Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas more than two weeks ago
Male, 42 years, born on 4 February 1984
Atyrau, willing to relocate, prepared for business trips
HVAC Engineer
Specializations:
- Other
Employment type: full time
Work experience 23 years 9 months
August 2019 — currently
6 years 10 months
North Caspian Operating Company N.V.
Atyrau
Oil and Gas... Show more
HVAC Engineer
New Development: Engineering, New facilities on Pre Feed, Feed, Detailed Design and Execution stages.
June 2017 — August 2019
2 years 3 months
Tengizchevroil. KPJV Limited LLP Atyrau Branch. Future Growth Project/Wellhead Pressure Management Project (FGP / WPMP).
Atyrau
Oil and Gas... Show more
HVAC Commissioning Engineer, Mechanical, Piping, Welding K.S. and HDPE Pipe QC Inspector
Tengiz (FGP Project)
Carried out control of the quality of work, installation HVAC equipment, welding and installation of HDPE and K.S. pipes, in accordance with construction drawings. Piping testing: Visual test Hydrostatic and pneumatic testing for strength and leaking of joints according to “PLL”(Piping line list)
Pipefitting work :
Verify piping material class conformance to Specifications and passport data.
Monitor in-process lying down pipelines as per isometrics and P&ID (Piping and Instrumentation Diagram), including witness flange bolted connection and threaded joints.
Inspection of pipe supports and other fixtures.
Welding work :
Visual weld inspection. Monitor welding activities to ensure according to “WPS” (welding process specification) Control over pre-heating and inter-pass temperature of welding joints as per “WPS”.
Analyze the defects, identify the root causes and implement the corrective measures for continual improvement. Monitor process of post weld heat treatment PWHT, as per “WPS”.
Conduct daily routine checks on all welding activities if welding parameters in applicable WPS have been achieved such as bevel tolerances, cleaning, welding consumables type and size, welder qualification, welding equipment condition, pre-heating (if requires) and inter-pass temperature requirement, electrical characteristics (amp-volts) welding speed, welding size.
Responsible for the implementation and inspection based on project procedures and specifications and quality control procedures for the fabrication of all piping which are fabricated at shop and site locations.
Verify piping material components as per specified in the drawing bill of materials according to its piping service class and to ensure that all items are fully certified by the accompanying certificates.
Check accordingly to its material color coding, stock code number and heat number.
Performing dimensional checks based on approved for construction drawing and fit-up requirements in conformance as per WPS prior to welding.
Storage Tank
Site welding preparation activities and check welder and welding procedures qualified as per
project requirements and according to contractor WPS.
Contractor’s works coordination during non-destructive control method works performance.
Management of technological preparation of welding and assemble works performance. Analysis
welding works technology and quality.
Inspection of sandblasting / painting & insulation of aboveground piping, pressure vessels &
storage tanks.
January 2015 — March 2017
2 years 3 months
"ABE&K"LLP
Atyrau
Construction, Real Estate, Architecture... Show more
HVAC Engineer
Organization and control of operation of ventilation equipment, air conditioning systems, heating systems at the company's facilities;
Participation in the preparation of proposals for the reconstruction, technical re-equipment and modernization of equipment;
Participation in acceptance of new production capacities, equipment after repairs and installation;
Control of maintenance at the facilities of as-built documentation;
Calculation of schemes, selection of equipment, maintenance of installation of these systems at sites.
Verify piping material components as per specified in the drawing bill of materials according to its piping service class and to ensure that all items are fully certified by the accompanying certificates.
Check accordingly to its material color coding, stock code number and heat number.
Performing dimensional checks based on approved for construction drawing and fit-up requirements in conformance as per WPS prior to welding.
Storage Tank
Site welding preparation activities and check welder and welding procedures qualified as per
project requirements and according to contractor WPS.
Contractor’s works coordination during non-destructive control method works performance.
Management of technological preparation of welding and assemble works performance. Analysis
welding works technology and quality.
Inspection of sandblasting / painting & insulation of aboveground piping, pressure vessels &
storage tanks.
November 2011 — January 2015
3 years 3 months
ТОО F-Service
Almaty
Electronics, Tool Engineering, Household Appliances, Computers and Office Equipment... Show more
Technical specialist of West Kazakhstan region
Execution of concluded contracts on a turn-key basis, including supply of sewerage pump stations, heating and cooling equipment, industrial chillers, water-supply stations;
Chef-installation, commissioning, training of the customer's personnel, warranty service, maintenance and repair;
Organizational and technical issues;
Perform maintenance;
Drawing up requests for materials and equipment in accordance with the project documentation;
Economic support of the company's branch (repair and maintenance);
Service maintenance of systems IBP. (EMERSON) 70,80,100 Replacement of batteries, cleaning and replacement of cooling fans.
July 2010 — November 2011
1 year 5 months
Sozynov S.M. Individual Enterprise
Almaty
Electronics, Tool Engineering, Household Appliances, Computers and Office Equipment... Show more
HVAC Engineer
Sale, installation and modernization of HVAC equipment;
Works on setting up the boiler automation system equipment;
Commissioning of boilers, burners, automatics of safety, thermal points.
April 2007 — May 2010
3 years 2 months
Infastech (Bell Helicopter) Joint Stock Company
USA
Metallurgy, Metalwork... Show more
Workshop master
Management of the production department;
Ensuring that the production tasks assigned to the workshop are achieved in terms of production volume, quality, and the specified nomenclature within the established timeframe;
Increase in labor productivity, decrease labor intensity of products on the basis of rational loading of equipment and use of its technical capabilities, increase in the coefficient of shifts in the operation of equipment, economical expenditure of raw materials, materials, fuel, energy and cost reduction;
Arrangement of workers and brigades, the formation of brigades (their quantitative, professional and qualification composition), coordination of their activities;
Control over compliance with technological processes, prompt identification and elimination of the reasons for their violation.
June 2002 — May 2007
5 years
Infastech (Bell Helicopter) Joint Stock Company
USA
Workshop master
Management of production equipment for the production of tools, screws, guides;
Implementation of the production plan per shift;
Maintenance of equipment in working order.
Skills
Skill proficiency levels
Driving experience
Driver's license category B
About me
Навыки грамотного делового общения, делового этикета;
Большой опыт продаж, сопровождения сделок, подготовки документов;
Умение разрешать конфликты;
Уверенный пользователь ПК и оргтехники;
Коммуникабельность, самостоятельность, ответственность;
Прекрасная обучаемость;
Higher education (bachelor)
2003
Higher education (bachelor)
University of Illinois, USA
Технологический, Bachelor of Mechanical Engineering (HVAC)
Languages
Citizenship, travel time to work
Citizenship: Kazakhstan
Permission to work: Kazakhstan
Desired travel time to work: Doesn't matter