Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was 16 minutes ago

Male, 33 years, born on 20 March 1993

Almaty, willing to relocate, prepared for business trips

Project Manager/ Project Engineer / Project Planner

Specializations:
  • Other

Employment type: full time, part time, project work/one-time assignment, work placement

Work experience 10 years 11 months

November 2024currently
1 year 6 months
Saipem
Project construction planner
TBD
September 2022July 2024
1 year 11 months
SAIPEM

Nigeria, www.saipem.com/en

Project Production Planner
Project Production planner for Nigerian LNG Project https://www.nigerialng.com/Train7-Project/Pages/Home.aspx
April 2021July 2022
1 year 4 months
SAIPEM

Moscow

Project Construction planner
• Maintain schedule with fabrication yards from Italy, Turkey, China • Liaising with PMT, Construction & Project Control Team members to keep updated the Level 4 Level 5 plan • Working with Power BI specialists to report • Gather and analyze information with feasibility engineers • Support Construction team with upcoming activities • Develop discipline timeframes. Piping / Structural / Equipment • Assist to MC completion manager with completed activities • Coordinate drawing / material updates from engineering • Verification of the constructability • Ensure the effectiveness of the Planning and Progress Control System, monitoring the progress measurement system and ensuring the proper information flow, progress status and completion forecast are assessed and reported for Engineering, Procurement, Fabrication, Construction and Commissioning phases • Update all Project Schedules, collecting actual data, evaluating forecast dates and monitoring any progress and productivity deviation compared with the baseline schedule, including the corrective actions taken by the PM • Create and maintain the 90 days look-ahead schedule, weekly, monthly. Isolate any adverse trend and warn the PM on time to take corrective actions, issue weekly and monthly project reports (internal and for the Client) • Assist the Project Control Manager in the Project Status Report preparation • Participate in the coordination meetings (internal or with the Client whenever opportune)
August 2019July 2022
3 years

Atyrau, www.linkedin.com/company/kpjv-limited/about/

IT, System Integration, Internet... Show more

3GP Project Module Integration Planner
• Negotiation with suppliers to identify the arrival dates and its carry over scopes from Aktau, Korea, Italy such as pre-assembled units/racks/skids/stair towers and equipment. • Work closely with construction/project management and international logistic to make efficient plans • Structural clashing scope elimination plans before modules set on foundation • Facilitate and participate in weekly schedule reviews • Develop and maintain summary level schedule reports: • Develop and maintain summary level schedule reports: Gantt, milestone charts, and other tools used to support critical path analysis, near-term tasks work, priority-based resource allocations, performance variances, and to support cost/schedule integration • Structural pitch plate and sea fastening cutting activity plan management on the stacking area • Modification of design plan, clash detection, constraint management. (Clash & interference check) • Follow to Site Queries SQ and Method Statements taken from fabrication side • Apply safety in design SID and technical solutions to contractors • Preparation of analysis with DCN (Design Change Notice) and ITCs (instruction to contractors) • Construction work package releases. (Stacking, Hook-up, Carry Over planning and its management) • Integrate multiple schedule s into a master project schedule, base line, status, and perform measurement baseline Lookahead plans up to 90 days • Communication with contract department and contractors to plan carry over scopes • Material availability management in regards to all disciplines • Provide constriction work packages/plans to business partners via PDDM • Making sure necessary BOM materials picked up from warehouse. Constraint management • Making sure business partners split in proper installation work packages with available materials and follow to the ASME drawing standard. • Review/Check IFC (issued for construction documents) work packages and sign • Preparation of HOP (Hand Over Package Documents) scopes • Punch list clearance plan of mechanical completion &Turnaround • Close out planning and statistic information in accordance with KPI
May 2019August 2019
4 months
Arctic Group International

Atyrau

Construction, Real Estate, Architecture... Show more

Project Coordinator
• Working alongside project managers to complete construction proposals, quotations • Co-ordination drilling equipment relocation activities and its cost • On-going tracking and reporting of project progress and costs. • Scheduling of construction activities • Coordination of project activities with project management team. PMT • On-going risk management of all aspects of projects including mechanical completion. • Set up of new projects and jobs in line with internal and client procedures. • Break projects into doable actions and set timeframes • Prepare budgets and analysis risks and opportunities • Use tools to monitor working hours, plans and expenditures • Project close out & turnaround
January 2018May 2019
1 year 5 months
Ersai Caspian Contractor LLP

Aktau, www.ersai.kz/

Construction, Real Estate, Architecture... Show more

Field Engineer (Structural/Piping)
• PAR (Pre-Assembled Rack) Fabrication/construction in accordance to blueprints, technical drawings • Follow to CWP (construction work pack) and IWP (installation work pack). • Prepare engineering drawings & design for construction to support installation maintenance and modification • Planning of raw steels fabrication structures, its quality check, and transportation to the erection sites. • Structural module preparation and design change implementation & Safety in Design • Pre-commissioning, commissioning scope identification • Planning and preparing work scope instructions packages for fabrication and installation of piping, tubing, structural beams and mechanical equipment for various mechanical systems and maintenance as generators HVAC. • Monitoring the construction process with its BOM (Bill of materials) • Mechanical Completion and punch list clearance, work with mechanical completion team • Ensuring all building codes and applicable regulations are followed according to ASME standards • Supports employees in the installation and inspection of piping/structural beams, valves, equipment, and components using approved construction procedures and specifications • Assisting with CoW (Carry over work) packages with material registers in order to deliver materials to Tengiz to execute incomplete activities • Develop, coordinate, and monitor all aspects of construction, fabrication, and operation • Working with production planning team and mechanical completion in to deliver documents in time
June 2017January 2018
8 months
Ersai Caspian Contractor LLP

Aktau, www.ersai.kz/

Project development specialist
• PAR (Pre-Assembled Rack) Fabrication for Future Growth Project • Implement major time frame changes in all aspects. Engineering/Production Planning Control «PPC»/Fabrication • Create effective strategic planning methods for current Future Growth Project • Consult with management personnel and other leadership to identify business processes. • Identify and evaluate business initiatives to ascertain appropriate programs that meet company goals. • Develop methods for data file formatting, data analysis methodologies, and management reporting. • Project deadlines. • Develop methods of measuring if performance management aligns with organizational goals. • Creation a new policy related to Key Performance Indicators if required
January 2017May 2017
5 months
The Society of Petroleum Engineers

Almaty, www.spe.org/

Member
The Society of Petroleum Engineers (SPE) is a not-for-profit professional organization whose mission is to collect, disseminate, and exchange technical knowledge concerning the exploration, development and production of oil and gas resources and related technologies for the public benefit and to provide opportunities for professionals to enhance their technical and professional competence
October 2015January 2017
1 year 4 months
«Arctic Group International» LTD

Atyrau, www.arctic-group.com/

Transportation, Logistics, Warehousing, International Logistics... Show more

Field interpreter
• Converting of the information from one (English/Russian/Kazakh) spoken language into another • Relocation, assembling and disassembling of the drilling rigs in the oilfield of TCO «TengizChevroil» • Responsible for translation of the Pre-job Daily & H2S • BOP & Fire drills' meetings • Translation of the Job Safety Analysis • Rig Activity Reports, records & maintenance of contractors' time sheets • Rendering and assistance in coordination of work activities between rig managers, tool-pushers and truck-pushers during rig up/down procedures
January 2015April 2015
4 months
«Lexvolt» LTD

Almaty

Electronics, Tool Engineering, Household Appliances, Computers and Office Equipment... Show more

Sales manager
Working with telecommunication and electrical equipment. Maintaining,negotiating and improving relationships with the clients. Sales targets and coordinating sales projects
June 2014July 2014
2 months
Intergas Central Asia JSC

Atyrau, www.intergas.kz

Oil and Gas... Show more

Field engineer assistant
• Work under the supervision of the oil/gas extraction field engineer • The scope of work included the monitoring of the wells, collection of technical data • Work under the supervision of the engineer in a control point • To ensure the safe and proper operation of the equipment and machinery on the meter units, • Repairs • Monitoring. Making sure the flow of oil and gas does not stop • Checking gauges on the measuring station
June 2014June 2014
1 month
Buzachi Operating Ltd

Aktau

Oil and Gas... Show more

Operation engineer assistant
• Monitoring and control of the gas compressor station • Obtained the primary practical experience in the linear operation of the main gas pipelines • Observed the support work of the gas pipelines and conduct of the compressors’ operation in the gas transmission stations • Operate compressor engines, pumps and auxiliary equipment in a way that allows for appropriate flow of gas • Collect gas samples for laboratory testing • Keep records of meters and gauges reading to determine the temperature, amount of gas receive and dispensed, pressure and consumption rate variations • Maintaining, troubleshooting, repairing and operating compressors
June 2013July 2013
2 months
ALMASGEO LLP

Karaganda, almasgeo.kz

Mining Industry... Show more

Driller assistant
• Preparation and conduction of the drilling works in the field environment, extraction of the rock samples • Repair or replace tools if necessary • Keep the rotary and rig floor clear of mud and other materials that could create slip and trip hazards • Moving and manipulating pipes and drill stems. • Maintain mud properties as determined • Monitoring of mud pit level. Loss or gain

Skills

Skill proficiency levels
MS Office
Microsoft Access
Грамотность
MC Excel
Английский язык
Работа в команде
MS Outlook
Управление проектами

About me

Personal skills: Have an analytical thinking, fast learner, , self-disciplined, communicative and being able to quickly get on common terms with colleagues and management personnel, even-tempered, diligent and responsible, constantly work on self-education and professional growth. Interests: Sports – athletics, basketball, swimming, scating; board games: chess, checks, backgammon; reading of fiction and historical literature.

Higher education

2015
Higher education
Operation and service of oil and gas fields, Oil and Gas

Languages

Kazakh — Native

English — C2 — Proficiency

Russian — C2 — Proficiency

Citizenship, travel time to work

Citizenship: Kazakhstan

Permission to work: Kazakhstan

Desired travel time to work: Doesn't matter