent P&ID diagrams (LPG, Crude, Sulphur forming, CPC areas).
January 2002 — January 2003
1 year 1 month
PFD (Parsons Fluor Daniel) International
Piping Trainee
Getting experience to do detailed design of piping, equipment and drafting IP&IDs according to process sketches.
Skills
Skill proficiency levels
About me
CAD - AutoCAD, MicroStation, PDS Equipment Modeler, PDS Piping Modeler, PDS Schematics Environment, Smart Plant Review, PDMS Design (piping&equipment), PDMS Paragon.
English – upper-intermediate level
Higher education (master)
2001
Higher education (master)
Karaganda State Technical University
Mechanical-Engineering Technology, Mechanical Engineer
Languages
Professional development, courses
2006
PDMS Training
Enereco office, Fano (Italy), 3D Piping design
2002
PDS Schematics Environment Training Course
Fluor, Camberley (UK), Intelligent P&ID producing
2002
PDS Piping & Equipment Training Courses
«Fluor» Company, Camberley (UK), 3D Piping design
2002
MicroStation
«Bentley» Institute, Camberley (UK), CAD software
Citizenship, travel time to work
Citizenship: Kazakhstan
Permission to work: Russia
Desired travel time to work: Doesn't matter