Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Был неделю назад

Мужчина, 43 года, родился 4 мая 1982

Костанай, не готов к переезду, готов к командировкам

Mechanical & Piping Engineer; Superintendent; Supervisor.

Специализации:
  • Другое

Тип занятости: полная занятость

Опыт работы 20 лет 10 месяцев

Октябрь 2025по настоящее время
8 месяцев
"Sicim" S.P.A. Kazakhstan branch;Offshore Kashagan (customer North Caspian Operating Company)
WPP Engineer/ Turnaround Mechanical Lead
- Participation in data collection and work packages preparation, with a description of the task, materials, human resources and deadlines; - Inspection, monitoring and ensure that all mechanicals engineering and piping related maitanance activities are in compliance with RoK regulations and to all engineering, construction, HSE and QA/QC requirements; - Assistant with compiling scope of work and schedules for tenders and contracts; - Supervise the execution of mechanical works, both performed by contractors & venders, virifying that works are correctly carried out in accordance with project documentation and in the time frame; - Ensure that all Contractors are fully aware of the planned scope of activity on a daily, weekly and monthly schedule;
Октябрь 2022Сентябрь 2025
3 года
"TotalEnergies" Kazakhstan branch; Dunga Field
Mechanical & Piping Supervisor/ Куратор по строительству механические и трубомонтажные работы.
- Managed the execution of work completed safety, quality and as per project design, through the use of understandable quality and procedures, installation to handover Structural, Piping, Mechanical equipment. - Managed contractors’ activities related to execution of Leak Tests including line checking, punch closing, leak detection and repairing for Onshore facilities. - Reviewed and provided comments on construction method statements, material submittals, procedures from start of construction of projects till completion and handover to end users. - Coordinated and controlled the mobilization of contractors to sites including site lay down areas . - Facilitated issuance of necessary permits and Gate passes when requested by Contractors. - Provided field support during modification walkdowns, installation, testing and as-built verification. - Managed assigned contractors to ensure quality and time schedules, verified materials, equipment, assured results meet design requirements to achieve effective construction execution. - Managed and participated in final handover walk down inspection of mechanical equipment and piping.
Январь 2022Август 2022
8 месяцев
"Sicim" S.P.A. Kazakhstan branch;Offshore Kashagan (customer North Caspian Operating Company)
WPP Engineer / Turnaround Mechanical Lead
- Participation in data collection and work packages preparation, with a description of the task, materials, human resources and deadlines; - Inspection, monitoring and ensure that all mechanicals engineering and piping related maitanance activities are in compliance with RoK regulations and to all engineering, construction, HSE and QA/QC requirements; - Assistant with compiling scope of work and schedules for tenders and contracts; - Supervise the execution of mechanical works, both performed by contractors & venders, virifying that works are correctly carried out in accordance with project documentation and in the time frame; - Ensure that all Contractors are fully aware of the planned scope of activity on a daily, weekly and monthly schedule;
Декабрь 2019Декабрь 2021
2 года 1 месяц
"KAZ Minerals" PLC; Project B.V. Aktogay Expansion.
Supervisor Mechanical & piping/ Куратор по строительству (механического оборудования и трубопроводов.)
- Inspection, monitoring and ensure that all mechanicals engineering and piping related construction (field) activities are in compliance with construction related RoK regulations and to all engineering, construction, HSE and QA/QC requirements; - Verification of construction activities (SIRS/C0) by using CS - Participation in construction completion walk downs to categorize identified punch list items and finalize them as per the punch list procedure, pre-commissioning activity. - Check sheets filling out as a ‘Final Inspection’ stage of a component, entity, or functional element as proof that it was constructed and or functionally tested and in accordance to project requirements. - Perform and review risk assessment and risk evaluations; - Evaluate suppliers, vendors and service providers; - Organize of the interaction between suppliers, vendors and contractors; - Assistant with compiling scope of work and schedules for tenders and contracts; - Ensure that all Contractors are fully aware of the planned scope of activity on a daily, weekly and monthly schedule; - Ensure that all materials, machinery and equipment conform to the specifications and quality standards; - Analyze the Contactor’s man-hours against budget and report all variations; - The completion and timely submission of construction reports, accurately record all works for this purpose.
Ноябрь 2018Октябрь 2019
1 год
"Sicim" S.P.A. Kazakhstan branch;Tengiz (Customer TENGIZCHEVROIL LLP, CHEVRON KAZAKHSTAN BRANCH)
Supervisor Hydrotest & Test pack/ Начальник участка по гидроиспытаниям и консервации.
- Participation at FGP Wellhead Pressure Managment Project : MS-31; MS-52; MM; WP-53.2; WP-53.1; - Implement and maintain a Zero Harm environment; - Participation in pre-hidrotest & construction completion walk downs; HSE and Qa/Qc inspection of site, filling technical reports; - Source discipline related construction materials, equipment, machinery, etc. control and distribution on site; - Ensure that all materials, machinery and equipment conform to the specifications and quality standarts; - Planning of piping construction works. Hydrotest, cleaning and gauging of pipe and pipelines; - Post hydrotest activity: cleaning, drying and preservation of on-plot piping, pipelines; Производство работ по очистке, осушке и калибровке, гидроиспытаниям и консервации подземных и надземных тех. трубопроводов , комплектация материалов, работа с тех. документацией. Управление персоналом и организация рабочих процессов на строительстве. Контроль за соблюдением норм ТБ и соответствия качества выполняемых работ.
Август 2011Октябрь 2018
7 лет 3 месяца
"Ariadna" LLP; Tengiz, Kazakhstan (Customer TENGIZCHEVROIL LLP, CHEVRON KAZAKHSTAN BRANCH)
Supervisor Construction / mechanical & piping. Начальник учаска/прораб по механике и трубопроводам
- Participation at TCO projects: - FGP – 3GP construction & piping works; - IB-MOA - canteen & laboratory buildings erection; - IB-WEP- warehouse buildings erection; - SGI - site infrastructure development and driving of piles; - KTL- Turnaround 2016; 2018; - Pre-fabrication of pipe spools and erection of vessels, pipe racks, metal structures, industrial equipment, road furniture. - Participation in Qa/Qc inspection of site, filling technical reports. - Preparation & marking up of work related drawings and technical documentation. - Following safety due related customer/company/government procedures. - Preparation lists of mechanical isolation of lines and equipment. - Coordination of work with vendors and customer. - Support in look-ahead and planning activities. - Defining and requesting resources needed. - Checked progress and measurement of documentation management. - I have direct 100 reports (welders, pipefitters, laborers). - Total amount of Ariadna LLP contracts is around 65mln dollars per year. Контроль за сроками и качеством проведения механо-монтажных, трубомонтажных и общестроительных работ, (изготовление и монтаж металлоконструкций, трубопроводов технологических линий, пром. оборудования, монтаж сэндвич панелей, армирование и бетонирование, устройство щебёночных дорог, забивка свай.)Управление персоналом до 100-тa человек, планирование работ, заказ техники и оборудования, оформление заявок на закуп и получения со склада материалов, составление материальных отчетов (М29), ведение табелей и тех.документации.
Май 2010Июль 2011
1 год 3 месяца
"MunaiGazKurylys" LLP Tengiz, Kazakhstan (Customer TENGIZCHEVROIL LLP, CHEVRON KAZAKHSTAN BRANCH)
Mechanical & Piping Forman / Мастер механомонтажного участка
IB-MOA Project. Контроль и руководство за изготовлением и монтажом металлоконструкций, трубопроводов, механического оборудования
Июль 2004Июнь 2009
5 лет
ТОО "ЛИСАКОВСКИЙ КАЗМЕХАНОМОНТАЖ"

Костанай

Строительство, недвижимость, эксплуатация, проектирование... Показать еще

Supervisor Construction /mechanical & piping. Прораб по механике и трубопроводам.
Контроль и руководство строительно-монтажными работами, монтаж пром. оборудования и трубопроводов, эстакад, конвееров, мостовых кранов, каркасных зданий и сооружений.)Планирование и обеспечение: спец. техникой, материалами и оборудованием, работа с тех.документацией.

Навыки

Уровни владения навыками
Внутренние коммуникации
Деловая коммуникация
Наружные инженерные сети
Производство строительно-монтажных работ
Строительный контроль
Монтаж инженерных систем
Нефтегазовое оборудование
Нефтегазопровод

Опыт вождения

Имеется собственный автомобиль

Права категории B, C

Обо мне

Опытный пользователь ПК, MS ofice, AutoCad

Высшее образование (Бакалавр)

2014
Высшее образование (Бакалавр)
Промышленное и гражданское строительство, Строительство

Знание языков

Русский — Родной

Английский — B2 — Средне-продвинутый

Повышение квалификации, курсы

2017
Сертификаты ТШО
ТШО, РПР и Асор;Грузоподъёмные работы ТБ-119;Работы на высоте;Изоляция опасных источников;Оказание первой помощи;Безопасное вождение.
2015
ВИК - Визуальный и измерительный контроль
Аттестационный центр по неразрушающему контролю г.Караганда, Второй уровень неразрушающего контроля ВИК (Сварные соединения-трубопроводы, прокат и изделия)
2014
Ответственный за безопасное производство работ кранами, за безопасную эксплуатацию подъёмников, ответственный за безопасную эксплуатацию и хранение сосудов под давлением.
РГТИ
2008
Водительское удостоверение
автомобиль, Категории (В; С)

Гражданство, время в пути до работы

Гражданство: Казахстан

Желательное время в пути до работы: Не имеет значения