Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was more than two weeks ago

Male, 34 years, born on 18 June 1991

Astana, willing to relocate (Other), prepared for occasional business trips

Project Engineer

Specializations:
  • Production engineer, quantity surveyor
  • Construction project manager

Employment type: full time

Work experience 12 years 9 months

August 2025November 2025
4 months
Tecnimont Head Office - Milan, Italy
AWP Engineer - traineeship
♦ Participated in the development and execution of the 30% 3D module review for the Silleno project, ensuring design accuracy, constructability, and alignment with project objectives. ♦ Reviewed Issued for Review (IFR) drawings and coordinated necessary updates to produce Issued for Construction (IFC) drawings. ♦ Developed IWP form to track all necessary items such as QVD number, PTW number, Material description / Qty, Drawing list. ♦ Coordinated and prioritized activities of subcontractors “BI Industrial” and “Intertasco” to ensure the smooth commencement of piling works on site. ♦ Review Project Schedule and prioritize the work according to material delivery date (ETA).♦ Preparation all Tender documentation, including financial reports, execution dates and details. ♦ Develop and check Procurement Orders according to the Project schedule and Milestones.
November 2023February 2025
1 year 4 months
Tengizchevroil (Chevron, ExxonMobil, Lukoil, KMG) – Kazakhstan, Tengiz field

tengizchevroil.com

Completion Engineer / System Owner
♦ Successfully lead the pre-commissioning and commissioning activities for multiple sub-systems, ensuring safety, schedule adherence, and quality standards. ♦ Coordinated with contractors and Siemens to fast-track commissioning, completing DGS (Dry Gas Seal) & Coupling installation, Solo / Load run of Air coolers, LO (lube oil) flushing, Pipe alignment, Foot checks and 110 kW Transformer Energization 2 weeks ahead of schedule. ♦ Oversaw the Start-up and Commissioning of Glycol / Water Motor Cooling system and Start-up & Reliability Run of 40 MW ASD drive Main Motor in the 3GP Wet Sour Gas Area, ensuring system integrity and compliance with operational standards. ♦ Performed rigorous testing and validation of systems, from Substation to process and utility systems, guaranteeing operational integrity and reliability prior to startup ♦ Manage all Technical Queries (TQs), Non-Conformance Reports (NCRs), DCN-RFIs, Management of change (MOCs) related to the Commissioning scope
December 2018November 2023
5 years
Tengizchevroil (Chevron, ExxonMobil, Lukoil, KMG) – Kazakhstan, Tengiz field

tengizchevroil.com

Project Engineer / AWP Engineer
♦ Develop detailed project plans, schedules, and resource allocation using WBS (Work Break Down Structure): Unit (Level 1), CWA (Level 2), CWP (Level 3), IWP (Level 4). ♦ Assign available materials according to Construction Work Package (CWP) priorities.♦ Coordinate between engineering teams, contractors, and stakeholders to ensure smooth execution. ♦ Review engineering designs, drawings, and specifications for accuracy and compliance (from IFR to IFC stage). ♦ Attained the mechanical completion milestone, significantly advancing the Utilities, Reception, Gas Turbine Generators (GTG) scope ahead of the projected timeline. ♦ Monitor construction/production processes to meet quality standards. ♦ Lead discussions and meetings to identify, address, and resolve project constraints, ensuring uninterrupted progress. ♦ Engaged with the Engineering department to expedite the resolution and closure of Technical Queries (TQs) ♦ Successfully established the Advanced Work Packaging (AWP) Program ♦ Facilitated and packaged over 1 million man-hours of Installation Work Packages (IWPs) in the 3GP Blue area ♦ Collaborated with contractors to expedite Equipment installations in the Pressure Boost Facilities (PBF), which resulted in meeting critical project milestones ahead of schedule ♦ Recognized by the Project Manager for achieving significant cost savings on Carry Over Work (COW), reducing the work scope by $5 million, and ensuring early delivery of systems to the Systems Completion team.
October 2012December 2018
6 years 3 months
Tarbagatai munay
Mechanical – Piping Technician / Engineer
♦ Maintenance, Installation, and Start-up of mechanical equipment, steel structures and installation of large bore pipe, according to the Quality & Safety standards ♦ Installation of small and large bore pipe ♦ Achieved zero-incident rate during site execution, exemplifying commitment to safety. ♦ Supervision of the contractor's complex work to install a 60-inch pipe (19 m; 34 tons) - a total of four big bore pipes installed. ♦ Supervision of complex work - installation of steel structures in the amount of 1508 tons at area 41B and 472 tons in are 51C. ♦ Supervision of contractor to install big bore pipes up to 48”. ♦ Supervision of valve installation and Bolt flange assembly management (with the hydraulic method) up to 48” ♦ Drive (HSSE) standards, procedures, rules and regulation – JSA, PPHA, Permit to Work, SimOps ♦ Establishing an ethic working relationships with multicultural team within the company and with contractors, as well as practice of "zero tolerance" principal on a permanent basis

Skills

Skill proficiency levels
Исполнительность

Higher education

2014
Higher education
Design and construction of oil and gas facilities, Master of Design and construction of oil and gas facilities
2013
Higher education
Polish Technical University, Poland
Engineering and Technical Faculty, Petroleum Engineering
2012
Higher education
Petroleum Engineering, Bachelor of Petroleum engineering

Languages

Kazakh — Native

English — C2 — Proficiency

Russian — C2 — Proficiency

Citizenship, travel time to work

Citizenship: Kazakhstan

Permission to work: Kazakhstan

Desired travel time to work: Doesn't matter