Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas more than two weeks ago
Male, 35 years, born on 5 December 1990
Almaty, willing to relocate (Kazakhstan), prepared for business trips
Electrical engineer
Specializations:
- Design engineer
Employment type: full time
Work experience 13 years 9 months
February 2017 — currently
9 years 4 months
Tengizchevroil, LLP
Atyrau, www.tengizchevroil.com
Oil and Gas... Show more
Engineer ETL
▪ Maintenance, repair and execution of electrical installations of the Plant Facilities on Tengiz field
▪ Check protection settings and testing different types of electrical equipment 0,4/0,66/10/35/110 kV (Power and measuring transformers, HV and LV switchgears, HV сircuit breakers, HV and LV electrical motors, Cubiclies of control, Power & Trace heating cables, Frequency converters, UPS systems)
▪ Maintenance and testing of relay protection and automation equipment based on relay series GE, SEL, Sepam, Micom and others
▪ Maintenance frequency drives VFD
▪ Test transformer oil, personal protective equipment and arresters
▪ Work with TCO project documentations, electrical drawings and procedures of maintenance, insert As-builts
▪ Fill in protocols, check-sheets and work orders
▪ Work with foreign consultants (vendors)
February 2016 — December 2016
11 months
ISKER Group
Atyrau, isker-group.com/index.php/rus.html
Construction, Real Estate, Architecture... Show more
Electrical engineer
Installation and commitioning equipments of relay protection and automation.
Work with measuring instruments of electrical laboratories (Fluke, Megger, Retom-11,21,51,61).
Knowledge of standards and norms for the delivery of equipment in the oil and gas industry (Agip)
August 2012 — January 2016
3 years 6 months
Tavrida Electric Astana, LLP
Astana, www.tavrida.com/
Industrial Equipment, Machine Tools and Components... Show more
Electrical engineer
Installation vacuum switcher produced by Tavrida Electric and object delivery in operation.
Installation and adjustment equipments of relay protection and automation.
Makes high-voltage tests.
Preparation of detailed documentation of the work performed: Acts of readiness; acceptance; hidden works; protocols; statements; works production; specialized journals; detailed schemes; drawings.
Analysis, development and adjustment of projects.
Project management in the part of the relay protection.
Working with contractors: acceptance of work performed, check the detailed documentation, scheme.
Control of the substation construction, the technical issues involved in the installation of power, switching, measuring equipment and relay protection and automation equipment 10kV.
Skills
Skill proficiency levels
Driving experience
Driver's license category B
About me
- Drawing, reading and calculation schemes
- Knowledge relay protection
- Troubleshooting, scheduled maintenance of electrical equipment.
- Working with a variety of instrumentation
- Assembling Electrical switchboards
- Fulfillment of electric installation works on the stage of project development to commissioning.
- Group V safety in electrical installations
Higher education
2012
Higher education
Electric power engineering, Electrical engineer
Languages
Professional development, courses
2012
English courses
Friendship, Karaganda, Intermediate certificate
Citizenship, travel time to work
Citizenship: Kazakhstan
Permission to work: Kazakhstan
Desired travel time to work: Doesn't matter






