Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was less than a week ago

Male, 31 year, born on 2 June 1994

Almaty, not willing to relocate, prepared for occasional business trips

Technical Office Engineer / Production & Technical Engineer (PTO)

1 500 000  in hand

Specializations:
  • Production engineer, quantity surveyor

Employment type: full time, part time, project work/one-time assignment

Work experience 10 years 5 months

December 2025currently
6 months

IT, System Integration, Internet... Show more

Technical Office Engineer / Production & Technical Engineer (PTO)
As-Built Documentation: Prepared, verified, and maintained a full suite of as-built documentation (inspection acts, sketches/as-built drawings, work logs, passports, and quality certificates). Design Analysis: Analyzed project and working documentation to identify design clashes, inconsistencies, and discrepancies. Liaison & Approvals: Drafted and coordinated official correspondence with Clients, General Contractors, Design Supervisors, and Technical Supervision. Prepared requests for material and equipment substitutions. Developed technical justifications and comparative analysis tables. Stakeholder Communication: Managed professional correspondence with clients, suppliers, and manufacturers. Quality & Compliance: Monitored on-site compliance with project specifications, drawings, and industry regulations/standards. Financial Reporting: Prepared Progress Certificates (equivalents of KS-2/KS-3) and statements of completed work volumes. Project Commissioning: Participated in the final handover process and prepared documentation for facility commissioning. Cross-functional Collaboration: Coordinated with Accounting and Procurement departments regarding material supply and closing documents. Document Control: Established and updated documentation registers and trackers. Deadline Management: Monitored submission schedules for technical documentation and tracked contractual obligations. Key Achievements: Full Compliance: Successfully compiled and handed over the complete package of as-built documentation, accepted by the Client without remarks. Risk Mitigation: Officially coordinated and documented all project deviations and design changes, ensuring legal and technical compliance. Seamless Handover: Ensured all works and supplies were fully supported by documentation, enabling smooth project closing and final payments.
December 2023currently
2 years 6 months
Individual Entrepreneur (Self-Employed) Construction & Supply Management
Logistics & Supply Chain: Organized and monitored the supply of heavy machinery and inert materials to construction sites. Project Planning: Coordinated earthworks, including excavation and site preparation. Team Leadership: Managed subcontracting crews and heavy equipment operators. Quality Control: Supervised work execution to ensure compliance with deadlines, volumes, and quality standards. Stakeholder Management: Liaised with clients, subcontractors, and suppliers. Technical Analysis: Reviewed project and working documentation specifically for earthworks and site preparation. Contract Administration: Drafted and negotiated contracts, closing documents, and Acceptance Acts (Certificates of Completion). Contract Compliance: Ensured that actual work performed aligned strictly with contractual terms. Change Management: Participated in negotiating changes in work scope and additional work orders. Communication: Managed business correspondence and provided technical clarifications. Technical & Engineering (PTO) Competencies: Documentation: Developed and maintained as-built documentation for earthworks. Resource Planning: Prepared justifications for work volumes, timelines, and resource allocation. Regulatory Liaison: Addressed comments and requirements from clients and supervisory authorities. Project Handover: Provided full support for projects through to the final handover and acceptance stage. Key Achievements: Successfully delivered and closed projects within established deadlines. Minimized equipment downtime and prevented schedule disruptions. Achieved flawless documentary closing of works with zero financial disputes.
August 2023December 2023
5 months

Mining Industry... Show more

Technical Office Engineer / Production & Technical Engineer (PTO)
Developing detailed designs. Doing feasibility assessments and site inspections. Preparing and implementing project plans. Researching and providing estimates for projects. Reviewing government regulations and ordinances. Monitoring and optimizing safety procedures, production processes, and regulatory compliance. Making recommendations or presenting alternative solutions to problems. Confidently liaising with clients and other professional subcontractors. Project management duties (e.g. managing budgets, resources, and deadlines; acquiring and compiling quotes, etc.).
May 2023December 2023
8 months
ТОО Media Group
Technical Office Engineer / Production & Technical Engineer (PTO)
Managing, designing, developing, creating and maintaining construction projects Conducting on-site investigations and analyzing data Assessing potential risks, materials and costs
May 2020December 2023
3 years 8 months

Construction, Real Estate, Architecture... Show more

Technical Office Engineer / Production & Technical Engineer (PTO)
2.1. Checking the compliance of the volumes of construction and installation works, as well as the structures of the approved design and estimate documentation, working drawings, building codes and regulations, standards, specifications, labor protection standards. 2.2. Participation in the consideration and approval of changes in design decisions that arise during construction, promptly resolve issues of replacing, if necessary, materials, products, structures (without reducing the quality of construction objects). 2.3. The study of the reasons causing failures in terms and deterioration in the quality of construction installation works, participation in their elimination. 2.4. Implementation of technical acceptance of completed construction and installation works and objects, registration of the necessary technical documentation. Participation in the work of commissions for the acceptance of construction projects and their commissioning. 2.5. Keeping records of completed construction and installation works and preparing the necessary data for reporting on the implementation of construction plans. 2.6. Implementation of the verification of estimate documentation for the construction of facilities, cost calculation, accounting of work performed. 2.7. Preparation of estimates for additional work. 2.8. Checking the estimate documentation received from the customer and preparing conclusions on its quality. 2.9. Coordination with the design organization and the customer of the estimate, calculation of the cost of materials and additional costs, statement of work performed, specifications, acts of work performed, percentages. 2.10. Maintaining established reporting.
May 2018May 2020
2 years 1 month

Metallurgy, Metalwork... Show more

Instrumentation and Automation Specialist
Installation, dismantling, maintenance, repair: sensors of speed, pressure, temperature, driving leakage, flow meter, scales and other measuring devices.
January 2017May 2018
1 year 5 months

Metallurgy, Metalwork... Show more

Engineer of Technical control department
Duties: * Control the content of gold in the ore; * Control over the formation of ore stores; * Control over the correctness (by a certain method) of mining ore stores; * Providing a scheme for mixing ore of different classes when fed to the Complex of large crushing; * Control over the mixing of ore of different classes when fed to the Complex of large crushing; * Forecasting, analyzing the content of gold in the initial ore; * Conducting technological experiments to determine the content of gold, etc . Attainment: * Minimization of the deviation of gold content from the plan; * Increase in the output of finished products * More probable forecasts of the content of gold in the ore, etc
October 2016January 2017
4 months

Metallurgy, Metalwork... Show more

Controller of non-ferrous metallurgy products
-Collection and provision of information for the Technical control department summary; - selection, delivery, preparation and delivery of samples to analyze ; - selection of different samples to determine the content of gold in the ore; etc
March 2016May 2016
3 months

Metallurgy, Metalwork... Show more

Trainee
I have passed industrial pre-diploma practice with a mining engineer. It was a great experience that allowed me to apply knowledge in the industry.
June 2015September 2015
4 months
Shopko Hometown New Town, ND, USA

Retail... Show more

Manager assist
I've been worked in the United States under the program "Work and Travel" as a sales consultant in the trading house "Shopko" New Town, North Dakota. Have entered into duties: -merchandising -Consulting and customer service -provision and delivery of goods, etc. Achievement: - was interesting experience, - have improved spoken English, - have met with their mentalities
June 2013July 2013
2 months
Alesisevsky dolomite mine

Petropavlovsk

Trainee
I spent a month in the dolomite mine, where I got acquainted with the extraction and processing of the building stone.

Skills

Skill proficiency levels
Electronic systems installation
MS Movie Maker
Compass 3D
MS Outlook
Driving Licence BC
MineVision programm
MS PowerPoint
MS Excel
MS Word
Video Editing
Electrical circuits
Technical Translation
Geology
Mining
AutoCAD
3D Моделирование
Business English

Driving experience

Driver's license category B, C

About me

* Diploma II degree for the best report at the V scientific and technical conference in Kokshetau State University named after Sh. Ualikhanov. * Diploma of III degree for the best report at the VI scientific and technical conference in Kokshetau State University named after Sh. Ualikhanov. * The letter of gratitude for the huge contribution to the development of the University and was awarded the nomination "Shokhan zhuldyzy". * Certificate for successful participation 05.15 - 09.15 on the program "Work and Travel" in the USA; * Interested in running for far distances, swimming and futsal (Personal record in Half marathon-2h10min, Marathon-5h; and some achievements in Kazakh wrestling, taekwondo)

Higher education

2016
Higher education
Kokshetau State University named after Sh. Ualikhanov, Kokshetau
Technical and technology, Mining (Diploma with distinction)

Languages

Kazakh — Native

English — B2 — Upper Intermediate

Russian — C2 — Proficiency

Professional development, courses

2018
Theoretical and practical training course about "The base of the electricity and hydraulics"
Epiroc, Devices, the symbols of electric and hydraulic outlines, Transformer, diodes, 3-phase motor, gauges, sensors, pumps, valves etc.
2015
Сертификат Intermediate
EDUCARE English center, Английский язык

Tests, examinations

2020
IELTS - 5.5 overallReading 6.0Listening 5.5Speaking 5.5Writing 5.0
IDP

Citizenship, travel time to work

Citizenship: Kazakhstan

Permission to work: Kazakhstan

Desired travel time to work: Doesn't matter