Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Был более двух недель назад

Мужчина, 37 лет, родился 6 января 1989

Атырау, готов к переезду, готов к командировкам

QC E&I 'IECEX/CompEx' Engineer

1 400 000  на руки

Специализации:
  • Другое

Тип занятости: полная занятость, проектная работа/разовое задание

Опыт работы 14 лет

Январь 2025по настоящее время
1 год 5 месяцев

Казахстан

Услуги для бизнеса... Показать еще

QA/QC E&I EX Engineer
QA/QC E&I EX Engineer
Июль 2023по настоящее время
2 года 11 месяцев
Extec - Index Middle East FZE

Турция

ATEX Specialist and Consultant
SAKARYA GAS FIELD DEVELOPMENT PROJECT- Third Party Inspector carrying out IECEx vendor package inspections to ensure that materials supplied are fully in accordance with the technical and commercial requirements of the Customer's purchase order. Ensuring IECEx/ATEX certified equipment installed is in adherence to the latest editions of IEC standards and local project specifications. Liaising with vendor management to ensure all project documentation is of the latest approved edition and to give guidance on installation correctives required to be completed prior to package shipment to client. Latest project as a TPI representing Turkish Petroleum Offshore for a major FPSO construction project – carrying out QC Surveillance and Auditing, IECEx vendor package inspections and Electrical Factory Acceptance Tests.
Июнь 2019Июль 2023
4 года 2 месяца
"Tengizchevroil" FGP GS

Атырау

QC EX Lead
Knowledge with all relevant TCO specifications, local requirements, such as PUE RoK and international IEC standards (60079-0) and EU ATEX. NEMA VE / IEEE / ISA RP / ANSI MC96.1 / IEC 60529 Organization that all company and contractor personnel associated to Ex equipment management activities are competent as per the project Ex Competency Plan. EX inspection and preservation issues. Evaluate Change Notice Requests (CN’s) issued by the Contractor. Approve and endorse or reject accordingly. Liaise with Central Ex Compliance Lead and Ex QC Lead on all matters related to Ex Database program. Monitor all aspects of CompEx inspections during the construction phase, to ensure adherence to the company technical equirements and applicable codes. Engage with Systems Completion to ensure data interface between MCPlus and Ex Register Database, and allocation to QVDs and tagged equipment is accurate and managed. Fully support and participate in all Injury and Incident Free (IIF) initiatives through reaching out and communicating with Contractors Staff and trades personnel. Review and approve contractor quality programs and inspection and test plans submitted per contract requirements, identify appropriate hold or witness points on inspection and test plans. Monitor all aspects of Quality Control relative to specialization during the construction phase, to ensure adherence to the company technical requirements and applicable codes including SID (Safety in Design). Observe for unsafe acts, correctly use V&V and Safe card. Plan and organize own work assignments, as well as carry out tasks from management staff Adhere to and support TCO Health Safety & Environmental and Sustainability Policies. Perform any other duties as assigned.
Июнь 2018Июнь 2019
1 год 1 месяц
Oil tech Kazakhstan
QA/QC Inspector E&I & Cathodic protection
Cathodic protection Survey and Troubleshooting. Pipeline coating integrity survey by DCVG /CIPS method. Potential Measurement "On and Off". Soil resistivity measurements. Monitoring and maintenance. Report preparation, writing and including work close out reports
Февраль 2018Сентябрь 2018
8 месяцев
BI Group KAZPACO
E&I Supervisor
Project BMEI " PRORVA "
Июнь 2017Февраль 2018
9 месяцев
TOO "SICIM"
QA/QC E&I Inspector
Worked as Electrical & Instrumentation Quality Control Inspector on the Tengiz CATRO Project - Controlling contractor procedures, inspection and test plans and other technical and quality documents, to ensure effective controls... -Coordination with client for technical query and other activities related to on going construction. - Incoming Inspection of the material dept to ensure that materials have all needed documentation before start of work - Performing inspection for all E&I equipment’s installations, hookup, loop checking and functional testing are in compliance with the technical requirement according to the project specification. - Inspection of cable trench, cable installation including cable trays, cable glands, termination, insulation resistance, continuity testing etc. - Witnessing all tests including verification and calibration of instruments and safety devices - Inspection of Fiber optic cable installation - Inspection of High voltage system up to 10KV, Diesel generator, power transformer, Switchboard & HVAC Panel, Lighting and Earthing system - Performing inspection for all E&I equipment’s installations,are in compliance with the technical requirement according to the project specification. - Closing check list and Acts. - Generating, reviewing and approving Electrical & Instrument QVD Matrix.. - Quality control of all E&I pre-commissioning works - Red Line Mark Up on drawings for E&I and Telecom Disciplines..
Октябрь 2014Июль 2017
2 года 10 месяцев
ТОО "Senimdi Kurylys",
Инженер контроль качества
Electrical engineer quality control department. TOO "Senimdi Kurylys", rotational village Tengiz Zhylyoi Atyrau. Work on the contract with the company "Tengizchevroil" LLP. 1. Preparation of the list of electrical, instrumentation, fire and gas, and fiber-optic test equipment. 2. Preparation of official documents "Senimdi Kurylys" on electrical and instrumentation works according to the requirements of Kazakhstan. 3. Check drawings in the work package TCO ("Tengizchevroil" LLP) for compliance with the requirements of the project. 4. check project materials issued by TCO, according to the requirements of the project and preparation of the necessary Acts and control statements according to the matrix in the work package. 5.Testing all cables on cable drums according to the requirements of the project and preparation of the necessary Acts and checklist before using the data cable on the jobsite. 6. Tests required componentspower switchboards, transformers, equipment of low / medium / high voltage electric motors, lighting equipment, fire and gas detectors / alarms / alarm / panels, fiber optic panels, panels of cathodic protection before using them for the work site. 7. Fulfillment commissioning of electrical systems of low / medium / high voltage systems, instrumentation, fire and gas systems, fiber-optic system. Работа по контрактам с компанией ТОО "ТенгизШеврОйл". 1.Подготовка перечня электрической, КИП, пожарной и газовой и волоконно-оптической испытательной аппаратуры. 2.Подготовка официальных документов "Senimdi Kurylys" по электрическим и КИП работам согласно требованиям РК. 3.Проверка чертежей в рабочем пакете ТШО (ТОО "ТенгизШеврОйл") на соответствие требованиям проекта. 4.Проверка проектных материалов, выданных ТШО, согласно требованиям проекта и подготовка необходимых Актов и контрольных ведомостей согласно матрице в рабочем пакете. 5.Испытание всех кабелей на кабельных барабанах согласно требованиям проекта и подготовка необходимых Актов и контрольных ведомостей, прежде чем использовать данные кабели на рабочей площадке. 6.Испытание необходимых компонентов распределительных щитов электропитания, трансформаторов, оборудования низкого/ среднего/ высокого напряжения, электродвигателей, осветительного оборудования, пожарных и газовых детекторов/ оповещателей/ сигнализации/ панелей, волоконно-оптических панелей, панелей катодной защиты, прежде чем использовать их на рабочей площадке. 7.Выполнение пусконаладочных работ электрических систем низкого/ среднего/ высокого напряжения, систем КИП, пожарной и газовой системы, волоконно-оптической системы.
Июнь 2012Август 2013
1 год 3 месяца
Тоо «Kazmunaiservices»

Атырау

QA/QC E&I
Too «Kazmunaiservices» 2012-2013 project Kashagan «D» Island ability to work on diagram "Location, single line diagrams, Wire connections (control panel , Electric switchgear panels) Check the loop circuits equipment (cold continuity),process flow diagram (PID), isometric drawing Working with device: Fluke (insulation resistance tester) Megger (Megger) DRUCK device test air supply line, DET2 / 2 Earth Ground Testers Умение работат по схемам «Расположение,однолинейным схемам, схемам расключение(ШкафовКИПиА, Распред коробок, Эл распред панелей,) Проверка петельных схем КИПиА(холодная прозвонка),Технологич еских схем(PID), изометрическая схема Работа с прибороми: Fluke(тестеры сопротивление изоляции) Megger (Мегаомметр) DRUCK прибор тестирования Линии подачи воздуха, DET2/2 измеритель сопротивления заземление, Погрузочник
Апрель 2010Апрель 2011
1 год 1 месяц
Тоо «КентекКазахстанТехникалСервис»

Атырау, www.kentech.ie

Техник-электрик Electrical Technician
Too "KentechKazahstanTehnicalServis" Electrical Technician Kashagan «D» Island 2010-2011 Setting various fire detectors, pressure sensor, level transmitter, pressure switch, magnetic, flow meters, Wire connections cables to the device.Anod-Cathodic Protection (ECP) Cable pulling and ping cable, Wire connections JB and control cabinets, installation of heat tracing and testing, commissioning, Установка разных противопожарных датчиков,датчик давления, Уровнометр,Реле давления, магнитные, Расходомер, глендовка расключение кабелей на приборах.Анод-катодные защиты(ЭХЗ) Протяжка и прозвонка кабелей, глендовка и расключение JB, шкаф управлений,монтаж и проверка теплоспутника, пуско-наладочные работы

Навыки

Уровни владения навыками
Контроль качества
Пользователь ПК
Пуско-наладочные работы
MS Outlook
Работа в команде
Управление проектами
Ведение переговоров
Английский язык
Internet
Управление персоналом

Опыт вождения

Права категории B, C

Обо мне

Большой опыт работы в различных областях службы электроснабжения. Высокая квалификация Целеустремлённость, настойчивость в выполнении поставленных задач. Открытость к восприятию новой информации. Общительность. Музыка

Портфолио

Высшее образование (Бакалавр)

2013
Высшее образование (Бакалавр)
политехнический, телекоммуникация и радиотехника электроника
2010
Высшее образование (Бакалавр)
West Kazakhstan Agrarian Technical University named after Zhangir KhanЗападно-Казахстанский аграрно-технический университет имени Жангир хана, Уральск
политехнический Higher., электроэнергетика Electric power

Знание языков

Казахский — Родной

Английский — B2 — Средне-продвинутый

Турецкий — B1 — Средний

Гражданство, время в пути до работы

Гражданство: Казахстан

Разрешение на работу: Казахстан

Желательное время в пути до работы: Не имеет значения