Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Online

Male, 38 years, born on 22 April 1988

Uralsk, willing to relocate, prepared for business trips

Mechanical Completion Engineer

950 000  in hand

Specializations:
  • Project manager

Employment type: full time

Work experience 10 years 9 months

January 2026currently
4 months

FMCG (non-edible)... Show more

Mechanical Comletion Engineer
- Weekly Reporting of the mechanical completion activities in site - Coordinating Mechanical completion activities with Subcontractors - Coordinate all RFI related to all site activities (Civil, E&I, Welding, Coating, etc.) - Update & Follow-up Mechanical completion register/Database - Manage closure of any NCR that may arise related to Mechanical completion activities
August 2023December 2025
2 years 5 months
KCOI
Mechanical Completion Coordinator
- Weekly Reporting of the mechanical completion activities in site - Coordinating Mechanical completion activities with Subcontractors - Coordinate all RFI related to all site activities (Civil, E&I, Welding, Coating, etc.) - Update & Follow-up Mechanical completion register/Database - Manage closure of any NCR that may arise related to Mechanical completion activities
October 2021March 2023
1 year 6 months
CCEP
Mechanical Completion Engineer
- Monitor subsystem/system progress in coordination with SC Coordinator and conduct subsystem walk down - Uploading RLMU drawings in e-WD Dossier - Responsible for delivery (Construction to MC) of their assigned subsystems - Attend the MC walk down - Agree on the categorization of punch items and responsible for closing PL following SC punch list closeout procedure. Also, accountable to resolve disputed punch items - Coordinate with Construction, Engineering, QC, Certification and RA
July 2021September 2021
3 months

www.velesstroy.com

Construction, Real Estate, Architecture... Show more

Mechanical Completion Engineer
- Conduct daily meetings with the Mechanical System Completion team to update QVDs, open Punches - Conduct Pre-Walkdown, Walkdown indentify and elimination Punches, preparing necessary documents for conduct Pre-Walkdown and Walkdown (Notice and Pack Index, Systemazed drawings, Redlines, Final Punch List) - Conduct weekly Punch List Closure meeting - Close out Punch list, outstanding QVDs
January 2020March 2021
1 year 3 months

Kazakhstan, www.bolashak.com

Business Services... Show more

Productivity Engineer
- Improve and analyze the progress of construction works - Training the construction team of effective use of the progress board - Conduct daily meetings with the construction team to update production plans and discuss further work fronts - Conduct weekly meetings on the progress of construction work with the participation of persons directly responsible for the work (Site manager, construction foreman of contracting companies) - Provide weekly and monthly updates to company and contractor management. - Providing reports to the Company's Management of materials flow
April 2019November 2019
8 months

Construction, Real Estate, Architecture... Show more

Project Production Control Engineer
- Enable and facilitate a production team to create and update daily production plans using CVX|PM - Facilitate the development and ongoing updating of production schedules (weekly/monthly) with participation from those directly responsible for the work (e.g., construction managers, superintendent, foremen) - Support the implementation and process of controlling onsite supply flows for selected materials to the point of installation using CVX|PM - Enable work optimization for the effective completion of milestones through analysis and reporting of CVX|PM production analytics - Provide weekly and monthly updates to company and contractor management.
May 2016March 2019
2 years 11 months
IP Kussainov
Individual entrepreneur
- Searching potential clients - Consulting clients for choosing from assortments
December 2014April 2016
1 year 5 months
Tecnomare
Piping engineer
- Elaborate single sections of project on Kashagan and Karachaganak fields - Perform design activities on designing of mechanical part and piping on stages of FEED on field - Carry out calculations on sizing and characterization of equipment’s - Participate in execution of drawing works on AutoCAD

Skills

Skill proficiency levels
Advanced level
Engineering
FEED
P&ID
Piping
Pipeline
Oil And Gas
Пользователь ПК
MS Outlook
MS Internet Explorer
Internet
Английский язык
MS Excel
Medium level
AutoCAD
NavisWorks
MS SQL

Driving experience

Own car

Driver's license category B

About me

Hardworking: Done with energy, industrious People-oriented: Enjoy working/being with people

Higher education (master)

2014
Higher education (master)
Oil and Gas Department, Engineering, Construction and Operation of Oil and Gas Pipelines and Oil and Gas Storages
2012
Higher education (master)
Oil and Gas Department, Engineering, Construction and Operation of Oil and Gas Pipelines and Oil and Gas Storages

Languages

Kazakh — Native

English — C1 — Advanced

Russian — C1 — Advanced

Citizenship, travel time to work

Citizenship: Kazakhstan

Permission to work: Kazakhstan

Desired travel time to work: Doesn't matter