Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas more than two weeks ago
Male, 40 years, born on 5 March 1986
Semey, willing to relocate, prepared for business trips
Engineer/power engineer
Specializations:
- Other
Employment type: full time
Work experience 11 years 5 months
September 2019 — July 2020
11 months
JSC "FIC Alel", Suzdal site (Nordgold)
Engineer in Norgold Business Systems
1. Mini-Transformation Project (PAO Severstal).
2. Implementation of best practices (finding applicable practices, their adaptation, implementation and support).
3. Upgrading meetings and reporting efficiency.
4. Application of problem-solving techniques.
5. Development of investment projects to enhance productivity, cost cutting, organizational efficiency.
6. Trained the company employees on the Production System, the basic tools of lean manufacturing, methods for finding and analyzing problems, etc.
7. Productivity efficiency projects – implementation of 5C, SOP, SMED, TPM, etc.
8. Visualization of activities, writing articles in a corporate newspaper, issuing a mine bulletin, drawing various infographics.
February 2018 — September 2019
1 year 8 months
JSC "FIC Alel", Suzdal site (Nordgold)
Planner for Power Ops Maintenance
Planning, scheduling and monitoring the preventive maintenance of the metallurgical complex power equipment; MC Chief Power Engineering Service budgeting, execution and control, MC Chief Power Engineering Service capital investment program development, execution and control, drafting ToR and contracts for materials and services supply with suppliers and contractors, drafting activity management plan for works, instructions, drawing up a training program for SAP users.
February 2015 — June 2017
2 years 5 months
Andas-Altyn Mining and Ore Company LLP
Power engineer
GRK Andas-Altyn LLP Subdivision for this period: Office, Mukur Mine.
July 2016 — January 2017
7 months
IRG Kazakhstan LLP
Procurement Manager
procurement of RoK subsoil users (procurement website, drawing up tender documentation, negotiations with suppliers and contractors, drafting and signing contracts, drawing up short-term, medium-term and long-term procurement programs for a company, reporting on the procurement of a subsoil user to state authorized institutions), escorted foreign delegations as a English-Russian translator.
December 2013 — February 2015
1 year 3 months
IRG Kazakhstan LLP
Power engineer
Ensured the company is supplied with utilities (water, heat and power supply), kept the technical documentation, negotiated with counterparts in my area.
October 2013 — December 2013
3 months
Andas-Altyn Mining and Ore Company LLP
Power engineer
Ensured the company is supplied with utilities (water, heat and power supply, kept the technical documentation, negotiated with counterparts in my area.
June 2013 — October 2013
5 months
"Karazhyra LTD" LLP
mining equipment fitter-repairman (foreman)
Excavators, drilling equipment
May 2012 — February 2013
10 months
Dank LLP
Acting Chief Power Engineer
The Chief Power Engineer’s group for this period: site lead power engineer – 3 people, company’s Power Ops personnel – 139 people. LLP "Dank" Subdivisions for this period: Central office, production base No. 1, production base No. 2, Dore alloy plant, 4 operating mines. Operated equipment: 35/10 kV substations, 10/0.4 kV substations, EPTS-10 / 0.4 kV, 0.4 kV substations, 0.4 kV-35 kV power lines, crusher complexes, EKG-5 excavator, EO-2503 excavators, SBU-100 drilling rigs, 30 kW, 100 kW, 200 kW diesel power plants (with automatic voltage and speed control systems), 500 kW, hydrometallurgical workshops, Dore alloy plant).
February 2012 — May 2012
4 months
Dank LLP
Lead power engineer
Ensured the company is supplied with utilities (water, heat and power supply), kept the technical documentation, negotiated with counterparts in my area.
January 2009 — February 2012
3 years 2 months
Dank LLP
Power engineer
Ensured the company is supplied with utilities (water, heat and power supply), kept the technical documentation, negotiated with counterparts in my area.
May 2008 — December 2008
8 months
LLP "Arman"
Level iV Electrical fitter-repairman
Maintenance and repair of electrical equipment
Skills
Skill proficiency levels
Medium level
Level not specified
Driving experience
Own car
Driver's license category BAbout me
Leadership skills, good communication skills, punctuality, responsibility, self-discipline, sociability, team player.
Higher education (bachelor)
2018
Higher education (bachelor)
D. Serikbayev East Kazakhstan State Technical University
Faculty of earth Sciences, Bachelor of Engineering and Technology
2014
Higher education (bachelor)
Accountancy College, Semey
Commercial Accountants Training
2009
Higher education (bachelor)
Ust-Kamenogorsk, RoK Ministry of Emergency, State Institution “National Research Center for Non-Ferrous Metallurgy Enterprises Safety Technology”
White Collars Refresher Training on of steam boiler operation
2008
Higher education (bachelor)
S. Toraigyrov Pavlodar State University
Power faculty, Bachelor of Electrical Engineering
2005
Higher education (bachelor)
"Orken" Humanitarian Aid and Development International Fund housed in S. Toraigyrov Pavlodar State University
American English Training
2004
Higher education (bachelor)
Semipalatinsk Scientific and Methodological Center for New Technologies in Education "Intellect"
Basic computer skills training program
Languages
Citizenship, travel time to work
Citizenship: Kazakhstan
Permission to work: Kazakhstan, Russia
Desired travel time to work: Doesn't matter