Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Был более двух недель назад

Мужчина, 32 года, родился 4 сентября 1993

Кульсары, готов к переезду, готов к командировкам

Quality Control Inspector(Painting / PFP / Insulation) Quality Control Inspector (Mechanical/Piping)

1 300 000  на руки

Специализации:
  • Другое

Тип занятости: полная занятость

Опыт работы 13 лет 5 месяцев

Июль 2021по настоящее время
4 года 11 месяцев

Атырау, bureauveritas.com.ua

Услуги для бизнеса... Показать еще

Quality Control Inspector (Painting / PFP / Insulation) Quality Control Inspector (Mechanical/Piping) TCO (FGP) Future Growth Project
Working close with manufacturer at site and discussing on critical points. Working and similar with the types of the paint which are classified as Epoxy, Zinc, Polyurethane, Acrylic, Alkyds, Polymers. Performing environmental checklists as per the procedure Daily follow and checking the environmental condition for Coating and insulation activity. Performing pre-blast tests and inspections. Performing checklists during the visual site checks on material stores. Review the coatings documentations. Isometric and drawing review works. Inspections of blasting activities on different type of materials such as carbon, stainless steel, galvanize materials. Weekly audition of coating and insulation materials in stock. Performing of blotter test, dust test, salt test, and profile tests on as per the specification requirements.. Wft, dft readings during the Coating activities. Attendance and inspection of the tests performed on Coating and insulation and PFP as well. Inspection of Adhesion and holiday tests as per the requirement. Inspection of Painted Fabrication materials for replacement of damaged items ; structures & pipe spools, supports. Inspection on Insulation activities on Racks, mainly mineral wool with stainless steel cladding. Inspection of PFP activities; chartek1709. Coatings commissioning works, punch list works of a Racks. Conducting materials tracibilities (pipes, fittings and structural parts etc.) Inspection of weld joints, installation of underground flowline & gasline pipelines from Well site up to MS Inspection of pipeline repairs Internal & external inspection of Equipment (vessel, tank, pump, boiler, heat exchanger etc.) Preparing of Welding Procedure Specification and PQR Participating with NDE staffs on testing of weld joints by UT,RT,MT,PT,HT method Inspection of valves (gate valve, ball valve, orbit valve,globe valve, check valve, DB&B valve,modular valve,PSV valve etc.) Inspection of Steam trap, Strainer Preparation of all necessary documentation for hydrotest, leak test, pneumatic test, service test etc. Conducting and monitoring of hydrotest, leak test, pneumatic test, service test etc. Working with Mech/Piping P & ID drawings. Conducting Construction PSSR,SID walkdown Preparation of work packages to the final Acceptance Commission
Март 2019Июль 2021
2 года 5 месяцев
Denholm-Zholdas LLP

Атырау

Denholm-Zholdas LLP QA/QC Coating and Insulation Inspector Mechanical/Piping/Equipment Inspector TCO (FGP) Future Growth Project
Following and Good understanding of the TCO procedure and ITP’s Able to work with paint companies: International/PPG/ Jotun Isometric and drawing review works for coating, PFP and insulation activities Shop responsible for coming and outgoing fabrication materials related coatings Environmental checks every day for coating and insulations activity Checking the Documentation on ongoing coating activities for review Inspections of the Blasting activities on different type of materials such as carbon, stainless steel, galvanize materials Replacing of the damaged coating in KTL on running systems Performing of the Blotter test, dust test, salt test and profile tests WFT, DFT readings during the Coating activities Preparation of checklists for finalized jobs Providing requests for inspection of the completed jobs to TCO inspectors. Site supervision and visual checks of the coating materials in container stores. Job Pack works on coatings and insulation by the TCO instruction Visual Inspection welding joints of Piping vessels,tanks,structural(including hot tap, golden welds) Conducting materials tracibilities (pipes, fittings and structural parts etc.) Inspection of weld joints, installation of underground flowline & gasline pipelines from Well site up to MS Inspection of pipeline repairs Internal & external inspection of Equipment (vessel, tank, pump, boiler, heat exchanger etc.) Preparing of Welding Procedure Specification and PQR Participating with NDE staffs on testing of weld joints by UT,RT,MT,PT,HT method Inspection of valves (gate valve, ball valve, orbit valve,globe valve, check valve, DB&B valve,modular valve,PSV valve etc.) Inspection of Steam trap, Strainer Preparation of all necessary documentation for hydrotest, leak test, pneumatic test, service test etc. Conducting and monitoring of hydrotest, leak test, pneumatic test, service test etc. Working with Mech/Piping P & ID drawings. Conducting Construction PSSR,SID walkdown Preparation of work packages to the final Acceptance Commission
Июнь 2014Ноябрь 2019
5 лет 6 месяцев
Senimdi Kurylys LLP QA/QC Department

Атырау

2017-2019 Quality Control Inspector (Coating / Painting / PFP / Insulation) 2016-2017 Mechanical/Piping/Equipment Inspector 2014-2015 Completion Turnover specialist TCO OM Pipeline (Liquid field of epoxy), KTL, Second Generation Project (SGP), Water Handing Upgrade (WHU), Water Recycling Facility (WRF) Project
T-5840 to MS-5 8” Flow Line and 2” Fuel Gas Line T-5634 to MS-33 8” Flow Line and 2” Fuel Gas Line T-5059 to MS-21 6” Flow Line T-7543 to MS-26 6” Flow Line T-17 to MS-21 6” Flow Line repair Turnaround 2015 – KTL Plant – Tengiz Turnaround 2016 – SGP Plant – Tengiz Daily follow and checking the environmental condition for Coating and insulation activity To follow specification anti carry out inspection on a timely basis Monitoring mixing of paints PQT of coating and insulation materials delivered by sub-contractor MSDS inspection of the materials on coatings and insulations Maintaining batch certificates for incoming materials for painting Checking the calibration dates of the tools and equipment in use Following the acts of completed coatings and insulation works for checklist completions Providing of coating and insulation tests on gas pipe lines. (salt tests, dust test, blotter tests on compressed air, profile test, pull of test, peel test, holiday tests) Preparing stage wise reports DFT reading during the paint and after dry condition inspection and checking the areas where the welding joints going to be coated and insulated Industrial protective coatings and fire protection Inspection of the repair works on gas pipe lines Quality control procedures Self involved to backfilling process after Holiday test and Peel test inspection been completed Preparation of Final Painting Reports for test pack Visual Inspection welding joints of Piping vessels,tanks,structural(including hot tap, golden welds) Conducting materials tracibilities (pipes, fittings and structural parts etc.) Inspection of weld joints, installation of underground flowline & gasline pipelines from Well site up to MS Inspection of pipeline repairs Internal & external inspection of Equipment (vessel, tank, pump, boiler, heat exchanger etc.) Preparing of Welding Procedure Specification and PQR Participating with NDE staffs on testing of weld joints by UT,RT,MT,PT,HT method Inspection of valves (gate valve, ball valve, orbit valve,globe valve, check valve, DB&B valve,modular valve,PSV valve etc.) Inspection of Steam trap, Strainer Preparation of all necessary documentation for hydrotest, leak test, pneumatic test, service test etc. Conducting and monitoring of hydrotest, leak test, pneumatic test, service test etc. Working with Mech/Piping P & ID drawings. Conducting Construction PSSR,SID walkdown Preparation of work packages to the final Acceptance Commission
Январь 2013Май 2014
1 год 5 месяцев
ТОО “Multicorr"

Атырау

MultiCorr LLP Sandblaster-painter and PFP worker EFP (external factory park) PFP Works Country: Kazakhstan - Atyrau (Tengiz)
Ambient conditions No final preparation carried out when Relative humidity is above 85% Temperature of the steel surface is less than 3C above the dew point Wind is raising dust(unless work is being carried out under cover) During rain (unless work is being carried out under cover) Coating is unlikely to take place within 4 hours Surface preparation Surface cleaning is defined as the additional process necessary to remove salts or other forms of contamination, such as dust and grease, before abrasive blast cleaning Detergent or solvent cleaning shall be performed as outlined in SSPC SP 1 When accepted, hand tool cleaning or power tool cleaning shall be per SSPC SP 2, SSPC SP 3, and SSPC SP Coating Application Application shall be in accordance with SSPC PA1, the coating manufacturer’s published application instructions, material safety data sheet (MSDS), and the requirements specified herein Application equipment shall be as recommended by the coating manufacturer, shall be clean and in good condition, and shall be suitable for applying the coating as specified Wet film thicknesses shall be verified at the start of work (until the painter is familiar with the paint and work) with a wet film thickness gauge Thickness requirements shall be met with each coat and total thickness shall not be ‘made-up’ in any one coat.

Навыки

Уровни владения навыками
Целеустремленный, коммуникабельный, трудолюбивый, требовательный к себе и окружающим, аккуратный,

Опыт вождения

Права категории B, C

Обо мне

Проходил англ курс в Малайзии

Неоконченное высшее образование

2019
Неоконченное высшее образование
Kazakhstan Institute of Information Technologies and Management Uralsk - Kazakhstan. Construction
2012
Неоконченное высшее образование
Aktobe Polytechnic College(APK). Aktobe - Kazakhstan. Oil and gas processing

Знание языков

Казахский — Родной

Английский — C1 — Продвинутый

Русский — C2 — В совершенстве

Турецкий — B1 — Средний

Повышение квалификации, курсы

2032
Лазерной центровки валов Fixturlaser и основам промышленного обарудования
Baltech
2020
Сварщик
APEC Petrotechnic
2013
Актюбинский политехнический колледж(АПК)
АПК, 1. «Оператор технологических установок» 3 разряда Operator of technical installation - grade 3
2013
Актюбинский политехнический колледж(АПК)
АПК, 2. «Оператор нефтеперекачивающих станции» 3 разряда Operator of oil-transfer pump station - grade 3
2013
Актюбинский политехнический колледж(АПК)
АПК, 3.Сертификат «Правила техники безопасности при работе с сероводородом в нефтегазовой отрасли»
2013
Актюбинский политехнический колледж(АПК)
АПК, 4.Лаборант химического анализа» 3 разряда Chemical analysis Laboratory assistant - grade 3
2013
Актюбинский политехнический колледж(АПК)
АПК, Диплом техник-технолог Diploma Technician - technologist

Гражданство, время в пути до работы

Гражданство: Казахстан

Разрешение на работу: Казахстан

Желательное время в пути до работы: Не имеет значения