Male, 36 years, born on 25 October 1989
Atyrau, willing to relocate (Azerbaijan, Belarus, Georgia, Other regions, Kazakhstan, Kyrgyzstan, Russia, Uzbekistan, Ukraine), prepared for business trips
Construction Superintendent,Manager
7 500 $ in hand
Specializations:
- Other
Employment type: full time, project work/one-time assignment
Work experience 10 years 8 months
April 2024 — December 2025
1 year 9 months
Carlo Gavazzi Arabia Co Ltd
Construction Manager
Saudi Aramco - Berri Oil Field Expansion Project (BF)
(Saudi Arabia)
Scope of work: Installation 4302 Tons of steel structures (Pipe racks, platforms), Equipment installation
2985 Tons, 143000 DI Piping, Tie-ins, Welding, Hydro testing and Reinstatement
As a Construction Manager:
- Managed the installation of 4302 tons of steel structures (pipe racks), 2985 tons of equipment and process piping.
- Managed pipe welding, erection, hydro testing and reinstatement processes.
- Managed material logistics and optimized equipment and manpower planning.
- Ensured adherence to quality and HSE standards through regular inspections and audits.
- Provided detailed progress reports and led a diverse team, enhanced project outcomes.
October 2022 — March 2024
1 year 6 months
RA International
Construction Superintendent
Newmont Suriname LLC. - MVIP Project
(Suriname -South America)
Scope of work: EPC Contractor of 2600 tons steel structure and 35 pieces (53000 m2) modular buildings.
As a Construction Superintendent:
- Civil/Earthworks: Infrastructure (underground piping; Sewage line, potable waterline, fire waterline) trenching,
excavation, crossing, backfilling, compaction, foundation and paving works.
- Structural works: Assembled and erected steel structure buildings including secondary roofing and rain gutters.
- Mechanical works: Internal/external piping such as HDPE, PPR fusion welding and UPVC (potable and sewage
lines) installation including sanitary fittings and water heaters. Testing pipelines (pressure and leak test)
- Architectural works: Laminate flooring, Vinyl flooring, plinths, sealant, door/windows adjustments, painting and
furniture & stair platform assembly and installation
June 2021 — August 2022
1 year 3 months
GATE CONSTRUCTION
Construction Manager
Tengizchevroil (TCO) - Pipelines Project (Brown Field)
(Tengiz-Kazakhstan)
Scope of work: 11 pipelines; 5 of them (14") associated with the High-Pressure High Temperature gas injection
system (HPHT) and 6 of them (18", 24" and 26") Conventional pipelines, 93 pieces Expansion Loop Box for
HPHT pipelines and 20 pieces Anchor Block construction works for the Pipeline Project.
As a Construction Manager:
- Managed the dewatering, stringing, welding & NDT, coating, trenching, lowering & survey, cathodic protection,
backfilling, reinstatement works along the pipeline.
- Managed expansion loop boxes and anchor blocks construction works.
- Managed crossings (Road, trenchless, Open-Cut Shut Down etc.) execution.
- Prepared 3WLA & 12WLA plans and following the execution of plans.
- Managed multiple subcontractors in a formal process. Ensure pre-construction, construction and post
construction planning and implementation are adhered to.
- Liaised with clients and subcontractors.
October 2018 — June 2021
2 years 9 months
GATE CONSTRUCTION
CSA (Civil-Structural & Architectural) Construction Manager
Tengizchevroil (TCO)- SF Project
(Tengiz-Kazakhstan)
Scope of work: EPC Contractor of 5390 Ton steel structures and modular facilities (103000 m2).
As a Civil-Structural & Architectural Manager:
- Managed the installation of 5390 tons of steel structures CSA (Civil-Structural & Architectural) construction
works, this included material, manpower planning, installation, inspection, testing, documentation, interacting
with client representatives and other discipline contractors.
- Revised the drawings and implemented red line markups (RLMU).
- Reviewed and followed up QVDs, ITPs, NFIs and other QC/RA documents.
- Managed multiple subcontractors in a formal process. Ensured pre-construction, construction and post
construction planning and implementation are adhered to.
- Liaised with clients and subcontractors.
February 2017 — September 2018
1 year 8 months
Treysan Prefabricated Steel Construction Industry & Trade Corp.
Construction Project Engineer
TengizChevroil (TCO) - TCF Project
(Tengiz-Kazakhstan)
Scope of work: EPC Contractor of 2200tons of steel structure facilities
As a Construction Project Engineer:
- Executed of Civil, Infrastructural, Structural, Architectural, Electrical & Mechanical construction works.
- Developed method statements, JSAs, construction specifications and procedures.
- Assisted in material management (Field Material Request, MTOs, BOMs preparation).
- Revised the drawings and implemented red line markups (RLMU)
- Attended walk-downs for inspections of installed commodities to assure conformance with specifications and design.
July 2016 — February 2017
8 months
ONUR Taahhüt Taşımacılık İnşaat Ticaret ve Sanayi A.Ş.
Construction Project Engineer
Istanbul-Izmir Motorway Project
Construction Project Engineer
Scope of work: Construction of 36 km motorway
As a construction project engineer:
- Executed of infrastructure & civil construction activities (excavation-backfilling & compaction, retaining walls,
crossings, overpass, underpass).
- Prepared daily reports (productions and progress reports) and assist in material management (MTOs, BOMs)
March 2014 — May 2015
1 year 3 months
Bereket Enerji Üretim A.Ş.
Construction Field Engineer
GOKTAS-1 Hydroelectric Power Plant Project -EPCC Contract
Construction Field Engineer
Scope of work: Construction of 132 MW Hydroelectric Power Plant
As a construction field engineer:
- Executed of utilized RCC (Roller Compacted Concrete) method for creation of main body.
- Executed of spillway, drain structure, injection structure and transportation structure.
- Performed walk-downs and inspections of installed commodities to assure conformance with specifications and design.
Skills
Skill proficiency levels
Advanced level
Driving experience
Own car
Driver's license category BAbout me
With over 10 years of experience in Oil & Gas industry, I am a Construction Manager (OSHA certified, 48 hrs) with
proven expertise in Steel Structure, Process Piping, CSA (Civil, Structural, Architectural) construction management,
overseeing all aspects of construction projects to ensure compliance with design specifications, quality standards,
and Health, Environment, and Safety (HES) regulations with skills of:
• Proactive team player in combination with excellent interpersonal and communication.
• Strong analytical and problem-solving.
• Excellent time management and ability to meet tight deadlines
Higher education (bachelor)
2014
Higher education (bachelor)
Cukurova University
Construction Engineer, Structural & Mechanical Construction
Languages
Tests, examinations
2018
FGP/WPMP Workface Planning Implementation WFP 300 Overview Material Management: English
KPJV Limited, Planning
2018
FGP/WPMP Workface Planning Implementation WFP 301 CWP/IWP Scoping: English
KPJV Limited, Planning
2018
FGP/WPMP Workface Planning Implementation WFP 202 WFP Life Cycle: English
KPJV Limited, Planning
2018
FGP/WPMP Workface Planning Implementation WFP 101 Fundamentals: English
KPJV Limited, Planning
2018
FGP/WPMP Workface Planning Implementation WFP 305 IWP Close Out: English
KPJV Limited, Planning
2018
FGP/WPMP Workface Planning Implementation WFP 304 Short Range Planning: English
KPJV Limited, Planning
2018
FGP/WPMP Workface Planning Implementation WFP 302 IWP Development: English
KPJV Limited, Planning
Citizenship, travel time to work
Citizenship: Turkey
Permission to work: Belarus, Kazakhstan, Kyrgyzstan, Russia, Tajikistan, Turkmenistan, Ukraine, Uzbekistan
Desired travel time to work: Doesn't matter