Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяБыл более двух недель назад
Мужчина, 51 год, родился 20 января 1975
Алматы, готов к переезду, готов к командировкам
Controlling Quantity Surveyor
Специализации:
- Менеджер по продажам, менеджер по работе с клиентами
Тип занятости: полная занятость, проектная работа/разовое задание
Опыт работы 17 лет 9 месяцев
Август 2019 — по настоящее время
6 лет 10 месяцев
Future Growth Project is the major expansion of Tengiz production of Chevron in Kazakhstan
Атырау
Нефть и газ... Показать еще
Quantity Surveyor
• Daily Site Walk to perform physical assessment /verification of contractors progress and as-installed quantities;
• Perform Material Take-offs (MTO's) from AFC drawings in order to validate quantities of work installed ;
• Maintain records of verification activities, walk-downs /spot checks and reviews of Contractor reported progress including contractor manpower on site for Brown and Green Field;
• Tracking commodities during the construction phase by designing and maintaining the progress tracking verification dashboard file (Earthworks, Civil, Concrete, Structural, Architectural, Mechanical, Piping, E&I);
• Liaising with Contractor to review weekly progress prior to submission;
• Assisting MileMarker (Progress System) team with earned progress queries;
• Reviewing Contractor’s BOQs against IFC drawings for ITP, CWEs and AWE, and Contractor’s IFC measures;
Январь 2019 — Август 2019
8 месяцев
ISKER Group - Kazakhstan-based Construction and Oil Consortium
Атырау
Нефть и газ... Показать еще
Quantity Surveyor
• From AFC drawings generated MTOs for civil, mechanical, architectural, civil for piping, civil for electrical;
• Tracked commodities during the construction phase (Earthworks, Civil, Concrete, Structural, Architectural, Mechanical, Piping, Electrical and Instrumentation works);
• Prepared and sustained notes changes, maintained the MileMarker progress system;
• Supported Contractor WFP specialists with the development and assembly of IWPs, ensuring safety, quality and efficiency of the Workface planning process;
• Facilitated WFP in the development of IWPs;
• Utilized construction expertise to assist Contractor’s development of IWPs and subsequent assembly of IWPs;
• Coordinated with WFP specialists to provide construction knowledge to project schedulers, engineers, other WFP facilitators and superintendents;
• Reviewed final IWP for completeness and accuracy;
• Cleared constraint identification;
• Supported the IWP process from initial IWP scoping sessions through to the IWP close out;
• Interacted with Planning and Construction groups to facilitate the accuracy of estimation;
• Reviewing final IWP for completeness and accuracy
• Constraint identification and clearance
• Provide continuous support of the IWP process from initial IWP scoping sessions through to the IWP close out
Июнь 2017 — Сентябрь 2018
1 год 4 месяца
CTTEE( GIZ)- The worldwide German international service provider for sustainable economic growth and international education
Алматы
Общественная деятельность, партии, благотворительность, НКО... Показать еще
Coordinator
• Developed detailed project execution and schedule plan to establish Centre for Transfer Technology Education and Entrepreneurship (CTTEE) in Kazakhstan;
• Prepared all documentations and registered CTTEE as a NGO in Kazakhstan government agency (Ministry of Justice of Kazakhstan);
• Managed the overall implementation of the project in Kazakhstan ensuring the coherence between the various project components, activities and partners;
• Searched for new partners, donors, financial support programs and grant opportunities and mechanisms on the national, regional and international level for agricultural and food industry partners;
• Carried out demand-driven technical trainings, workshops and seminars to address problems and needs in food and agricultural industries in Kazakhstan (Quality problems and cost efficiency in milk production , Modern technology of meat processing; Implementing modern methods of effective pests’ plants protection, post-harvest technology, Modern Post-harvest technology, Business integration amount Central Asian countries in food and agricultural field, Effective Implementation of HACCP principles in food industry etc);
• Regularly liaised with project stakeholders, Chamber of Entrepreneurs of Kazakhstan, other local authorities, NGOs, international organizations to build up and maintain good working relationships;
• Performed monitoring and evaluation of the managed program activities;
Сентябрь 2016 — Июнь 2017
10 месяцев
LLC Tomskles, Private Kazakhstan company
Алматы
Estimating Engineer
• Generated MTO’s (Material Take Offs) on all purchases;
• Tracked commodities during the construction phase( Earthworks, Civil, Concrete, Structural, Architectural, Mechanical, Piping, Electrical and Instrumentation works);
• Interacted with Planning and Construction groups to facilitate the accuracy of estimation ;
• Verified construction work completion;
Январь 2014 — Август 2016
2 года 8 месяцев
PYXERA Global (USAID), DIVERSIFICATION OF MONO-TOWN ECONOMIES (DOME)
Караганда
Общественная деятельность, партии, благотворительность, НКО... Показать еще
SME Business Development Consultant
• Designed and implemented strategic action plans (SAP) for SMEs;
• Coordinated technical assistance with grant participants throughout the life of SME projects;
• Conducted due diligence study on financial, production and environmental risk assessment;
• Prepared and revised for due diligence and compliance documents for grants, sub-awards and subcontracts for review and approval by stakeholders and donors;
• Provided business advisory services including business plans with production and financial analysis to enhance the capacity of grantees to meet grant project requirements;
• Conducted full life cycle grant process management;
• Performed monitoring and evaluation of the managed program activities;
• Helped grantees develop efficient and commercially viable SMEs;
Январь 2013 — Май 2014
1 год 5 месяцев
LLC Tomskles, Private Kazakhstan company
Казахстан
Estimating Engineer
• Prepared full scope of work for accurate estimation by gathering proposals, blueprints, specifications;
• Identified labor, material, and time requirements by studying proposals, blueprints, specifications;
• Computed costs by analyzing labor, material, and time requirements;
• Resolved discrepancies by collecting and analyzing information;
• Maintained cost data base by entering and backing up data
Декабрь 2009 — Январь 2013
3 года 2 месяца
JVC AREVA (KATCO), Kazakhstan - France mining company
Cost Estimation Engineer
• Prepared Monthly Production Performance and Cost of Production reports;
• Conducted meetings with production directors (plant, drilling, exploration, logistics, site management) regarding actual costs deviations from budget in monthly basis;
• Was responsible for costs analysis for building projects;
• Prepared monthly cost & value reports, quarterly reports & cash flow information;
• Prepared cost calculation of construction project, monthly valuation;
• Interacted with Cost Center managers regarding to issues of materials flow, fixed asset, budgeting preparation and material consumption during construction phase;
• Was responsible for material management control process (goods receipt, issue, materials consumption);
• Provided comprehensive production cost analysis;
• Assisted General Directors in the construction budget optimization process;
• Performed comparative analysis of estimates for different specifications of the work package and developed at the optimal cost and specification as per standards set by company
• Prepared CAPEX/APEX cost control;
Декабрь 2008 — Ноябрь 2009
1 год
JVC AREVA (KATCO), Kazakhstan - France mining company
Шымкент
Budgeting Control Specialist
JVC AREVA (KATCO), Kazakhstan - France mining company
Шымкент
Budgeting Control Specialist
• Prepared Monthly Production Performance and Cost of Production reports;
• Prepared costs analysis for building projects;
• Liaised with stakeholders on commercial matters;
• Produced monthly cost & value reports, quarterly reports & cash flow information;
• Prepared tender and contract documents;
• Developed strong relationships with the clients and sub-contractors;
• Was responsible for material management control process (goods receipt, issue, materials consumption);
• Stock status control;
• Assisted General Directors in the construction budget optimization process
Май 2008 — Октябрь 2008
6 месяцев
Freelance interpreter
Алматы
Freelance interpreter
• Provided written translation of advanced technical documentation including mechanical;
• Provided finance and IT related subjects;
• Provided complex translation service;
• Have good knowledge of banking and economic terminology;
Навыки
Уровни владения навыками
Обо мне
- Provided reports to the management relevant to quantity surveying cost estimation reports-based CBS;
- Quantified all the materials needed to complete the construction projects- based on WBS;
- Interacted with contractors, planners and construction teams, cost center managers regarding to issues of materials flow, material take offs, bills of materials, fixed asset, material consumption during construction phase;
-Defined materials that are inconsistent with the contract documents and notifies the contractor for corrective action and follow-up until inconsistency is resolved;
-Provided tracking and materials&cost management of capital investment on projects and monitoring all project activities verification of work completed with regard to labor and material;
During the construction, I was involved in process of materials and cost controlling. I was responsible for managing all project costs from pitch to completion. I estimated the cost of construction for the processing plant, raw materials extraction units (BLOCKS), drilling fluids station, pipeline construction and the road construction. I provided undertaking costs analysis for building projects, which included estimating costs of digging a pit for construction, consumable construction materials, concrete, groundwork, construction phase, manpower and others. On the regular bases, I attended meetings and liaising with stakeholders on business matters.
I Inspected and then valued completed work with providing cost analysis of site resources (monthly cost & value reports, quarterly reports & cash flow information) to the management. I developed strong relationships with the clients and sub-contractors when prepared tender and contract documents. In cooperation with the planning department, I was involved in process of analyzing the drawings and determining all the materials required to accomplish the design. My technical background as the mechanical engineer (B.S. in mechanical engineering) will be a solid asset to insure multi discipline work accomplishment assignments as the Quantity Surveyor.
Высшее образование
2008
Высшее образование
Hamline University, St. Paul, Minnesota, USA
School of Business, Financial Management Department, Master’s Degree in Business Management
2003
Высшее образование
2003 - Saint Paul College, Minnesota, USA
Computer Science Department, Networking, Associate of Applied Science Degree, Networking , MicroSupport Specialist
1997
Высшее образование
East Kazakhstan Technical State University, Ust-Kamenogorsk, Kazakhstan
Mechanical engineering department, B.Sc, Mechanical Engineering
Знание языков
Гражданство, время в пути до работы
Гражданство: Казахстан
Разрешение на работу: Казахстан
Желательное время в пути до работы: Не имеет значения