Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas more than two weeks ago
Male, 29 years, born on 3 August 1996
Atyrau, willing to relocate, prepared for business trips
Process Engineer
2 500 $ in hand
Specializations:
- Production engineer, quantity surveyor
- Construction project manager
- Technologist
Employment type: full time
Work experience 7 years 4 months
February 2021 — currently
5 years 4 months
KPJV - 3GP
3GP Productivity Engineer Slug Catchers
Interface on a day-to-day basis between Area Business Partner and TCO Construction teams as well
as Planning and Workface Planning teams to ensure on-time execution of Project-wide and area-
based milestones and objectives. Responsibilities include but not limited to the following:
Prior to any Production Control focused meeting to be able to review company
schedule/120DLA/4WLA schedules; to be familiar with all IWPS associated with scope of control
along with supporting drawings as well as material/engineering and other construction constraints
Facilitate Milestone Mapping sessions with TCO and Business Partner Area Construction Teams to
agree and identify upcoming tangible milestones, definition of scope and conditions of satisfaction
Working closely with the Systems Completion department to achieve MC Dates and WD Dates of
subsystems before walkdown.
Actively participate in Production Control and other Area Construction meetings to increase
awareness of construction activities completed as well as future construction work fronts and
provide visibility and control of the process for NFI initiated to QVD closed
Work with Construction and Quality Teams to liquidate backlog of inspections for verified
construction complete scopes
Confirm and track process of NFI initiation for construction complete activities and expedite
Facilitate Production Scheduling Mapping sessions with area teams to create a robust production
schedule that represents sequence of activities that is in alignment with execution planning strategies
Facilitate weekly Production Scheduling session to ensure the latest activities are in line with the
Level 4 schedule. Ensure constraints are properly identified
Facilitate Daily Production Planning sessions to update all completed activities and next day
planning. Confirm why activities were not completed (if applicable) for continuous improvement
purposes. Validate recorded commitments during daily site walks
Coach Persons in Charge (PIC’s) and Work Responsible Persons (WRP’s) during weekly game
planning to ensure required quantities are aligned with latest production schedule
Ensure Productivity Manager/Area Construction Managers are aware of all negative/positive PPC
analytic trends
Develop and manage various ad hoc requests to support construction activities.
August 2020 — February 2021
7 months
AGP-Holding LLP
Construction Engineer
• Provide technical supervision over the implementation of construction and installation works.
• Check the compliance of the volume of construction and installation work, as well as structures of the approved design and estimate documentation, working drawings, building codes and regulations, standards, technical conditions, labor protection standards.
• Take part in the consideration and approval of changes in design solutions arising during construction, promptly resolves issues of replacing, if necessary, materials, products, structures (without reducing the quality of construction objects).
• Examine the causes of delays and deterioration in the quality of construction Installation work, take part in their elimination.
• Carrie out technical acceptance of completed construction and installation works and objects, prepares the necessary technical documentation.
• Keep records of completed construction and installation works and prepares the necessary data for reporting on the implementation of construction plans.
• Check the estimate documentation for the construction of facilities, calculate the cost, record the work performed.
• Carrie out individual service assignments from my supervisor.
April 2019 — March 2020
1 year
CB&I Europe BV
Lead Translator
Attending/Translating during daily and weekly progress meetings.
Translating scientific, technical, technical-regulatory and shipping documentation, as well as
materials from conferences, meetings, seminars, etc.
Oral consecutive translation of meetings, negotiations, presentations, speeches.
Full linguistic support for the activities of the managers (expat).
Also was involved in delivery of construction materials to the worksites in timely manner.
Working both in 3GP and 3GI.
Assisting field engineers in their daily tasks (preparation PTW documentation, estimation of
materials, summary of drawings).
Overseeing multi discipline works on job site and ensuring availability of tank materials and
consumables.
Participating in preparation of PPHA and preparing all necessary PTW
March 2018 — June 2018
4 months
AKTOBEREFINERY LLP
Process Plant Operator Assistant
Maintain an oil refining unit, which includes such equipment as shell-and-tube heat exchangers,
separators, compressors, rectification columns, heating furnaces for oil pipelines, a block of an
electric desalting unit, as well as work with instrumentation and control equipment
Setting up and monitoring the operation of the oil refinery.
Ability to start the plant, put it into the mode, and be able to stop the plant under normal and
emergency conditions.
Regulation and production of products in accordance with standards.
Basic laboratory analysis of oil, oil products (density measurement, determination of fractional
compositions, determination of salts, and determination of water in oil using the Dean-Stark
method), calculations and analysis of calculations performed.
Sampling for chemical analysis.
Preparation of simple and complex solutions, calculation of their morality and normality
January 2018 — March 2018
3 months
AKTOBEREFINERY LLP
Laboratory Assistant
Basic laboratory analysis of oil, oil products (density measurement, determination of fractional
compositions, determination of salts, and determination of water in oil using the Dean-Stark
method), calculations and analysis of calculations performed. Sampling for chemical analysis.
Preparation of simple and complex solutions, calculation of their morality and normality
Skills
Skill proficiency levels
Driving experience
Own car
Driver's license category BAbout me
Fluent in 3 languages: Kazakh, Russian, English
Knowledge of:
SCMT Database, CoreWorx, VBC Dashboard, eB Chevron, FED (Facility Engineering Database), Power-
Bi Swift Dashboard, PowerPoint, Adobe Premiere, Adobe Reader, POL, Navisworks Manage, AutoCAD,
Compass 3D LT, Microsoft Excel Advance, TCO First Aid, Confined Space, Working at heights, Avon
Hood Training.
Certificate of participation in the Access Alumni Reunion “SKILLS FOR SUCCESS WITH ASAA”
Higher education
2018
Higher education
AKTOBE REGIONAL STATE UNIVERSITY named after K.Zhubanov
Chemistry and Chemical Technology, Process Engineer GPA 3,64 (Diploma with Certificate of Honors)
2016
Higher education
Aktobe Educational Advising Center
English courses, Intermediate
Languages
Tests, examinations
2020
Macquarie University - Sydney
Coursera, Excel Skills for Business: Essentials
2020
Engineering Project Management: Scope, Time and Cost Management
Rice University, Houston, Texas, USA, Engineering Project Management
2020
Engineering Project Management: Initiating and Planning
Rice University, Houston, Texas, USA, Engineering Project Management
Citizenship, travel time to work
Citizenship: Kazakhstan
Permission to work: Kazakhstan
Desired travel time to work: Doesn't matter
