Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas today at 13:43
Male, 53 years, born on 19 January 1973
Atyrau, not willing to relocate, prepared for business trips
Electrical supervisor
Specializations:
- Quality engineer
- Power engineer, electrical engineer
Employment type: full time, project work/one-time assignment
Work experience 32 years 2 months
March 2022 — April 2024
2 years 2 months
Bolashak Atyrau, LLP
Atyrau, www.bolashak.com
Business Services... Show more
Супервайзер отдела контроля и обеспечения Качества по электрике и КИП
Project: Tengiz, TCO/FGP-WPMP 3GI.
Responsible for supervising and coordinating site E&I inspection activities and surveying progress
to ensure on-time completion of projects. Planning, control, and organization of the performing
activities. Support all project groups in matters of quality assurance.
December 2017 — March 2022
4 years 4 months
Bolashak Atyrau, LLP
Kazakhstan, www.bolashak.com
Business Services... Show more
Electrical QC inspector - Overhead Power Line
Project: Tengiz, TCO/FGP C&P
Performing activities: Responsibility to conduct inspections of ongoing and completed work, incoming material inspection and testing according to Inspection and Test Plan to ensure compliance with project design specifications and drawings. Carrying out visual inspections, dimensional control, final inspection. Signing off Quality Verification Documents (Checklists, testing protocols) as appropriate to confirm the activities have been completed. Preparation of Surveillance reports and NCRs, inspection status reports for Quality Supervisor, including Project Weekly Quality Reports.
September 2015 — September 2017
2 years 1 month
Bolashak Atyrau, LLP
Kazakhstan, www.bolashak.com
Business Services... Show more
Electrical Supervisor
Project: Eskene West Railway Project, Karabatan, Kasakhstan. Company: NCOC NV.
Supervising, Coordinate and monitor site activities which ongoing and under completion.
Performed Visual and dimensioning checks on Electrical works and Electrical Equipment at site.
This includes Electrical works on Switch gears, distribution panels, cable pulling monitoring, LV and MV cable jointing, grounding terminations to link boxes, Transformers installation and termination, small power, lighting, Trace Heating, Earthing system installation .
Review of product specification, data sheet of contractor scope of supply material (like Cable trays, Power & control Cables, lighting fixtures, Lighting & power distribution boards, etc.)
Reporting, update and check all Red line mark-up drawings done at site as per site condition & issuing to contractor for site execution. Resolve day to day queries raised by contractors.
Proper co-ordination with design engineers at site. Supervision works schedule that is attainable within the target date prior to pre-commissioning handover. Assist vendor at site. Supervision that all construction checklists and punch items are closed accordingly prior to pre-commissioning.
January 2009 — September 2015
6 years 9 months
AETS LLP
Atyrau, aets-llp.com/
Construction, Real Estate, Architecture... Show more
QA/QC Manager
• Development and implementation of quality assurance plans based of ISO standards;
• Development of quality control procedures, inspection and test plans, method statements, workplace risk assessments;
• Monitoring of compliance of design, engineering and technological disciplines, rules and regulations for the protection of health, safety, industrial hygiene and fire safety requirements of environmental, health authorities and technical supervision;
• Monitoring the work of the company technical and construction departments, checking the company received material resources (raw materials, semi-finished products, components), preparation of conclusions on their compliance with quality standards, specifications and design decisions, monitoring of testing finished products, certifying the quality of works and services on the basis of inspections;
• Preparation of a complaint in the presence of violation of the quality requirements by suppliers, work on the analysis of complaints, the investigation of the causes of defects and violations of production technology, the work quality degradation, to develop proposals for error cause removal;
• Select the intended sub-contractors on the basis of the audit and control of their work;
• Carrying out laboratory tests of electrical devices up to 1000 V and higher (Approved for testing and measurement of electrical equipment);
• Preparation of as-built documentation, acts, checklists, test protocols based on the technical documentation of the RK and the customer's requirements;
• Hand over of completed objects to work and state committee.
Implemented project:
• Construction of 35 kV overhead lines for the Locomotive Depot, 10 kV OHL Substation KEGOC – Siding 8, Modernization of the SS 220 Kulsary, installation of 10 kV substation at the Siding 8, Installation of a backup generator at the Siding 8, TCO project "CEP Rail Infrastructure", 2006-2007.,
• Construction of 35 kV overhead lines for the new CRL, TCO project, "Crude Export Project", 2006-2007.,
• Construction, power supply and commissioning of air quality monitoring stations (AQMC), Customer - Agip KCO, 2006-2008.,
• Maintenance of electrical overhead lines cable lines and, 110/10, 10/0.4kV electrical Substation at the Karabatan area, Customer - ESS / Agip KCO, 2006-2009,
• Commissioning of Modules Shelters of the main pipeline, customer - Saipem 2008,
• Installation of 110 kV cable line SS “Old City” - 12 SS, Client - KOCCK, 2008,
• Installation of 10 kV substation 17 "South" - Distributing Point 32 Zhumysker, Customer - TCO, 2008-2009,
• Installation of transformers 10/0.4 kV, 1.6 MW substations 9.2, 9.3 Karabatan, Customer - Agip KCO, 2009,
• Completion of installation of 35/110 kV equipment, communication and dismantling work at the KEGOK SS 220kV Atyrau – PGP Karabatan, Client – Bateman Kazakhstan/Agip KCO, 2009-2011,
• Engineering, procurement and construction of 110 kV overhead line AHPP-SS Nursaya with tie-in at SS Kok-Arna and SS Zhumysker, Customer – Construction Department of Atyrau regional Akimat , 2007-2011,
• Engineering, procurement and construction of 10 kV overhead lines for the export oil pipeline, fuel and gas export pipelines, customer - Punj Lloyd Kazakhstan / Agip KCO, 2007-2011,
• Purchase and delivery of electrical materials, customer - KPJV / TCO, 2014-2015,
• Provision of preventive and corrective maintenance services of overhead lines, poles, and towers in Karabatan, Client – Ersai Caspian Contractor, 2014-2015.
October 2012 — June 2014
1 year 9 months
APC LLP
Atyrau
Construction, Real Estate, Architecture... Show more
Construction Supervisor
Project - Construction and commissioning of Oily Water Treatment Plant, Phase 1 at the Koshanai
base, Mangistau region. Client - NCPOC.
The organization and management of construction (civil, mechanical, piping, E&I) and
commissioning, supervision of current documentation, development of Method Statements,
Inspection and Test Plans, workplace risk assessments, preparation and opening Permit to Work,
preparation of as-built documentation, handover of the completed object to work committee.
April 2007 — January 2009
1 year 10 months
AETS LLP
Atyrau, aets-llp.com/
Construction, Real Estate, Architecture... Show more
Construction Supervisor
The organization and management of construction of 0,4-110 kV Overhead Lines, pulling of electrical cable, installation of electrical equipment. Supervision of current documentation, development of Method Statements, Inspection and Test Plans, workplace risk assessments, preparation and opening Permit to Work, preparation of as-built documentation, handover of the completed object to work committee.
June 2006 — April 2007
11 months
AETS LLP
Atyrau, aets-llp.com/
Construction, Real Estate, Architecture... Show more
QA/QC Engineer
• Development of quality control procedures, inspection and test plans, method statements, workplace risk assessments;
• Monitoring of compliance of design, engineering and technological disciplines, rules and regulations for the protection of health, safety, industrial hygiene and fire safety requirements of environmental, health authorities and technical supervision;
• Monitoring the work of the company technical and construction departments, checking the company received material resources (raw materials, semi-finished products, components), preparation of conclusions on their compliance with quality standards, specifications and design decisions;
• Carrying out of inspection of the executed works;
• Preparation of as-built documentation, acts, checklists, test protocols based on the technical documentation of the RK and the customer's requirements;
January 1992 — June 2006
14 years 6 months
Atyrau Heat Power Station
Atyrau
Power Industry... Show more
rigger, railroad worker, driver
Served as an auto mechanic, supply agent
Skills
Skill proficiency levels
Driving experience
Own car
Driver's license category A, B, C, D, E, BE, CE, DEAbout me
I have no pernicious habits, sociable, go in for foreign languages, cars. In 1992-1994. - Military service in the armed forces of the RoK, military occupational specialty - radio telegraphist.
Higher education (bachelor)
2011
Higher education (bachelor)
Technological, Electric power industry
2006
Higher education (bachelor)
Atyrau polytechnical college
Electrical power supply of oil and gas production, Electrical technician
Languages
Professional development, courses
2020
Respiratory Protective Equipment course
TCO
2020
"Avon NH-15" usage training course
TCO
2019
EX Inspection and auditing
Edil-Oral.kz LLP
2019
Electrical Safety before and up to 1000 V, Level V
"Atyrau Local Company" LLP
2018
PTW and hazard assessment
TCO
2018
Working at Heights
TCO
2018
Confined space entry
TCO
2018
Electrical Safe work practices
TCO
2018
Work face planing implementation
TCO
2018
Essential First Aid Training with AED
TCO
2015
Risk Assessment. Review nonconformities for corrective and preventive action
PBM&S, internal auditor
2015
"Management Sistem Internal Auditor" based on the ISO 9001:2008, ISO 14001:2004, OHSAS 18001:2007 AND ISO 19011:2011 requirements
PBM&S, internal auditor
2015
PTW L2, rev. 9
Agip KCO
2015
Working at Height, Confined Space Entry training (Standard Level)
SEFtec Global Training LLC
2013
Agip KCO Personal HSE Passport
Agip KCO
2012
Energy management base on standard ST RK ISO 50001
Kazakhstan Institute of standartization and certification
2012
WRAP & TRIC
Agip KCO
2012
PTW L2, rev. 8
Agip KCO
2011
IOSH (International General Certificate in Occupational Safety and Health)
Feradu, Safety
2011
Development, implementation and procedure of internal audits of integrated management system ICO 14001:2004 OHSAS 18001:2007
ISAS International Standard Application Services, internal auditor
2011
QA/QC for Contractors Workshop
Key Partners Group
2009
Finance for non-finance managers
"Ambition (CIS)
Citizenship, travel time to work
Citizenship: Kazakhstan
Permission to work: Kazakhstan
Desired travel time to work: Doesn't matter