Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Был более двух недель назад

Мужчина, 39 лет, родился 9 мая 1986

Астана, хочу переехать, готов к командировкам

Principle Piping Engineer

Специализации:
  • Другое

Тип занятости: полная занятость

Опыт работы 16 лет 10 месяцев

Август 2019по настоящее время
6 лет 9 месяцев

Москва, www.lukoil.ru/

Нефть и газ... Показать еще

Старший Инженер по трубопроводным сетям
Проверка чертежей и документации.
Ноябрь 2013Август 2019
5 лет 10 месяцев
Wood Group

Атырау, Www.woodgroup.com

Нефть и газ... Показать еще

Principle Piping Engineer
Client-Tengizchevroil (international company) Principal Piping Engineer Man Power Planning & Schedule the work, Manage a team of piping engineers, Plot plan review and constructability review. Attend progress review meetings and Inter disciplinary coordination. Response for design related to piping systems of Tengiz field including Job Pack preparation, Site Query, Technical Query. Develop plot plan, general arrangement. Estimate of men/hours, review vendor drawings; review drawings/data sheets of over discipline (civil, instrument, mechanical); check drawings (plot plan, general arrangement, isometric, MTO, material requisition). Perform quality check for all drawings before issue. Projects: • SGP F-340D Sour Gas Coalescing Filter: Tengizchevroil, a joint venture company between Chevron, Exxon-Mobile, LUKoil, and Kazakhstan Government, intends to install a new F-340D Sour Gas Coalescing Filter located at the Second Generation Plant (Tengiz). • Second Generation Plant Low Pressure Flare Header Upgrade: Developing Job Pack for new LP Flare Header 30”-36” with alloy cladding. • Over 50 Job Packs (piping) for Turnaround 2018 & 2019 (modification of existing piping and replacing LTCS pipe with alloy material).
Январь 2016Ноябрь 2017
1 год 11 месяцев
Production Services Network (PSN Wood Group)

Атырау

Нефть и газ... Показать еще

Senior Piping Engineer
January 2016 - November 2017 Production Services Network (PSN Wood Group) Client-Tengizchevroil (international company) Senior Piping Engineer Plot plan review and constructability review. Attend progress review meetings and Inter disciplinary coordination. Response for design related to piping systems of Tengiz field including Job Pack preparation; piping general arrangement, detail drawings. Site customer query; weekly progress status preparation. Develop plot plan, general arrangement. Site survey: identify tie-in point of new lines according to P&ID; select optimal routing of new lines. Estimate of men/hours; create drawing register, review vendor drawings; review drawings/data sheets of over discipline (civil, instrument, mechanical); check drawings (plot plan, general arrangement, isometric, MTO, material requisition). Perform quality check for all drawings before issue. Projects: • Main diesel fuel storage expansion project: Tengizchevroil, a joint venture company between Chevron, Exxon-Mobile, LUKoil, and Kazakhstan government, intend to upgrade TCO Fuel Storage located at the Tengiz Drilling Base. • Over 30 Job Packs (piping) for Turnaround (modification of existing piping). • Engineering support during Turnaround 2016 at the Second Generation Plant (Tengiz).
Январь 2014Январь 2016
2 года 1 месяц
Production Services Network (PSN Wood Group)

Атырау

Piping Engineer
January 2014- January 2016 Production Services Network (PSN Wood Group) Client-Tengizchevroil (international company) Piping Engineer Response for design related to piping systems of Tengiz field including Job Pack preparation; piping general arrangement, detail drawings. Site survey; identify tie-in point of new lines according to P&ID; select optimal routing of new lines. Site customer query; weekly progress status preparation, review vendor drawings; review drawings/data sheets of over discipline (civil, instrument, mechanical); check drawings (plot plan, general arrangement, isometrics, MTO, material requisition). Perform quality check for all drawings before issue. Projects: • Critical Tank Sparing project. Installation of new tank and design relevant piping. (Install of two new tanks, drain vessel, flare stack). • D-502 replacement (install new column) MS-27/32/33/35 Piping modification (modification of drain line on metering stations). • Installation of new Sultraps and sulphur lines. • Over 50 Job Packs (piping) for Turnaround (modification of existing piping).
Июль 2013Январь 2014
7 месяцев
Production Services Network (PSN Wood Group)

Атырау

Senior Piping Designer
July 2013- January 2014 Production Services Network (PSN Wood Group) Client-Tengizchevroil (international company) Senior Piping Designer Leading with Designers for design part co-ordination as well as vendor drawing comments. Response for design related to piping systems of Tengiz field including; piping general arrangement, detail drawings preparation. Site customer query; weekly progress status preparation. Develop plot plan, general arrangement. Site survey: Identify tie-in point of new lines according to P&ID; select optimal routing of new piping.
Декабрь 2012Июль 2013
8 месяцев
Kellogg Brown and Root International Inc Client-Agip KCO

Атырау

Piping Engineer
December 2012- July 2013 Kellogg Brown and Root International Inc Client-Agip KCO (International company) Piping Engineer (Offshore D-Island north Caspian Sea) Contribute the timely completion of work in accordance with the work documentation Issue of Technical/Site Queries when required, prepared new design solutions for construction group, participate in meetings. Identify problems and propose solutions, maintain relationship with client Agip KCO. Provided technical direction and guidance to construction staff. Preparation of RLMU drawings for piping and mechanical equipment installation and hook-up drawings including P&IDs, equipment location plans and piping layouts and equipment lists. Perform quality check for all drawings before issue. Interface/endorsement with Engineering groups in Stavanger and Atyrau, QA/QC, Structural, Electrical groups. Collected and analyzed information to resolve discrepancies. Ensure that all aspects of the project design comply with standards ASME, ASTM, NACE and SNiP, GOST, VSN legal acts, safety and client requirements and procedures. Perform “As-Built” of installed piping systems according to procedures.
Март 2011Декабрь 2011
10 месяцев
Kellogg Brown and Root International Inc Client-Agip KCO (International company)

Атырау

Piping Design Coordinator
March 2011- December 2012 Kellogg Brown and Root International Inc Client-Agip KCO (International company) Piping Design Coordinator (Offshore D-Island north Caspian Sea) My tasks included assisting with TQ (Technical Query), DCN (Design Change Notice), PCN (Process Change Notice) and SQ (Site Queries). Support for completion of conceptual designs and detailed design of two offshore reservoir hubs located in the north Caspian Sea, fixed Platform topside solutions, artificial islands D and A. The two reservoir blocks has a combined capacity of 450,000 BOPD and 1,200 MMSCFD of gas.
Сентябрь 2010Сентябрь 2011
1 год 1 месяц
Bonatti S.p.A Engineering, Aksai Client-Karachaganak Petroleum Operating b.v

Атырау

Mechanical Engineer
September 2010 to 2011 Bonatti S.p.A Engineering, Aksai Client-Karachaganak Petroleum Operating b.v Mechanical Engineer For phase 2 (KPC/Unit 2 Field Well Heads) Facilities. On-site Engineer (Contribute with the Construction, Operations groups to finding technical solutions, solve problems rising on site) and other. Coordinate engineering and construction requirements. Contribute the timely completion of work in accordance with the work documentation Issue of Technical/Site Queries when required reviewing the Materials conformance to ASME, ASTM, ANSI, API and NACE and Republic of Kazakhstan standards. Preparation of ‘red line mark ups’ drawings for piping and mechanical equipment installation and hook-up drawings including P&IDs, equipment location plans and piping layouts and equipment lists. Preparation of documentation for Mechanical Completion Packages, preparation of AS-BUILT drawings, preparation of documentation for issuance of Engineering Queries, Site Queries, Provide close interface with other engineering disciplines and non-engineering disciplines and etc. Preparation of documentation (Working Packages) required for site activities – drawings, site sketches, procedures.
Июнь 2009Июнь 2010
1 год 1 месяц
Bonatti S.p.A Construction, Aksai Client-Karachaganak Petroleum Operating b.v

Атырау

Piping Supervisor
2009 to 2010 Bonatti S.p.A Construction, Aksai Client-Karachaganak Petroleum Operating b.v Piping Supervisor Work undertaken on the Onshore KPC Plant, Karachaganak, The Republic of Kazakhstan (Unit 2, 3, 4 and Well Heads Area.) Prepare daily reports of work progress and man power utilization. Project included: • Prepare weekly reports of the total spool erection, isometric weight installed, welded dia. inches of supports and joints and the remaining work front with the materials available. • Co-ordinate with the sub-contractors to achieve the targets and schedule set by the planning. • Issue the work permits ensuring SHE requirements. • Conduct safety walk through in the site in co-ordination with the safety department on weekly basis. • Supervision of all piping works and ensures safety and quality standards of the client. • Hydrotest, cleaning, drying, commissioning of pipelines sections.
Июнь 2008Июнь 2009
1 год 1 месяц
Bonatti S.pA – Construction, Aksay Client-Karachaganak Petroleum Operating b.v

Уральск

Assistant of Piping еngineer
2008 to 2009 Bonatti S.pA – Construction, Aksai Client-Karachaganak Petroleum Operating b.v Assistant of Piping еngineer Work undertaken in the workshop, provide guidelines for fabrication of pipe works ensuring full compliance with safety and quality standards and procedures.

Навыки

Уровни владения навыками
2012 Basic Offshore Safety Induction and Emergency Training (BOSIET) OPITO Course Code 5700 Certifi

Опыт вождения

Имеется собственный автомобиль

Права категории B

Обо мне

Qualified professional with over 9 years’ experience in developing piping engineering and site supports activities in the oil/gas industry; refinery plant piping; onshore and offshore pipe lines; field piping. EPC design environment with multinational working environments, operating facilities and on construction sites for onshore and offshore facilities within design offices. Prepare proposals for project development, Job Pack development, working with vendors, procurement and etc Responsibilities and positions include Mechanical Engineer Piping Supervisor and Piping Designer. Also has extensive computer related experience. Proficient in the use of: AutoCAD, CADWorx 3D, Microstation SE, Microsoft Windows and NT,Microsoft Office, and many other software programs. Team player with excellent organization, presentation, communication, and leadership skills.

Высшее образование

2013
Высшее образование
West Kazakhstan Technical Engineering University
Techniques and Technology (Oil & Gas business)
2007
Высшее образование
West Kazakhstan University of Economy
Management/Economist Honours

Знание языков

Казахский — Родной

Английский — C2 — В совершенстве

Повышение квалификации, курсы

2008
A degree( intensive course on improving English)
London EF International School of English UK, United Kingdom,

Гражданство, время в пути до работы

Гражданство: Казахстан

Разрешение на работу: Казахстан

Желательное время в пути до работы: Не имеет значения