Больше информации по резюме будет доступно после регистрации

Зарегистрироваться

Male, 41 year, born on 18 December 1984

Astana, willing to relocate (Azerbaijan, Belarus, Georgia, Other regions, Kazakhstan, Kyrgyzstan, Russia, Uzbekistan, Ukraine), prepared for business trips

Manager, Supervisor, Lead, Commissioning

2 000 000  in hand

Specializations:
  • Other

Employment type: full time, part time, project work/one-time assignment, volunteering, work placement

Work experience 25 years 1 month

January 2017currently
9 years 5 months
Technip Russia STL

Russia

Oil and Gas... Show more

Process Commissioning Engineer (Trains) Yamal LNG Project
 Responsible for air blow, steam blow, water flushing pump and compressor test runs with inert fluid, including refractory dry out and hydrocarbon introduction. Pre-commissioning, commissioning and start up activity, including coordination and supervision of vendor’s activities.  Issuing and follow up the procedure of steaming, chemical cleaning and preservation of equipments.  Inspect & test tanks and internals, supervise vessel internals installation, including trays, weirs & packing.  Air Blow, Water Flushing, Steam Blow, Pump & Compressor Test run with Inert fluid, Operational Tightness Test, Inerting  Refractory Dry out, Hydrocarbon introduction  Responsible for isolation registers during commissioning phase.  Administer permit to work procedure prior to operations handover.  Provide a full briefing of vendor’s procedures and field training for all subordinated personnel in order to improve the technical knowledge.  Prior to client commissioning activities as lubrication & preventative maintenance, motor solorun and dynamic testing.  Performing MOP and GALT testing  RFC walk downs  AGR unit hot water circulation MS preparation  HO Hot oil circulation MS preparation  General Method statements preparation  Site Instructions for subcontractors  Critical lines identification and inspection  Catalyst Loading MS and follow up Dehydration and Mercury adsorbers  Preparing and clearing Punchlist, performing pre-commissioning and commissioning activities of the plants.  Preparing test packs for air blowing, mechanical cleaning and big bore pipe inspections  Performing air blowing, mechanical cleaning and big bore pipe inspections  Functional testing of ESD and Control loops
January 2016December 2016
1 year
DANIELI company , Italy

Metallurgy, Metalwork... Show more

Lead Commissioning Supervisor DRI Gas Plant
 Mechanical Completion Systems identification (During project development in Italy)  Provide coordination and leadership to the start-up/testing and commissioning program from initial plan development through execution of the construction turnover, testing, start-up, commissioning and turnover to operations for the defined project scope. Responsible for air blow, steam blow, water flushing pump and compressor test runs with inert fluid, including refractory dry out and hydrocarbon introduction.  Organize commissioning activities: make sure the assigned team matches the project content and schedule.  Air Blow, Water Flushing, Steam Blow, Pump & Compressor Test run with Inert fluid, Operational Tightness Test, Inerting  Refractory Dry out, Hydrocarbon introduction  Develop detailed project specific start-up/testing and commissioning plans and schedules for incorporation in to the overall project plan and schedule and follow it up.  To coordinate plant tests: start-up of the plant and coordination of mechanical tests (solo-run, cold test hot tests), electrical (solo-run, cold test, hot tests tests).  Program preparation for water flushing CW, QCW, KW circuits  Program preparation for air blowing for gas lines  Performing NG, PG compressors cold test and refurbishment activity  Coordination of contractual reception tests with customer: adequacy with contract, turnover to customer without defects, follow-up of punch list items.  Coordination of preliminary checks on functional systems: adequacy of as built systems with commissioning documentation, put under fluid, under voltage, control of results in the respect of the Company process.  Coordination of plant tests: start-up of the plant and coordination of mechanical tests, electrical tests, on load tests.  Coordination of contractual reception tests with customer: adequacy with contract, turnover to customer without defects, follow-up of punch list items.  Coordination of activities with an impact on commissioning: correlate the different phases and the project scope, anticipate the personnel needs from the Company and external companies if part of the commissioning is subcontracted.  Preparation of “end of erection strategy” and coordinate with construction team to apply it. Coordinate the functional systems turn-over to commissioning.  Identification and analyze technical problems: watch for defects and find solutions, ask for adequate technical support, report problems.  Writing weekly commissioning reports  Follow-up non conformities, as-built documentation.  Provide start-up/testing and commissioning focused input into the construction planning and work scheduling.  Creating the project specific Construction Turnover Package templates for contractors.  Creating the project specific testing, start-up and commissioning procedures.  Executing the testing, start-up and commissioning program.  Preparing and conducting testing, start-up and commissioning related training.  Completing turnover of tested systems to the plant operations.  Coordinating training with Plant Facilities Manager and/or client specified personnel.  Coordinating Commissioning Craft Labor needs with Lead Construction Field Engineer and/or construction contractors.  Managing Construction Turnover and System Turnover process.  Identifying lock out/ tag out plan to be used during transition from construction to commissioning care custody and control
March 2014December 2015
1 year 10 months
DANIELI company , Italy

Egypt

Metallurgy, Metalwork... Show more

Commissioning Coordinator DRI Gas Plant
Project : Egypt, EZZ Steel Gas Direct Reduction Plant (DRI) Responsibilities:  Mechanical Completion of all systems  Preparation of Installation, Commissioning and Maintenance Procedures. (During project development in Italy)  Systems identification (During project development in Italy)  Track Changes and Queries against Systems, Areas, Work-packs and documents.  Preparation of Cold test certificates and submission to client  Mechanical Completion data base tracking and updating  Provide Overall status of Systems and Areas, including Outstanding Work and Punch lists.  Report status of handover from Construction to Pre-/Commissioning and from Commissioning to Operations.  Reporting of a "ready status" for loop/circuits testing and interlock matrix Responsible for air blow, steam blow, water flushing pump and compressor test runs with inert fluid, including refractory dry out and hydrocarbon introduction.  Priority settings to identify critical items or systems.  Interface handling, between contractors, sub-contractors of system and areas.  Submitting to client documentation via DDMS software  Site surveys and meeting with client  Punch List management and reporting  Produced detailed reports on plant trips and equipment cold/hot start-up reports as part of the process team including the following: Steam blowing report, PG heater & Reactor Dry-out report, Flue Gas Fan Turbine, Combustion Air Fan Turbine, Boiler Feed Water Pump Turbine and Process Gas Compressor Turbine No-Load & Load test Reports and CO2 system cold & hot washing report  Assist to HYL technological partner for preparation of training and maintenance procedures  Assist to HYL technological partner for develop detailed plans for run-in and run-out of shutdown together with planning individual work scopes within the shutdown including pre shutdown, execution and post shutdown activities. Worked with following equipment: - Natural Gas Steam Reformer commissioning and startup - Process Gas Heater commissioning and startup - Compressors for cooling gas and process gas commissioning and startup - Reactor commissioning and startup - Quenching system - Material Handling and Dedusting System - CO2 removal system commissioning and startup
November 2013March 2014
5 months
DANIELI company , Italy

UAE, www.danieli.com

Metallurgy, Metalwork... Show more

Shut-Down Coordinator DRI Gas Plant
Project : Abu Dhabi Emirates Steel Direct Reduction Plant ( Gas DRI) phase 2 Responsibilities:  Preparation and integration of all shutdown works in the overall shutdown plan  Ensure complete shutdown and startup procedures are in place in a timely manner so that training can be completed at least one month prior to shut down  To ensure optimal blind lists and blinding plans (i.e. sequence, fresh air needs and scaffolding) are developed and issued to meet the SD milestones  Oversee the SD operations prep and PTW process to ensure equipment preparation, blinding and permitting is completed in a safe and efficient manner  Job Method of Statement and detailed risk assessments related to shutdown activities preparation  Prepares the forecasts of manpower requirements for shutdowns  Monitoring and reporting of shutdowns activities where data base update is required.  Participate in the chemical cleaning/decontamination/inertisation planning  Supervise activity of - Reformer and Hydro -Desulphurizer units catalyst replacement  Define and organize the logistics requirements for shutdowns  Closing of Defect Reports and Nonconformity queries  Cold test execution of new Cooling gas and Pneumatic transport compressors  Process Gas Separator chevron replacement coordination with confined sparse detailed procedure.  Steam Reformer burners change out  Assistance to the client operation team for cold startup of the DRP plant  Performance of Process Guaranty Test after plant SD and revamping
October 2011October 2013
2 years 1 month
DANIELI company , Italy

Iran, www.danieli.com

Metallurgy, Metalwork... Show more

Concentrator Plant Commissioning & Startup Supervisor
Project- Sangan Iron Mine Project IRAN Concentrator Plant Responsibilities: Commissioning and Start Up of following systems:  2.6 Million Ton/Y iron ore beneficiation plant operation.  Natural iron ore crushing by Gyratory crusher and 1st 2nd 3rd grinding systems.  AG mill and Ball mill - 6750 kW (CEMTEC),Tower mill-1120 kW X5 (EIRICH) etc operation to get optimum size of material.  Cluster Cyclones operation to separate the optimum size of fine material.  Cobber, Rougher, Scavenger, Finisher LIMS operation to separate Fe3O4.  Plough feeder and Reclaim conveyor operation.  Crusher, screener, de-duster, vi-bro feeder, diverter chut, conveyor belts operation.  2.1 Million Ton/Y tailing separation from Iron concentrate.  Rougher, conditioner, cleaner and scavenger flotation cells using to separate sulfur.  Proper chemical such as SIPX, NaSH, MIBC, Na2Co3 dossing in flotation cells.  Thickener and under flow pumps operation..  High capacity slurry pumps operation for product transport and de-watering.  Flow, pressure, density, level, PH, vibration etc.  Flocculent, coagulant, PAA etc. adjustment for recovery water from tailings.  Pinion, bearing and hydraulic oil pump operation for big machines.  Ore transfer by different conveyor belts, plough feeder operation.  Crusher (Gyratory Pebble), screens, magnetic separator etc. operation.  Flotation cells operation to remove sulfur by proper chemicals dossing..  Air compressor, cooling tower and high capacity slurry pumps etc. operation.  ALL PROCESS DRIVEN BY – Siemens and Allen Bradley PLCs Due to contractual obligation I have performed client personal site and classroom trainings. Total number of participants from 20 to 40 people where training includes:  General process overview training ( Process flow diagram, beneficiation & grinding basics, material handling basic, thickening and tailing basics etc.)  P&ID training (Symbols and identifiers, Line Symbols, Understanding process using P&ID, Usage P&ID on site)  Plant safety training basics (Emergency Action Plans, PTW, Housekeeping, Lock out Tag out, Emergency escape etc.)  Plant startup training ( Conveyor system start up, plant startup with water, material feed sequence, troubleshooting)  Basic mechanical training  Process control scheme overview  HMI training basics  Site walk around training for each area, Material handling, primary grinding, secondary grinding, tertiary grinding, Filtration units, Auxiliaries.
January 2010October 2011
1 year 10 months
GRANITE SERVICE INTERNATIONAL [GE Energy affiliate]

Almaty, www.gsinc.com/

Industrial Equipment, Machine Tools and Components... Show more

Gas Turbines Outage Coordinator
Responsibilities:  Coordinate outages to ensure safe and reliable operations for GE compressors.  Providing support to all levels of management and personnel  Performs outage planning with SM’s to ensure the right crews are assigned for successful and timely completion of each work scope.  Verifies employee readiness for execution of assigned tasking.  Develops and manages training programs in order to reach and exceed industry standards while preparing the employee for future assignments.  Minimize the cost of bench time due non-working retained resources  Partner with customer and SM’s for strategic capacity planning.  Manage field employees; including support to the HR and stressing safety requirements  Addressing daily employee needs and requests  Oversee the mobilization/demobilization process for field employees  Maintain positive employee relations and resolve employee performance issues in a timely manner  Ensure accuracy of mobilization logistics and job data in all databases  Obtain complete job mobilization data, employee feedback, and weekly reports, employee and site safety issues supporting the HSE department
May 2008January 2010
1 year 9 months
GE (General Electric)

Astana, www.ge.com

Heavy Engineering... Show more

Commissioning Engineer
Project: KTZ Kazakhstan Maintenance Service Agreement Coordination of Maintenance activities Responsibilities: Coordination of Commissioning and Maintenance activities. I commissioned and put in service new fleet of locomotives, performing installation and dismantling of diesel engines 7FDL, EVO, Traction motors, GE locos control system. I passed USA Technical Director extension courses in Pennsylvania, Erie.
July 2007May 2008
11 months
JRay McDermott

UAE, www.mcdermott.com

Construction, Real Estate, Architecture... Show more

Off-shore Platforms Production Engineer
Project: Pearl GTL (SHELL) The Pearl GTL Project consists of two offshore platforms, associated wells and two pipelines feeding a two-train Gas to Liquids (GTL) plant located within Ras Laffan City (RLC), which is located 75km north of the Qatar capital, Doha. The plant will produce approximately 140,000 bbl per day of liquid synthetic products from natural gas and will be constructed in two phases. Job description: • Assistance and co-ordination with the fabrication superintendent. • Co-ordination with other departments. • Review 4 week look ahead. o Participate in weekly meetings with senior production engineers for progress, 4WLA & job planning. • Out of sequence activity planning. • Weekly fabrication progress reporting. • Visit the site on a daily basis. Check the work in progress . If a team is preparing work out of sequence or incorrect. • Review and provide input to secondary cable routing (branch cable trays, channel trays, single tubing) where detailing not done. • Advise fabrication crew location of small E&I equipment’s which are not sufficiently detailed in the AFC drawings. • Issue materials to Yard as required. o Identify material shortages and raise requisitions as required. Monitor and follow up , o of outstanding materials. • Raise revision order.
April 2007July 2007
4 months

Atyrau

Oil and Gas... Show more

Utilities Maintenance Supervisor
Job overview: • Operation and Maintenance of sewage and water treatment plants supplying water to residential camps • Operation and maintenance of gas boilers • Running of Irrigation project • Supervision of personnel fulfilling maintenance and remedial activities • Supervision and coordination of water/ sewage lines repairs. • Water storage tanks cleaning and disinfection • Effluent water storage tanks cleaning. • Making sure all works are completed with high Safety standard and in accordance to Client requirements.
September 2005April 2007
1 year 8 months
PFD [Parsons- Fluor- Daniel LLC]

Atyrau

Construction, Real Estate, Architecture... Show more

Refinery Commissioning Junior DCS Engineer
Commissioning and Pre-Commissioning department - Tengiz Asset Development Project Kazakhstan Second Generation Plant (SGP) Project role: Current position involves leading a team of field technicians, vendors and subcontractors to provide project wide pre-commissioning and commissioning activities. These activities include site acceptance tests, communications and bitmap verification, system integration, loop checking field IO, ESD and F&G cause & effect testing and facilitating system handover to the client. Further general responsibilities include organizing vendors, managing subcontractors, interfacing with construction and various other disciplines, resolving problems with engineering, troubleshooting problems in the field and liaison with the client. This has further required working independently without supervision, leading and directing multiple teams of technicians, communicating clearly both verbally and in writing with other project personnel from other nationalities
August 2002August 2005
3 years 1 month
ECB

Aksay (Kazakhstan)

Oil and Gas... Show more

Control Room Operator of HP Boilers DCS (with promotion to Supervisor)
Working with the following system : • Steam generation system HP Boilers MACCHI 4x115 t/h,40 bar,400 t • Fuel gas and diesel facility , scrubber and booster pumps • Steam Turbine Generator MAN™10.5 Mw, back pressure, 40/5 bar, 400/170 t • Let down station from HP/MP and HP/LP, MP 20 bar, LP 20 bar and correction of temperature(desuperheater) an according with parameters of customer • Water treatment Sand filters, Reverse osmosis, Mixed bed filters, two trains 60 m3/h each • Regeneration and waste water treatment, chemical facility • Condensate recovery system, flash drums, activated carbon filters, storage tanks • Boiler feed water unit, Atmospheric deaeratoers, chemical facilities(Oxygen scavenger, Corrosion inhibitor) Boiler feed water pumps driven by electrical motor Ingersoll and steam turbine Dresser Rand ALL PROCESS DRIVEN BY DCS – Honyewell, Rock well, Turwin
May 2001August 2002
1 year 4 months
ECB

Aksay (Kazakhstan)

Oil and Gas... Show more

Field Operator HP Boilers
Working with the following system : • Steam generation system HP Boilers MACCHI 4x115 t/h,40 bar,400 t • Fuel gas and diesel facility , scrubber and booster pumps • Steam Turbine Generator MAN™10.5 Mw, back pressure, 40/5 bar, 400/170 t • Let down station from HP/MP and HP/LP, MP 20 bar, LP 20 bar and correction of temperature(desuperheater) an according with parameters of customer • Water treatment Sand filters, Reverse osmosis, Mixed bed filters, two trains 60 m3/h each • Regeneration and waste water treatment, chemical facility • Condensate recovery system, flash drums, activated carbon filters, storage tanks • Boiler feed water unit, Atmospheric deaeratoers, chemical facilities(Oxygen scavenger, Corrosion inhibitor) Boiler feed water pumps driven by electrical motor Ingersoll and steam turbine Dresser Rand ALL PROCESS DRIVEN BY DCS – Honyewell, Rock well, Turwin

Skills

Skill proficiency levels
commissioning
lng
Oil And Gas
process
completion
DRI
manager
PID
mechanical completion
Start-up project
Project management
Leadership Skills
Strategic Planning
Работа в команде

Driving experience

Own car

Driver's license category B, C

About me

Service management in Oil and Gas sector

Higher education

2005
Higher education
WKTU (West Kazakhstan Technical University)
Oil and Gas /Gas &Oil field development , Diploma

Languages

Russian — Native

English — C2 — Proficiency

Italian — B2 — Upper Intermediate

Professional development, courses

2009
Technical Director extension courses
GE Transportation, Diploma

Citizenship, travel time to work

Citizenship: Kazakhstan

Permission to work: Kazakhstan

Desired travel time to work: Doesn't matter