Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was more than a week ago

Male, 35 years, born on 20 July 1990

Astana, willing to relocate, prepared for business trips

Electrical engineer

Specializations:
  • Design engineer

Employment type: full time

Work experience 13 years 6 months

January 2024currently
2 years 5 months

Almaty, aecom.com/

Construction, Real Estate, Architecture... Show more

Electrical Engineer
Designing and developing electrical systems and products Testing, maintaining and modifying existing electrical systems; Performing detailed calculations to establish standards and specifications; Ensuring projects meet electrical and construction safety regulations; Using specialist computer-aided design (CAD) and computer simulation software to create blueprints and schematics; Working with clients and contractors to ensure all electrical systems meet the desired specifications and requirements; Investigating and diagnosing problems, then providing recommendations for improvement of MEP systems; Writing reports and compiling data regarding existing and potential electrical engineering projects and studies; Keeping up to date with developments in the field of MEP engineering
March 2023January 2024
11 months
TAV Airports

Almaty, tavairports.com/

Multiprofile Asset Management... Show more

Head of Electrical Department
Uninterrupted power supply from the power system for radio and AGL (Airfield Ground Lighting) equipment supporting flight operations, as well as for the electrical and AGL system of production and passenger facilities at the airport; Organization and implementation of technical operation of power facilities of the Airfield Ground Lighting (AGL) system; Rational and economical use of electrical energy at the airport, including the distribution of electrical energy to organizations and residential consumers; Organizing the monitoring of the electricity consumption; Provide effective leadership and management of the Flight Lighting Department; Develop and implement organizational and technical measures aimed at improving labor productivity, reducing technical maintenance costs and achieving the technical and economic performance indicators of the services; Plan the development measures in the field of design, operation, and maintenance of electrical power supply schemes and equipment for Airfield Ground Lighting (AGL) systems in the airport.
November 2018November 2022
4 years 1 month
Arabtec Consolidated Contractors Limited. Abu Dhabi Plaza

Astana, www.arabtec-construction.com/en/about

Construction, Real Estate, Architecture... Show more

MEP Engineer(Utility Department Coordinator)
MEP Department Controlling quality of installation works, materials used, goods and equipment on permanent basis, their compliance with design documentation, technical conditions for connection to engineering mains and all external utilities, technical regulations, results of engineering survey, availability and correctness/accuracy of document records certifying their quality (passports, certificates, testing results) as well as documenting the results of incoming control. In a timely manner reveal defects and violations, notify the line Manager and the contractor of the same. Coordinating with Fuel and Energy Complexes and Utilities Department of Astana city and actively monitoring all the on-going MEP utility works on day by day basis and preparing progress reports to relevant parties. Ensuring compliance with local legislation for all the documents and progressed MEP utility works. Preparing and submitting technical documents to local authorities to get supply agreements for permanent power, water and heating supply for Abu Dhabi Plaza project.
June 2018November 2018
6 months
GATE (GAMA&TEKFEN)

Atyrau, www.gatekz.com/

E&I Workface Planning Engineer
Planning Department Reporting directly to Workface Champion and is responsible for the activities regarding planning matters of The Project Gathering the required data, verify the information collected and perform Installation Work Package (IWP) updates based on inputs received in SPC (Smart Plant Construction) software programme. Planning, organizing and coordinating the planning activities in detail to maintain a proper Installation Work Package management process regarding all aspects of the schedule. To maintain Installation Work Package measurement system in accordance with schedule activities and in compliance with the actual work performed.
September 2015May 2018
2 years 9 months

Astana, www.aecom.com

Construction, Real Estate, Architecture... Show more

Electrical Technical Supervision Engineer
AECOM, Abu Dhabi Plaza. Kazakhstan, Astana. MEP department Checking quality of installation works, materials used, goods, structures and equipment on permanent basis, their compliance with design documentation, technical conditions for connection to engineering mains and all external utilities, technical regulations, results of engineering survey, availability and correctness/accuracy of document records certifying their quality (passports, certificates, testing results) as well as documenting the results of incoming control. In a timely manner reveal defects and violations, notify the line Manager and the contractor of the same. Preparing non-conformance reports (NCRs) for electrical installation works. Actively monitoring all the on-going works on day by day basis and preparing progress reports to relevant parties. Checking of shop drawings and IFC drawings against contract specifications and technical regulations and issue the responded drawings with the relevant approval status. Ensuring compliance with local legislation for all the documents and progressed works. Participating in the internal and external MEP audits. Strictly monitoring the contract project schedule, red flagging any deviation to ensure that the works are carried within the project allocated time frame. Ensuring timely handover of spaces (technical rooms) and areas for equipment installation and participate in the handover of the same. Controlling, witnessing and recording all individual testing procedures of installed equipment and engineering networks. Compiling weekly and monthly external and internal reports, as well as any other specific reports as described within the scope of CSC.
May 2015August 2015
4 months
Renaissance Construction

Astana, www.rencons.com

Construction, Real Estate, Architecture... Show more

QA/QC MEP Engineer
Talan Towers. Kazakhstan, Astana. MEP department Supporting development and implementation of Project Quality Delivery Plan (overall integration of all project quality related processes - as per technical quality assurance, construction quality and fabrication quality, ITPs, inspection, HSE incident reporting & alerts). Coordination with the client representative on all quality matters. Undertaking quality inspections for all installed MEP works and implement the relevant QA/QC procedures at the site. Ensuring that the quality records, acceptance certificates, mechanical and electrical completion certificates and the documentation for specific systems and buildings/areas are prepared and collated in accordance with project requirements and standards. Coordinating with the commissioning department and all the site sub-contractors. Distributing relevant QA/QC documentation to site subcontractors. Controlling all non-conformances reports and undertaking of remedial action.
January 2014May 2015
1 year 5 months

Saint Petersburg, www.rencons.com

Construction, Real Estate, Architecture... Show more

Electrical Engineer
TOYOTA Motors. Russia, Saint Petersburg. Electrical department Organizing and participating in inspections of electrical works (LV and ELV systems) and submittal of comprehensive reports to Construction Supervision Consultancy (CSC). Ensuring that the quality records, acceptance certificates, mechanical and electrical completion certificates and the documentation for specific systems and buildings/areas are prepared and collated in accordance with project requirements. Translation and preparation of non-conformance report (NCR). Preparation as-built documentations to the client. Preparation BoQ (Bill of Quantity) in ITWO program. Oversee the preparation of O&M manuals.
September 2012December 2013
1 year 4 months
EKIN PROJE İNSAAT TAAHHUT ANONIM SIRKETI

Saint Petersburg, www.ekinproje.com

Construction, Real Estate, Architecture... Show more

Junior QC Engineer
International Airport Pulkovo. Russia, Saint-Petersburg, Mechanical department Preparation of as-built documentations on behalf of the customer and technical supervision. Organizing and participating in inspections and transmission of specific documents for internal plumbing and HVAC systems and advancing the same to general technical supervision. Translation and transmission of comments to relevant subcontractors as well as monitoring and controlling the comments close out process. Participation in mechanical commissioning works such as pumps, AHU (Air Handling Unit), FCU (Fan Coil Unit) and heat exchangers.

Skills

Skill proficiency levels
Внутренний контроль
Взаимодействие с надзорными организациями
Производственный контроль
нормативно-техническая документация
Выполнение технического надзора

Driving experience

Own car

Driver's license category B

About me

Ответственность, коммуникабельность, способность работать в команде, целеустремленность, готовность к обучению, легко обучаемость.

Higher education (master)

2014
Higher education (master)
Peter the Great St. Petersburg Polytechnic University, Master Degree.
Electric Power Plants and Power System Automation
2012
Higher education (master)
The Kazakh National Technical Research University, Bachelor Degree.
Electrical Engineering, Electrical Engineering and Automation of Technological Complexes

Languages

Kazakh — Native

English — C2 — Proficiency

Russian — C2 — Proficiency

Turkish — C2 — Proficiency

Uzbek — C2 — Proficiency

Citizenship, travel time to work

Citizenship: Kazakhstan

Permission to work: Kazakhstan

Desired travel time to work: Doesn't matter